Plant |
Utility |
Title |
Date Received |
ML# |
Decision Date |
ML# |
Limerick, Units 1 and 2 |
Exelon Generation Company, LLC |
Part 26 Exemption - Work Hours |
04/02/2020 |
ML20093M206 |
04/03/2020 |
ML20093M820 |
Ginna |
Exelon Generation Company, LLC |
Part 26 Exemption - Work Hours |
04/06/2020 |
ML20097D488 |
04/07/2020 |
ML20095H256 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Part 26 Exemption - Work Hours |
04/07/2020 |
ML20098G313 |
04/08/2020 |
ML20099A499 |
Surry, Units 1 and 2 |
Virginia Electric and Power Company |
Part 73 Exemption - Appendix B, Section VI.C.2.(a) and (b) |
04/06/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
04/09/2020 |
ML20098E690 |
Braidwood, Units 1 and 2 |
Exelon Generation Company, LLC |
Part 26 Exemption - Work Hours |
04/09/2020 |
ML20100M588 |
04/13/2020 |
ML20099A519 |
Seabrook, Unit No. 1 |
NextEra Energy Seabrook, LLC |
Part 26 Exemption - Work Hours |
04/10/2020 |
ML20101M597 |
04/13/2020 |
ML20101G991 |
Palo Verde, Units 1, 2, and 3 |
Arizona Public Service Co. |
Part 26 Exemption - Work Hours |
04/14/2020 |
ML20105A481 |
04/16/2020 |
ML20107F835 |
Oconee, Units 1, 2, and 3 |
Duke Energy Carolinas, LLC |
Part Exemption 73 - Appendix B, VI.C.3.(l)(1) |
04/14/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
04/17/2020 |
ML20104C067 |
Beaver Valley, Units 1 and 2 |
Energy Harbor Nuclear Corp. |
Part 26 Exemption - Work Hours |
04/18/2020 |
ML20109A008 |
04/18/2020
(Verbal)
04/20/2020
(Written)
|
ML20109A010
(Verbal)
ML20109A000
(Written)
|
Indian Point, Units 2 and 3 |
Entergy Nuclear Operations, Inc. |
Exemption from 10 CFR 50, Appendix R, Section III.H |
04/13/2020
04/16/2020(S) |
ML20104C121
ML20107J551 |
04/22/2020 |
ML20109A001 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 55, "Operators' Licenses" |
05/04/2020 |
ML20126G379 |
05/07/2020 |
ML20125A379 |
Salem, Unit Nos. 1 and 2 |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 55, "Operators' Licenses" |
05/04/2020 |
ML20126G378 |
05/07/2020 |
ML20122A140 |
Davis-Besse, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
04/23/2020
05/06/2020(S) |
ML20114E221
ML20128J218 |
05/08/2020 |
ML20119B068 |
Perry, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
04/24/2020
05/06/2020(S) |
ML20115E551
ML20128J218 |
05/11/2020 |
ML20119A268 |
Fermi-2 |
DTE Electric Company |
Part 26 Exemption - Work Hours |
05/11/2020 |
ML20132A239 |
05/14/2020 |
ML20133K055 |
Vogtle, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/08/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/14/2020 |
ML20126G266 |
Robinson, Unit 2 |
Duke Energy Progress, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
04/30/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/14/2020 |
ML20129J867 |
Beaver Valley, Units 1 and 2 |
Energy Harbor Nuclear Corp. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
04/23/2020
Non-Public,
withheld under
10 CFR 2.390
05/06/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20128J218 |
05/19/2020 |
ML20119B083 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/12/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/19/2020 |
ML20134J083 |
Salem, Unit Nos. 1 and 2 |
Peach Bottom, Units 2 and 3 |
Exelon Generation, LLC. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/08/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/20/2020 |
ML20132A285 |
Duane Arnold |
NextEra Energy Duane Arnold, LLC. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/01/2020
Non-Public,
withheld under
10 CFR 2.390
05/20/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20141L497 |
05/26/2020 |
ML20139A006 |
Salem, Unit Nos. 1 and 2 |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 55, "Operators' Licenses" |
05/21/2020 |
ML20142A513 |
05/29/2020 |
ML20148M329 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 55, "Operators' Licenses" |
05/21/2020 |
ML20142A512 |
05/29/2020 |
ML20148M318 |
Comanche Peak, Units 1 and 2 |
Vistra Operations Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/14/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/29/2020 |
ML20136A141 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Requirements of 10 CFR 50.71(e)(4) |
