10/22/2015 | NRC | Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant Unit 2 |
10/22/2015 | TVA | Watts Bar, Unit 2 Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement |
10/22/2015 | NRC | Watts Bar Nuclear Plant Unit 2, Record of Decision |
10/15/2015 | NRC | Readiness of Watts Bar Unit 2 to Receive an Operating License |
10/14/2015 | NRC | Mitigating Strategies Close out Bulletin 2011-01 (TAC No. MF6767) |
10/13/2015 | NRC | Watts Bar Unit 2 Closure of IEB 77-04 and IEB 75-08 |
10/09/2015 | TVA | Watts Bar, Unit 2 – Technical Specification 3.2.1 Heat Flux Hot Channel Factor (FQ(Z)) Revision 0 License Condition and Margin Assessment |
10/09/2015 | TVA | Watts Bar 2 Distributed Control System (DCS) Data Storm Test Results |
10/08/2015 | TVA | Watts Bar, Unit 2 – Response to Follow-up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results |
10/07/2015 | TVA | Watts Bar, Unit 2 - Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License |
10/07/2015 | TVA | Watts Bar, Unit 2 - Response to Request for Additional Information - Developmental Revision I Technical Specification Section 3.8 - Diesel Generator Batteries. |
10/05/2015 | NRC | Watts Bar, Unit 2 - Seismic Hazard Re-Evaluations Relating to Recommendation 2.1 of the Near-Term Task Force Review of Insight from the Fukushima Dai-Chi Accident. |
10/05/2015 | NRC | Watts Bar, Unit 1 - Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 of the NTTF Review of Insights. |
10/01/2015 | NRC | Watts Bar Nuclear Plant, Unit 2 - Relief from the Requirements of the ASME Code for the First 10-Year Interval of the Steam Generator Inservice Inspection (TAC No. MF6474). |
09/30/2015 | TVA | Watts Bar, Unit 2 - Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (FQ (Z)), Revision 0. |
09/29/2015 | TVA | Watts Bar, Unit 2 - Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement. |
09/25/2015 | TVA | Sequoyah and Watts Bar - Tenth Progress Update on Improved Flood Mitigation System Project |
09/24/2015 | TVA | Watts Bar, Unit 2 - Submittal of 30-Day Response to NRC Bulletin 2011 -01, "Mitigating Strategies." |
09/24/2015 | TVA | Watts Bar, Unit 2 - Financial Protection Requirements and Indemnity Agreements – Insurance Status Supplement. |
09/23/2015 | TVA | Watts Bar, Unit 2 - Response to Additional Question Regarding Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2 |
09/23/2015 | TVA | Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases. |
09/21/2015 | TVA | Watts Bar, Units 1 and 2 - Response to Question Regarding GDC-5 Guidance for Dual Unit Shutdown. |
09/18/2015 | HOLTEC | Holtec International - Request for Additional Documentation for Watts Bar Dry Storage Project. |
09/10/2015 | TVA | Watts Bar, Unit 2 - Decommissioning Funding Update. |
09/04/2015 | TVA | Watts Bar, Unit 2 - Response to Request for Additional Information Regarding Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2. |
09/03/2015 | NRC | Enclosure Watts Bar Mitigating Strategies Flood Hazard Information Letter Public Table |
09/03/2015 | NRC | Watts Bar Nuclear Plant, Units 1 and 2 - Interim Staff Response to Reevaluated Flood Hazards Submitted to Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation. |
09/01/2015 | NRC | Letter to Licensees Re: Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events. |
08/31/2015 | NRC | NUREG-0847, Supplement 28 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Docket Number 50-391 Tennessee Valley Authority. |
08/28/2015 | NRC | 2015/08/28 NRR E-mail Capture - WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NO. MF5273) |
08/27/2015 | TVA | Watts Bar Unit 2, Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request (TAC No. ME3091). |
08/26/2015 | TVA | Watts Bar, Unit 2 - Financial Protection Requirements and Indemnity Agreements, Insurance Status. |
