TOPIC ACTION DATE ENDORSING DOCUMENT RESULT
CRGR Internal Discussion None 01/10/2008 CRGR #419, ML080220316 Discussed initial plans for future CRGR activities resulting from recent directions from the Commission and EDO, as well as from public interactions
Regulatory Issue Summary 2008-XX, "Notice Regarding Individuals Under a Federal Firearms Disability" Informal Review 02/12/2008 N/A Waived
Regulatory Issue Summary 2008-10, "Notice Regarding Forthcoming Federal Firearms Background Checks" Informal Review 02/12/2008 N/A Waived with comments
Regulatory Issue Summary 2008-XX, "Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal" Informal Review 02/20/2008 N/A Waived
Regulatory Issue Summary 2008-14, "Use of Tormis Computer Code for Assessment of Tornado Missile Protection" Informal Review 03/03/2008 N/A Waived
Draft Regulatory Issue Summary 2005-20, Rev. 1, "Revision to NRC Inspection Manual Part 9900 Technical Guidance, "Operability Determinations and Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety"" Formal Review 03/06/2008 CRGR #420, ML080700025 The CRGR suggested and the staff agreed to modify and include additional text in the "Backfit Section" of the RIS. The staff modification will provide a clearer understanding of why the subject RIS is not considered a backfit.
Regulatory Issue Summary 2008-08, "Endorsement of Revision 1 to Nuclear Energy Institute Guidance Document NEI 06-04, "Conducting a Hostile Action-Based Emergency Response Drill"" Informal Review 03/14/2008 N/A Waived
Regulatory Issue Summary 2008-10, "Fatigue Analysis of Nuclear Power Plant Components" Informal Review 04/11/2008 N/A Waived
Regulatory Issue Summary 2008-26, "Clarified Requirements of Title 10 of The Code of Federal Regulations (10 CFR) Paragraph 50.54(y) When Implementing 10 CFR Paragraph 50.54(x) to Depart From a License Condition or Technical Specification" Informal Review 04/11/2008 N/A Waived
Regulatory Issue Summary 2008-27, "Staff Position on Requests for One-time Extension of Integrated Leak Rate Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50" Informal Review 04/30/2008 N/A Waived
Regulatory Guide (RG) 1.84, "Design, Fabrication, and Materials Code Case Acceptability ASME Section III," and RG 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1" Informal Review 05/01/2008 N/A Waived
Regulatory Issue Summary 2008-15, "Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process" Informal Review 05/13/2008 N/A Waived
NRC Regulatory Information Summary 2008-21, "Issuance of LIC-109 'Acceptance of Review Procedures'" Informal Review 07/11/2008 N/A Waived
NRC Regulatory Issue Summary 2008-27, "Staff Position on Requests for One-time Extension of Integrated Leak Rate Test Interval Beyond 15 Years Under Option B of Appendix J To 10 CFR Part 50" Informal Review 07/28/2008 N/A Waived
NRO-REG-300, "Maintaining and Updating the Standard Review Plan (SRP)" Informal Review 08/04/2008 N/A Waived
NRO-REG-301, "Development and Issuance of Interim Staff Guidance (ISG)" Informal Review 08/04/2008 N/A Waived
NRC Regulatory Information Summary 2008-22, "Notification Of Licensees Regarding Aircraft Threats" Informal Review 08/20/2008 N/A Waived
CRGR Internal Discussion None 09/04/2008 CRGR #421, ML082520591 The CRGR discussed; the status of the various past CRGR items of interest, plans for CRGR support activities for the Office of Human Resources (HR) agencywide web-based backfit training program, bifurcated rules, regulatory guides, and the preliminary audit findings obtained from the Office of the Inspector General regarding the CRGR activities.
NRC Regulatory Issue Summary 2008-10, Supplement 1, "Notice Regarding Forthcoming Federal Firearms Background Checks" Informal Review 09/19/2008 N/A Waived
NRC Regulatory Issue Summary 2008-28, "Endorsement of NEI Guidance for Reactor Vessel Head Heavy Load Lifts" Informal Review 09/22/2008 N/A Waived
NRC Regulatory Issue Summary 2008-32 "Interim Low Level Radioactive Waste Storage at Reactor Sites" Informal Review 12/17/2008 N/A Waived