05/14/2020 |
ML20135H021 |
06/02/2020 |
ML20140A356 |
Hatch, Units Nos. 1 and 2 |
Southern Nuclear Operating Company |
Exemption From Certain Requirements of 10 CFR, Part 50, Appendix R, Section III.I Related to Quarterly Fire Brigade Drills |
05/22/2020
05/27/2020(S) |
ML20143A253
ML20149K302 |
06/02/2020 |
ML20147A147 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption From Certain Requirements of 10 CFR 50.48 Related to Quarterly Fire Brigade Drills |
05/22/2020
05/27/2020(S) |
ML20143A253
ML20149K302 |
06/02/2020 |
ML20147A171 |
Hatch, Unit Nos. 1 and 2 |
Southern Nuclear Operating Company |
Exemption From Certain Requirements of 10 CFR, Part 50, Appendix R, Section III.I Related to Annual Live Fire Fighting Training |
05/22/2020
05/27/2020(S) |
ML20143A253
ML20149K302 |
06/02/2020 |
ML20147A133 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption From Certain Requirements of 10 CFR 50.48 Related to Annual Live Fire Fighting Training |
05/22/2020
05/27/2020(S) |
ML20143A253
ML20149K302 |
06/02/2020 |
ML20147A465 |
Seabrook, Unit No. 1 |
NextEra Energy Seabrook, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/21/2020
05/22/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/08/2020 |
ML20143A273 |
Harris, Unit 1 |
Duke Energy Progress, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/20/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/09/2020 |
ML20142A185 |
St. Lucie, Unit Nos. 1 and 2 |
Florida Power & Light Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/10/2020 |
ML20155K712 |
Indian Point, Unit Nos. 2 and 3 |
Entergy Nuclear Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
04/29/2020
05/27/2020(S) |
ML20125A327
ML20148M389 |
06/12/2020 |
ML20156A057 |
Millstone, Units 1, 2, and 3 |
Dominion Energy Nuclear Connecticut, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/28/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/12/2020 |
ML20161A409 |
North Anna, Units 1 and 2 |
Virginia Electric and Power Company |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/28/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/12/2020 |
ML20150A292 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/15/2020 |
ML20153A011 |
Turkey Point, Units 3 and 4 |
Florida Power & Light Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/15/2020 |
ML20149K606 |
South Texas Project, Units 1 and 2 |
STP Nuclear Operating Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/21/2020 |
ML20142A520 |
06/18/2020 |
ML20155K679 |
McGuire, Units 1 and 2 |
Duke Energy Carolinas, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/04/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/23/2020 |
ML20159A002 |
Callaway, Unit No. 1 |
Union Electric Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/04/2020
06/17/2020(S) |
ML20156A192
ML20169A542 |
06/23/2020 |
ML20169A446 |
Ginna |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/08/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/24/2020 |
ML20156A151 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/17/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/24/2020 |
ML20170A319 |
FitzPatrick |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
05/29/2020
06/04/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/29/2020 |
ML20164A210 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/19/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/29/2020 |
ML20175A121 |
Hatch, Units 1 and 2 |
Three Mile Island, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/05/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
06/30/2020 |
ML20161A391 |
Brown's Ferry, Units 1, 2, and 3 |
Tennessee Valley Authority |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/19/2020 |
ML20174A281 |
07/06/2020 |
ML20175A198 |
Braidwood, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/15/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
07/09/2020 |
ML20169A348 |
Summer, Unit 1 |
Dominion Energy South Carolina |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/25/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
07/10/2020 |
ML20182A718 |
Fermi-2 |
DTE Electric Company |
Extension of Exemption from Specific Requirements of 10 CFR Part 26 |