08/26/2015 | TVA | Watts Bar Nuclear Plant Unit 2 - Responses to Requests for Additional Information - Developmental Revision I Technical Specification Section 3.8. |
08/20/2015 | TVA | Watts Bar, Unit 2 - Submittal of Electromagnetic Interference (EMI) Survey Results. |
08/17/2015 | NRC | 2015/08/17 NRR E-mail Capture - FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) |
08/13/2015 | TVA | Watts Bar Nuclear Plant, Unit 2 - Provides Revised FSAR Section 6.2.1 Containment Functional Design. |
08/12/2015 | TVA | Watts Bar, Unit 2 - Notification of Construction Substantially Complete and Request for Operating License. |
08/08/2015 | NRC | Watts Bar Nuclear Plant, Unit 2 - Relief from the Requirements of the ASME Code for the First 10-Year Interval of the Containment Inservice Inspection (TAC No. MF6154). |
08/06/2015 | NRC | RAI clarification call SG Weld RR MF6474 |
07/29/2015 | TVA | Watts Bar, Unit 2 - Pressurizer PORV Block Valves - Dynamic Testing Alternative. |
07/27/2015 | NRC | Watts Bar, Unit 2, Project, Operational Readiness Assessment Team Inspection Exit, Slide Presentation. |
07/27/2015 | TVA | Watts Bar Nuclear Plant (WBN) Unit 2 - Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 (TAC No. MD8314). |
07/24/2015 | TVA | Watts Bar Nuclear Plant Unit 2 - Diesel Generator Frequency - Response to NUREG 0847 Supplemental Safety Evaluation Report (SSER) 22, Open Item 32 - Correction. |
07/24/2015 | TVA | Watts Bar Nuclear Plant (WBN) Unit 2 - Reply To Notice Of Violation (EA-15-075). |
07/17/2015 | NRC | Press Release II-15-039: NRC Schedules Meeting to Discuss Readiness Inspection of Watts Bar Unit 2. |
07/15/2015 | TVA | Watts Bar, Unit 2 - Individual Plant Examination of External Events (IPEEE) Report, Revision 3. |
07/10/2015 | TVA | Watts Bar, Unit 2 - Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2. |
07/10/2015 | TVA | Watts Bar, Unit 2 - Distributed Control System (DCS) Data Storm Test Plan. |
07/09/2015 | TVA | Watts Bar Nuclear Plant, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Application to Add Technical Specifications to Support Dual Unit Operations (TAC No. MF6376). |
07/06/2015 | TVA | Watts Bar, Unit 2 - Submittal of Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of the Technical Requirements Manual & Technical Requirements Manual Bases. |
06/30/2015 | TVA | Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Ninth Progress Update on Improved Flood Mitigation System Project. |
06/29/2015 | TVA | Watts Bar, Unit 2 - Transmittal of Response to NRC Bulletin 2011-01, "Mitigating Strategies." |
06/25/2015 | TVA | Watts Bar, Unit 2 - Cyber Security Plan. |
06/24/2015 | TVA | Watts Bar, Unit 2 - Transmits Unit 1/Unit 2 As-Constructed Fire Protection Report (TAC No. ME3091). |
06/17/2015 | TVA | Watts Bar, Unit 2 - Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation |
06/16/2015 | NRC | Revision 1, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. |
06/15/2015 | TVA | Watts Bar Unit 2, Response to Request for Additional Information Regarding Use of an Alternative Edition and Addenda of ASME Section XI for the Containment Inservice Inspection Program (MF6154) |
06/12/2015 | NRC | Watts Bar, Units 1 and 2- Physical Security Plant, Training and Qualification Plan, Safeguards Contingency Plant and Indipendent Spent Fuel Storage Installation Security Program, Revisiopm 16 |
06/05/2015 | NRC | Declaration of Readiness for Watts Bar, Unit 2 Operational Readiness Assessment Team Inspection |
05/26/2015 | NRC | SRM-SECY-0068: Watts Bar Nuclear Plant, Unit 2 Review Status and Authority of the Director of the Office of Nuclear Reactor Regulation for Operating License Issuance. |
05/14/2015 | NRC | Final Request for Additional Information Regarding Containment ISI Request for Alternatives (MF6154) |
