Results of Previous CRGR Reviews – 2012

TOPIC ACTION DATE ENDORSING DOCUMENT RESULT
Draft Regulatory Issue Summary 2012-02, "Insights into Recent License Renewal Application Consistency with the Generic Aging Lessons Learned Report" Informal Review 01/13/2012 N/A Waived
Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Informal Review 02/15/2012 N/A Waived
Regulatory Issue Summary 2012-03, "Reintegration of Security into the Reactor Oversight Process Assessment Program" Informal Review 03/07/2012 N/A Waived
Response to Public Comments on Docket ID NRC-2011-0013 Proposed Generic Communications: Draft NRC Regulatory Issue Summary 2011-12: Adequacy of Station Electric Distribution System Voltage Informal Review 03/27/2012 N/A Waived
Proposed Generic Bulletin 2012-01, "Design Vulnerability in Electric Power System" Formal Review 05/02/2012 CRGR #432 ML12101A373 The CRGR did not identify any backfit issues in the BL as written. The CRGR recommended and the staff agreed to modify some text in the, "Requested Action" section of the BL.
Regulatory Issue Summary (RIS) 2012-10, "NRC Staff Position on Applying Surveillance Requirements 3.0.2 and 3.0.3 to Administrative Controls Program Tests" Informal Review 06/26/2012 N/A Elevated to a formal review (see CRGR Meeting No. 433 below) 
Regulatory Issue Summary (RIS) 2012-08, "Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52" Informal Review  06/29/2012 N/A Waived
Regulatory Issue Summary (RIS) 2012-10, "NRC Staff Position on Applying Surveillance Requirements 3.0.2 and 3.0.3 to Administrative Controls Program Tests" Formal Review 07/18/2012 CRGR #433 ML122060079 This briefing was held at the request of the CRGR for clarifications. The staff agreed with the CRGR that the text creating the 3 year limit on enforcement discretion (pg. 4 of the EGM) should be removed because of backfit implications.
Regulatory Issue Summary (RIS) 2012-09, "Endorsement of Nuclear Energy Institute Guidance for Using an Alternative Method to Manage Cumulative Fatigue at Nuclear Power Reactor Sites" Informal Review  07/25/2012 N/A Waived
Draft Generic Letter (GL) 2012-XX "Adequacy of Station Electric Distribution Systems Voltages - Degraded Voltage Protection" Informal Review 07/30/2012 N/A Waived
Regulatory Issue Summary (RIS) 2012-11, "NRC Staff Position on Dispositioning Boiling-Water Reactor Licensee Noncompliance with Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel" Informal Review 07/30/2012 N/A Waived
U.S. Nuclear Regulatory Commission Regulation (NUREG) 1482, Revision 2, "Guidelines for Inservice Testing at Nuclear Power Plants - Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants" Informal Review 10/01/2012 N/A Waived