07/06/2020
07/11/2020(S) |
ML20188A339
ML20193A003 |
07/14/2020 |
ML20192A180 |
DC Cook, Units 1 and 2 |
Indiana Michigan Power Company |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/18/2020
Non-Public,
withheld under
10 CFR 2.390
07/06/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20191A170 |
07/21/2020 |
ML20171A686 |
Monticello |
Northern States Power Company – Minnesota |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
06/25/2020
07/14/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
07/22/2020 |
ML20184A013 |
Prairie Island, Units 1 and 2 |
St. Lucie, Unit Nos. 1 and 2 |
Florida Power & Light Co. |
Exemption from Certain Requirements of 10 CFR Part 26 |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390
06/12/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20164A055
|
07/23/2020 |
ML20190A157 |
Duane Arnold |
NextEra Energy Duane Arnold, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390
06/15/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20167A262
|
07/24/2020 |
ML20202A594 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 |
05/21/2020
Non-Public,
withheld under
10 CFR 2.390
06/12/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20164A187
|
07/24/2020 |
ML20202A531 |
Seabrook, Unit No. 1 |
NextEra Energy Seabrook, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 |
05/27/2020
Non-Public,
withheld under
10 CFR 2.390
06/16/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20169A728 |
07/30/2020 |
ML20202A509 |
Turkey Point, Units 3 and 4 |
Florida Power & Light Co. |
Exemption from Certain Requirements of 10 CFR Part 26 |
05/21/2020
06/11/2020(S) |
ML20142A272
ML20163A226 |
07/30/2020 |
ML20204A765 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/21/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
07/30/2020 |
ML20209A050 |
Hope Creek |
PSEG Nuclear, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/21/2020 |
ML20204A724 |
08/03/2020 |
ML20204A937 |
Salem, Unit Nos. 1 and 2 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/17/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/03/2020 |
ML20203M233 |
Clinton, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/23/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/13/2020 |
ML20209A000 |
Byron, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/30/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/17/2020 |
ML20213C177 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 (Work Hours) |
08/06/2020 |
ML20219A448 |
08/17/2020 |
ML20219A751 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Co. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
08/07/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/18/2020 |
ML20220A673 |
Hatch, Units 1 and 2 |
Limerick, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
07/29/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/19/2020 |
ML20209A525 |
Palisades |
Entergy Nuclear Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
08/04/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/21/2020 |
ML20219A156 |
Cooper |
Nebraska Public Power District |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
06/24/2020
07/28/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/24/2020 |
ML20212J176 |
Nine Mile Point, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
07/24/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/25/2020 |
ML20218A860 |
Waterford |
Entergy Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
08/06/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/27/2020 |
ML20227A368 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Exemption from Select Requirements of 10 CFR Part 55, "Operators' Licenses" |
08/05/2020
08/17/2020(S) |
ML20218A702
ML20230A299 |
08/27/2020 |
ML20231A519 |
Dresden, Units 2 and 3 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
07/28/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/27/2020 |
ML20216A260 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
07/27/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
08/27/2020 |
ML20211L833 |
Fitzpatrick |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 |
08/20/2020 |
ML20233A814 |