05/07/2015 | NRC | Watts Bar, Unit 2, Operational Readiness Assessment Team Inspection Prerequisites |
05/07/2015 | NRC | Draft Request for Additional Information Regarding CISI Request for Alternative WBN Unit 2 (TAC No. MF6154) |
05/07/2015 | NRC | SECY 15 0068: Watts Bar Nuclear Plant, Unit 2; Review Status and Authority of the Director of the Office of Nuclear Reactor Regulation for Operating License Issuance |
04/24/2015 | TVA | Two-Unit Offsite Dose Calculation Manual, Revision 0 |
04/23/2015 | NRC | Reactor Oversight Process Transition Plan for Watts Bar Nuclear Plant, Unit 2 |
04/10/2015 | TVA | Watts Bar Nuclear Plant Unit 2 - Severe Accident Management Alternatives for Reactor Coolant Pump Seals (TAC No. MD8203) |
04/07/2015 | TVA | Watts Bar Nuclear Plant, Unit 2 - Supplement Safety Evaluation Report - Open Item 33 - Completion of DCNs 53421 and 54636 |
04/03/2015 | TVA | Watts Bar Nuclear Plant Unit 2 - Supplemental Safety Evaluation Report Appendix HH - Open Item 1 - Power Assisted Cable Pulls |
04/01/2015 | TVA | Watts Bar, Unit 2 - Cyber Security Plan Implementation Milestones 1 through 7 Status and Proposed License Condition |
03/30/2015 | TVA | Watts Bar, Units 1 and 2 - Combined 10 CFR 50.46 - 30-day and annual report of changes and errors to the calculated peak cladding temperature (PCT) for the emergency cooling core system (ECCS) evaluation model |
03/30/2015 | TVA | Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Eighth Progress Update on Improved Flood Mitigation System Project |
03/27/2015 | NRC | Watts Bar Nuclear Plant, Units 1 and 2 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0950, MF1177, MF0951, and MF1178) |
03/25/2015 | TVA | Flood Hazard Reevaluation Report for Watts Bar, Response To NRC Request for Information per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
03/19/2015 | NRC | OEDO-15-00156 - Letter to J. Stetkar, ACRS from M. Satorius, EDO, re: Response to the Advisory Committee on Reactor Safeguards Letter dated February 12, 2015, on the Final Review of Watts Bar Nuclear Plant, Unit 2, Operating License Application |
03/17/2015 | TVA | Watts Bar Nuclear Plant, Unit 2 - Request for Alternate ASME Code Section XI for Containment lnservice Inspection Utilizing ASME Code Section XI, 2007-2008 |
03/12/2015 | TVA | Flood Hazard Reevaluation Report for Watts Bar Nuclear Plant, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of... |
03/12/2015 | TVA | Watts Bar, Units 1 & 2 - Compliance Letter & Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No EA-12-049... |
03/05/2015 | TVA | Watts Bar Nuclear Plant Unit 2, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 |
03/05/2015 | TVA | Watts Bar, Unit 2 - Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, "HFT - Charging and Letdown" |
02/26/2015 | NRC | Commission Memorandum And Order CLI-15-04 |
02/23/2015 | TVA | Watts Bar, Unit 2 - Final Safety Analysis Report, Amendment 113 |
02/13/2015 | TVA | Organization Topical Report, TVA-NPOD89-A |
02/12/2015 | NRC | Final ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application |
02/10/2015 | NRC | Draft Reactor Oversight Process Transition Plan for Watts Bar Unit 2 |
02/06/2015 | TVA | Watts Bar Nuclear Plant, Units 1 and 2, Submittal of 30-Day Report of Changes and Errors to the Calculated Peak Cladding Temperature. |
01/31/2015 | NRC | NUREG-0847 Supplement 27, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2" |
01/22/2015 | TVA | Watts Bar Nuclear Plant Unit 2 - Technical Specification Sections 3.0 and 3.10.1 |
01/09/2015 | TVA | Watts Bar, Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report (TAC ME3091) |
01/09/2015 | TVA | Request to Revise the Watts Bar Nuclear Plant Unit 2 Cyber Security Milestone Implementation Schedule and Implementation License Conditions |
|
2014 | |
12/30/2014 | TVA | Watts Bar Nuclear Plant Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident. |
12/19/2014 | TVA | Watts Bar, Units 1 & 2 - Closure of Open Item Discussed in Tennessee Valley Authority's Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) |
12/17/2014 | TVA | Watts Bar Nuclear Plant, Unit 2 - Response to Request for Additional Information Regarding NRC Review of Final Safety Analysis Report Amendment 112 for Chapter 6 |
12/17/2014 | NRC | Watts Bar Nuclear Plant, Units 1 and 2 - Response Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC No. MF5016) |
12/10/2014 | NRC | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force |
12/03/2014 | NRC | Watts Bar Nuclear Plant, Unit 2 - Report for the Audit Regarding Implementation of Licensing Preservation Program (TAC NO. ME2022). |
11/21/2014 | NRC | Response Requirements for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Integrated Assessments for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima |
11/21/2014 | TVA | Watts Bar, Units 1 & 2 - Two-Unit Offsite Dose Calculation Manual, Revision 0 |
11/17/2014 | TVA | Watts Bar, Units 1 and 2 - Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 15 |
11/12/2014 | NRC | E-mail Re. Watts Bar Nuclear Plant, Unit 2 - RAIs - Degraded Voltage Relay Issue |
10/31/2014 | TVA | Watts Bar, Unit 2 - Technical Specification 5.7.2.19, "Containment Leakage Rate Testing Program" |
10/31/2014 | NRC | Watts Bar Nuclear Plant, Unit 2 - Audit Plan For Review of Degraded Voltage Protection Scheme |
10/30/2014 | NRC | Commission Briefing on Watts Bar Unit 2 License Application |
10/30/2014 | TVA | Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
10/29/2014 | TVA | Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant (TAC Nos. MF0951 and MF1178) |
10/27/2014 | TVA | Watts Bar Nuclear Plant Unit 2 - Response To Questions Regarding The Unit 1/Unit 2 As-Constructed Fire Protection Report (TAC No. ME3091). |
10/22/2014 | TVA | Watts Bar, Unit 2, Eagle 21 Test Plan and Test Results |
10/21/2014 | NRC | Watts Bar Nuclear Plant, Unit 2, Review of Inservice Test Program and Preservice Test Program, and SE of Relief Requests IST-RR-1/2/3/4 for the First 10-Year Interval of the Inservice Testing Program (TAC MF4118) |
10/21/2014 | TVA | Watts Bar, Unit 2 - Response to Requests for Additional Information, Developmental Revision I Technical Specification (Section 3.3) and Technical Specification Bases (Limiting Condition for Operation B 3.0.6) |
09/30/2014 | TVA | Watts Bar Nuclear Plant Units 1 and 2 – Dual Unit Mitigation Strategy Tables |
09/30/2014 | TVA | Watts Bar, Unit 2 - Final Safety Analysis Report (FSAR) Section 2.4 - Hydrologic Engineering |
09/29/2014 | NRC | SECY 14 0102 Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 |
09/29/2014 | NRC | Draft RAIs Regarding the Review of Amendment 112 for Chapter 6 |
09/25/2014 | TVA | Watts Bar Nuclear Plant Unit 2 - Response to NRC Request for Additional Information Related to Technical Specification 3.7.1. |
09/18/2014 | NRC | Watts Bar Nuclear Plant, Unit 2, Closeout of Generic Letter, 2004 02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors." |
09/09/2014 | NRC | Memorandum and Order LBP 14 13 (Denying Motion to File New Contention and Terminating Proceeding) |
09/03/2014 | TVA | Response to NRC Requests Related to Granting an Operating License |
09/02/2014 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 Revision 12, and Status of Generic Communications for Unit 2 Revision 12 |
08/29/2014 | TVA | Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA NQA PLN89 A |
08/28/2014 | TVA | Third Six Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA 12 051) for Watts Bar Nuclear Plant |
08/28/2014 | TVA | Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) for Watts Bar Nuclear Plant. |