08/28/2020 |
ML20238B947 |
Cooper |
Nebraska Public Power District |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," Section IV.F |
06/16/2020 |
ML20191A276 |
09/03/2020 |
ML20203M129 |
Peach Bottom, Units 2 and 3 |
Exelon Generation, LLC. |
Exemption from Certain Requirements of 10 CFR Part 26 |
08/28/2020 |
ML20241A078 |
09/10/2020 |
ML20247J620 |
Fermi-2 |
DTE Electric Company |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
08/06/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
09/10/2020 |
ML20226A116 |
Perry, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," Section IV.F |
08/03/2020 |
ML20216A258 |
09/11/2020 |
ML20246G054 |
Surry, Units 1 and 2 |
Virginia Electric and Power Company |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
08/20/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
09/16/2020 |
ML20241A000 |
Byron, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 (Work Hours) |
09/03/2020 |
ML20248H361 |
09/16/2020 |
ML20253A062 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," Section IV.F |
07/09/2020 |
ML20191A204 |
09/18/2020 |
ML20247J651 |
Susquehanna, Units 1 and 2 |
Susquehanna Nuclear, LLC. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
08/18/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
09/22/2020 |
ML20232C272 |
Dresden, Units 2 and 3 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 (Work Hours) |
09/14/2020 |
ML20259A116 |
09/28/2020 |
ML20259A492 |
Arkansas Nuclear One, Units 1 and 2 |
Entergy Operations, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
07/13/2020
09/01/22020(S) |
ML20195A397
ML20255A116(S) |
10/06/2020 |
ML20265A057 |
DC Cook, Units 1 and 2 |
Indiana Michigan Power Company |
Exemption from Certain Requirements of 10 CFR Part 26 (Work Hours) |
10/08/2020 |
ML20283A381 |
10/09/2020 |
ML20283A263 |
Calvert Cliffs, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
09/08/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
10/09/2020 |
ML20264E689 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Extension of Exemption from Certain Requirements of 10 CFR Part 26 (Work Hours) |
10/06/2020
10/08/2020 |
ML20280A621
ML20282A706 |
10/15/2020 |
ML20282A332 |
Grand Gulf, Unit 1 |
Entergy Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
09/17/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
10/19/2020 |
ML20266G289 |
Callaway, Unit No. 1 |
Union Electric Co |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
09/03/2020
09/18/2020(S)
Non-Public,
withheld under
10 CFR 2.390
|
ML20247J644
Non-Public,
withheld under
10 CFR 2.390
|
10/20/2020 |
ML20268A189 |
South Texas Project, Units 1 and 2 |
STP Nuclear Operating Co. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
08/11/2020
09/10/2020 |
ML20224A211
ML20254A217 |
10/26/2020 |
ML20279A531 |
Catawba, Units 1 and 2 |
Duke Energy Carolinas, LLC |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
10/05/2020
10/22/2020(S)
Non-Public,
withheld under
10 CFR 2.390
|
Non-Public,
withheld under
10 CFR 2.390 |
11/02/2020 |
ML20300A312 |
Palo Verde, Units 1, 2, and 3 |
Arizona Public Service Co. |
Part 26 Exemption - Work Hours |
10/28/2020 |
ML20302A417 |
11/02/2020 |
ML20303A015 |
Susquehanna, Units 1 and 2 |
Susquehanna Nuclear, LLC |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/28/2020
10/09/2020(S) |
ML20272A020
ML20283A772 |
11/06/2020 |
ML20294A291 |
Beaver Valley, Units 1 and 2 |
Energy Harbor Nuclear Corp. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/22/2020
10/09/2020(S) |
ML20266G336
ML20283A772 |
11/06/2020 |
ML20288A640 |
Peach Bottom, Units 2 and 3 |
Exelon Generation, LLC. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/25/2020
10/09/2020(S) |
ML20269A267
ML20283A772 |
11/06/2020 |
ML20288A718 |
Prairie Island, Units 1 and 2 |
Northern States Power Company – Minnesota |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
10/07/2020 |
ML20281A665 |
11/09/2020 |
ML20297A239 |
Sequoyah, Units 1 and 2 |
Tennessee Valley Authority |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/30/2020 |
ML20274A362 |
11/10/2020 |
ML20288A546 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Co. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/21/2020 |
ML20265A353 |
11/10/2020 |
ML20295A502 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/24/2020 |
ML20269A392 |
11/12/2020 |
ML20288A142 |
Callaway, Unit No. 1 |
Union Electric Co. |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/05/2020 |
ML20310A333 |
11/17/2020 |
ML20317A153 |
Fermi-2 |
DTE Electric Company |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/10/2020 |
ML20315A373 |
11/18/2020 |
ML20317A272 |
Davis-Besse, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/18/2020 |
ML20323A169 |
11/19/2020 |
ML20323A412 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
10/26/2020 |
ML20300A588 |
11/20/2020 |
ML20309A887 |
Salem, Unit Nos. 1 and 2 |
Beaver Valley, Units 1 and 2 |
Energy Harbor Nuclear Corp. |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/20/2020 |
ML20328A006 |
11/23/2020 |
ML20326A000 |
Perry, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/20/2020 |
ML20325A070 |
11/23/2020 |
ML20325A158 |
Grand Gulf, Unit 1 |
Entergy Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B, Requirements |
11/13/2020 |
ML20318A386 |
11/24/2020 |
ML20323A047 |
Millstone, Units 1, 2, and 3 |
Dominion Energy Nuclear Connecticut, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/17/2020 |
ML20261H597 |
11/24/2020 |
ML20287A273 |
River Bend, Unit 1 |
Entergy Operations, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
10/06/2020 |
ML20280A734 |
11/25/2020 |
ML20315A345 |
Duane Arnold |
NextEra Energy Duane Arnold, LLC. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/22/2020 |
ML20266G292 |
11/25/2020 |
ML20301A846 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/24/2020 |
ML20329A301 |
12/01/2020 |
ML20330A326 |
Braidwood, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/17/2020
11/23/2020(S) |
ML20323A008
ML20328A215 |
12/01/2020 |
ML20324A002 |
Byron, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/24/2020
12/01/2020(S) |
ML20329A533
ML20336A341 |
12/02/2020 |
ML20332A017 |
DC Cook, Units 1 and 2 |
Indiana Michigan Power Company |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
11/30/2020 |
ML20338A324 |
12/03/2020 |
ML20336A111 |
Palisades |
Entergy Nuclear Operations, Inc. |
Exemption from Certain 10 CFR Part 73, Appendix B Requirements |
11/12/2020 |
ML20317A300 |
12/03/2020 |
ML20330A000 |
Hatch, Units Nos. 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/06/2020 |
ML20311A662 |
12/04/2020 |
ML20329A488 |
Farley, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/06/2020 |
ML20311A662 |
12/04/2020 |
ML20315A374 |
Vogtle, Units 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/06/2020 |
ML20311A662 |
12/04/2020 |
ML20329A392 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld
10 CFR 2.390 |
12/04/2020 |
ML20332A175 |
Hope Creek |
PSEG Nuclear, LLC. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
10/13/2020 |
ML20287A628 |
12/07/2020 |
ML20315A434 |
Salem, Unit Nos. 1 and 2 |
Watts Bar, Units 1 and 2 |
Tennessee Valley Authority |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020 |
ML20309A695 |
12/08/2020 |
ML20318A036 |
North Anna, Units 1 and 2 |
Virginia Electric and Power Company |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
11/10/2020 |
ML20317A162 |
12/08/2020 |
ML20324A222 |
Fermi-2 |
DTE Electric Company |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
11/12/2020 |
ML20317A203 |
12/08/2020 |
ML20332A179 |
DC Cook, Units 1 and 2 |
Indiana Michigan Power Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020 |
ML20318A034 |
12/08/2020 |
ML20324A003 |
FitzPatrick |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/08/2020 |
ML20337A004 |
Indian Point, Units 2 and 3 |
Entergy Nuclear Operations, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
11/08/2020 |
ML20282A612 |
12/08/2020 |
ML20320A000 |
McGuire, Units 1 and 2 |
Duke Energy Carolinas, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020
11/19/2020(S) Non-Public, withheld under 10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/09/2020 |
ML20330A321 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/09/2020 |
ML20324A104 |
Palisades |
Entergy Nuclear Operations, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
09/30/2020 |
ML20275A110 |
12/09/2020 |
ML20308A607 |
Braidwood, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/10/2020 |
ML20322A338 |
South Texas Project, Units 1 and 2 |
STP Nuclear Operating Co. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/16/2020 |
ML20321A331 |
12/10/2020 |
ML20330A312 |
Peach Bottom, Units 2 and 3 |
Exelon Generation, LLC. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/10/2020 |
ML20325A017 |
Byron, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/13/2020 |
ML20323A393 |
Limerick, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/10/2020 |
ML20330A295 |
Ginna |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/10/2020 |
ML20330A291
|
Clinton, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/11/2020 |
ML20323A434 |
Calvert Cliffs, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
|
ML20318A288 |
12/11/2020 |
ML20321A243 |
Cooper |
Nebraska Public Power District |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/27/2020 |
ML20309A663 |
12/11/2020 |
ML20323A237 |
Indian Point, Unit Nos. 2 and 3 |
Entergy Nuclear Operations, Inc. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/12/2020 |
ML20317A299 |
12/14/2020 |
ML20321A121 |
Perry, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/29/2020
11/25/2020(S) |
ML20304A191
ML20335A531 |
12/14/2020 |
ML20309A135 |
Dresden, Units 2 and 3 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/14/2020 |
ML20321A290 |
Nine Mile Point, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020 |
ML20318A288 |
12/14/2020 |
ML20322A303 |
Surry, Unit Nos. 1 and 2 |
Virginia Electric and Power Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/03/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/14/2020 |
ML20339A645 |
Davis-Besse, Unit No. 1 |
Energy Harbor Nuclear Corp |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/29/2020
12/07/2020(S) |
ML20304A046
ML20342A199 |
12/15/2020 |
ML20345A205 |
Point Beach, Units 1 and 2 |
NextEra Energy Point Beach, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/19/2020
Non-Public,
withheld under
10 CFR 2.390
12/08/2020(S) |
Non-Public,
withheld under
10 CFR 2.390
ML20343A180 |
12/15/2020 |
ML20345A000 |
Beaver Valley, Units 1 and 2 |
Energy Harbor Nuclear Corp. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/28/2020 |
ML20303A213 |
12/15/2020 |
ML20324A089 |
North Anna, Units 1 and 2 |
Virginia Electric and Power Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/03/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/15/2020 |
ML20342A293 |
Seabrook, Unit No. 1 |
NextEra Energy Seabrook, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/23/2020
12/08/2020(S) |
ML20329A205
ML20343A112 |
12/16/2020 |
ML20336A006 |
Millstone, Units 1, 2, and 3 |
Dominion Energy Nuclear Connecticut, Inc. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/03/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/16/2020 |
ML20338A552 |
Clinton, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
12/03/2020 |
ML20339A318 |
12/16/2020 |
ML20339A538 |
Comanche Peak, Unit Nos. 1 and 2 |
Vistra Operations Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
12/11/2020
12/15/2020(S) |
ML20346A565
ML20350B830 |
12/16/2020 |
ML20349A038 |
Brown's Ferry, Units 1, 2, and 3 |
Tennessee Valley Authority |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/08/2020 |
ML20343A214 |
12/15/2020 |
ML20343A363 |
Waterford |
Entergy Operations, Inc. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/12/2020 |
ML20317A301 |
12/16/2020 |
ML20338A274 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Certain Requirements of 10 CFR Part 26 – Work Hours |
12/04/2020 |
ML20339A474 |
12/17/2020 |
ML20343A027 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/14/2020
12/03/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20346A024 |
Susquehanna, Units 1 and 2 |
Susquehanna Nuclear, LLC. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/24/2020 |
ML20329A335 |
12/17/2020 |
ML20344A458 |
Columbia |
Energy Northwest |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/29/2020
12/03/2020(S) |
ML20303A286
ML20338A541 |
12/17/2020 |
ML20342A211 |
Columbia |
Energy Northwest |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
10/29/2020 |
ML20303A348 |
12/17/2020 |
ML20336A183 |
Brunswick, Units 1 and 2 |
Duke Energy Progress, LLC. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020
11/19/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20338A329 |
Harris, Unit 1 |
Duke Energy Progress, LLC. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020
11/19/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20330A301 |
Oconee, Units 1, 2, and 3 |
Duke Energy Carolinas, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020
11/19/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20344A004 |
Robinson, Unit 2 |
Duke Energy Progress, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/04/2020
11/19/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20339A521 |
Catawba, Units 1 and 2 |
Duke Energy Carolinas, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
11/19/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/17/2020 |
ML20337A128 |
Summer, Unit 1 |
Dominion Energy South Carolina |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/03/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/18/2020 |
ML20342A003 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Annual Firearms Tactical Qualification Course Requirement of 10 CFR Part 73, Appendix B |
10/14/2020
12/03/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/18/2020 |
ML20346A120 |
Fermi-2 |
DTE Electric Company |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
11/13/2020
12/03/2020(S) |
ML20318A383
ML20338A333 |
12/18/2020 |
ML20343A350 |
St. Lucie, Unit Nos. 1 and 2 |
Florida Power & Light Co. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/09/2020
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/18/2020 |
ML20352A118 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
11/23/2020
12/07/2020(S) |
ML20328A292
ML20342A259 |
12/18/2020 |
ML20346A014 |
Seabrook, Unit No. 1 |
NextEra Energy Seabrook, LLC |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
12/03/2020 |
ML20338A493 |
12/21/2020 |
ML20345A119 |
Prairie Island, Units 1 and 2 |
Northern States Power Company - Minnesota |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/14/2020
12/03/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/21/2020 |
ML20317A259 |
Comanche Peak, Unit Nos. 1 and 2 |
Vistra Operations Company, LLC |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/10/2020 |
ML20345A341 |
12/22/2020 |
ML20350B666 |
Monticello |
Northern States Power Company – Minnesota |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
10/30/2020
12/14/2020(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
12/22/2020 |
ML20317A136 |
River Bend, Unit 1 |
Entergy Operations, Inc. |
Temporary Exemption from Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
12/03/2020 |
ML20338A539 |
12/22/2020 |
ML20344A135 |
Palo Verde, Units 1, 2, and 3 |
Arizona Public Service Co. |
Subsequent Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
12/21/2020 |
ML20356A292 |
12/23/2020 |
ML20357A055 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
12/23/2020 |
ML20358A186 |
12/28/2020 |
ML20358A281 |
Salem, Units 1 and 2 |
Palo Verde, Units 1, 2, and 3 |
Arizona Public Service Co. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/18/2020 |
ML20353A391 |
01/05/2021 |
ML20355A000 |
Hatch, Units Nos. 1 and 2 |
Southern Nuclear Operating Company |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/06/2021 |
ML21006A227 |
01/11/2021 |
ML21005A305 |
Fermi-2 |
DTE Electric Company |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/04/2021 |
ML21004A195 |
01/13/2021 |
ML21005A421 |
Duane Arnold |
NextEra Energy Duane Arnold, LLC. |
Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B |
12/29/2020 |
ML20364A039 |
01/13/2021 |
ML21004A215 |
Callaway, Unit No. 1 |
Union Electric Co. |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
12/31/2020
01/07/2021(S) |
ML20366A062
ML21007A374 |
01/14/2021 |
ML21012A009 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/22/2021 |
ML21022A372 |
02/02/2021 |
ML21025A294 |
Comanche Peak, Units 1 and 2 |
Vistra Operations Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
02/08/2021
02/09/2021(S)
02/10/2021(S) |
ML21039A688
ML21040A512
ML21041A541 |
02/11/2021 |
ML21040A001 |
Calvert Cliffs, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/21/2021 |
ML21022A009 |
02/18/2021 |
ML21029A336 |
Nine Mile Point, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/22/2021 |
ML21022A230 |
02/23/2021 |
ML21029A309 |
Quad Cities, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
02/17/2021 |
ML21049A051 |
03/01/2021 |
ML21050A182 |
Diablo Canyon, Units 1 and 2 |
Pacific Gas & Electric Co. |
Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR Part 73, Appendix B, "General Criteria for Security Personnel," Subsection A.7 |
02/04/2021
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
03/03/2021 |
ML21047A255 |
Hope Creek |
PSEG Nuclear, LLC. |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
02/25/2021 |
ML21056A442 |
03/03/2021 |
ML21056A542 |
Salem, Unit Nos. 1 and 2 |
Braidwood, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
01/25/2021 |
ML21056A514 |
03/30/2021 |
ML21057A189 |
Limerick, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
03/04/2021 |
ML21064A002 |
04/06/2021 |
ML21078A050 |
Davis-Besse, Unit No. 1 |
Energy Harbor Nuclear Corp. |
Temporary Exemption from Certain Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
03/15/2021 |
ML21074A367 |
04/19/2021 |
ML21098A180 |
Fermi-2 |
DTE Electric Company |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
04/19/2021 |
ML21109A136 |
04/22/2021 |
ML21109A374 |
Clinton, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
04/20/2021 |
ML21111A004 |
04/29/2021 |
ML21112A007 |
Comanche Peak, Units 1 and 2 |
Vistra Operations Company, LLC |
Temporary Exemption from Certain Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
04/21/2021 |
ML21111A364 |
05/17/2021 |
ML21119A349 |
Comanche Peak, Units 1 and 2 |
Vistra Operations Company, LLC |
Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR Part 73, Appendix B, "General Criteria for Security Personnel," Subsection A.7 |
04/21/2021
05/12/2021(S)
Non-Public,
withheld under
10 CFR 2.390 |
Non-Public,
withheld under
10 CFR 2.390 |
05/19/2021 |
ML21133A003 |
Fermi-2 |
DTE Electric Company |
Temporary Exemption from Certain Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
05/17/2021 |
ML21137A234 |
06/17/2021 |
ML21159A054 |
Wolf Creek |
Wolf Creek Nuclear Operating Company |
Temporary Exemption from Certain Biennial Emergency Preparedness Exercise Requirements of 10 CFR Part 50, Appendix E, Section IV.F |
07/29/2021
08/12/2021 |
ML21210A450
ML21224A225 |
08/25/2021 |
ML21225A024 |
Ginna |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
09/21/2021 |
ML21265A159 |
09/28/2021 |
ML21267A013 |
Peach Bottom, Units 2 and 3 |
Exelon Generation Company, LLC |
Exemption from Select Requirements of 10 CFR Part 26 (Work Hours) |
09/17/2021 |
ML21260A162 |
10/13/2021 |
ML21265A438 |
Fermi-2 |
DTE Electric Company |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
12/06/2021 |
ML21340A030 |
12/09/2021 |
ML21340A245 |
Turkey Point, Units 3 and 4 |
Florida Power & Light Co. |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
12/30/2021 |
ML21364A050 |
12/30/2021 |
ML21364A052 |
Hope Creek |
PSEG Nuclear, LLC |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
01/05/2022 |
ML22005A364 |
01/07/2022 |
ML22005A323 |
Salem, Units Nos. 1 and 2 |
Davis-Besse |
Energy Harbor Nuclear Corp. |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
01/12/2022 |
ML22012A301 |
01/14/2022 |
ML22012A399 |
Clinton, Unit 1 |
Exelon Generation Company, LLC |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
01/13/2022 |
ML22014A005 |
01/14/2022 |
ML22013B277 |
Palo Verde, Units 1, 2, and 3 |
Arizona Public Service Co. |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
01/19/2022 |
ML22020A017 |
01/21/2022 |
ML22020A040 |
Calvert Cliffs, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
02/03/2022 |
ML22035A078 |
02/04/2022 |
ML22034A812 |
LaSalle, Units 1 and 2 |
Exelon Generation Company, LLC |
Exemption from Specific Requirements of 10 CFR Part 26 (Work Hours) |
02/10/2022 |
ML22041A451 |
02/15/2022 |
ML22042A076 |