08/21/2014 | TVA | Response to Request for Additional Information Draft Two-Unit Offsite Dose Calculation Manual, Revision B |
08/19/2014 | NRC | 2014/08/19 NRR E-mail Capture - Watts Bar 2 - RAI - Developmental Tech Specs Rev I |
08/18/2014 | TVA | Watts Bar Nuclear Plant, Units 1 and 2 - Report for the Westinghouse Audit in Support of Reliable Spent Fuel Instrumentation Related to Order EA-12-051 (TAC MF0951 and MF1178). |
08/06/2014 | TVA | Watts Bar, Unit 2 - Response to Request for Additional Information Related to Relief Requests Associated with Unit 2 Inservice Testing and Preservice Test Programs (MF4118). |
08/05/2014 | TVA | Watts Bar Nuclear Plant, Units 1 & 2, Response to Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (Order No. EA-14-044) |
08/04/2014 | NRC | Watts Bar Nuclear Plant, Unit 2, Plan for Onsite Audit Regarding Tennessee Valley Authority Licensing Preservation Program. |
07/31/2014 | TVA | Watts Bar, Unit 2 - WBRD-50-391/86-60 - Final Report and Revised Completion Schedule |
07/23/2014 | TVA | Watts Bar, Unit 2, Demineralized Water System (System 059) Transition from ASME Section III to ASME Section XI. |
07/22/2014 | NRC | 2014/07/22 NRR E-mail Capture - Watts Bar 2 - RAI - Developmental Tech Specs Rev I |
07/15/2014 | NRC | 2014/07/15 NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I |
07/07/2014 | NRC | 2014/07/07 NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I - Steam Generators |
06/30/2014 | TVA | Watts Bar, Unit 2, Supplemental Safety Evaluation Report Appendix HH Open Item 132 Commitment Closure |
06/27/2014 | TVA | Browns Ferry, Units 1, 2 & 3; Sequoyah, Units 1 & 2 and Watts Bar, Units 1 & 2 - Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request |
06/27/2014 | TVA | Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project |
06/25/2014 | TVA | Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) |
06/25/2014 | TVA | Watts Bar Nuclear Plant (WBN) Unit 2 - Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334) |
06/24/2014 | TVA | 2014/06/24 NRR E-mail Capture - Request for Additional Information Regarding the Relief Request Related to the Watts Bar Unit 2 Inservice test program (TAC MF 4118) |
06/23/2014 | SACE | Curran Letter to Macfarlane Resubmitted re: Watts Bar Unit 2 Operating License Proceeding |
06/23/2014 | TVA | Watts Bar Nuclear Plant Unit 2 - Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report |
| | |
06/16/2014 | NRC | 2014/06/16 NRR E-mail Capture - Watts Bar, Unit 2 - RAIs for Radiological Emergency Plan (NP-REP, Rev. 103) |
06/16/2014 | TVA | Watts Bar Nuclear Plant, Unit 2 Submittal of Developmental Revision I of the Unit 2 Technical Specification (TS) and TS Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases |
06/13/2014 | TVA | Watts Bar, Units 1 & 2, Responses to Degraded Voltage Issue Requests for Additional Information |
06/12/2014 | TVA | Watts Bar, Unit 2, Response to NRC Bulletin 2012-01, "Design Vulnerability in Electrical Power System." |
06/10/2014 | TVA | Watts Bar, Unit 2 - Submittal of Pre-Operational Test Instruction |
05/22/2014 | TVA | Watts Bar, Unit 2, Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61 |
05/21/2014 | NRC | Watts Bar Nuclear Plant, Unit No. 2 - Request for the Use of Alternative Regarding ASME Boiler and Pressure Vessel Code, Code Case N-836, "Heat Exchange Tube Mechanical Plugging, Class 1 Section III, Division 1" (TAC No. MF3462) |
05/21/2014 | NRC | Watts Bar Nuclear Plant, Unit 1 - E-mail re. WBN 1 Hydrology LAR with UFSAR Changes (TAC MF9130) |
05/15/2014 | NRC | Watts Bar Nuclear Plant, Units 1 and 2 - Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0950, MF1177, MF0951, and MF1178) |
05/13/2014 | NRC | Watts Bar, Investigative Synopsis OI 2-2013-012 |
05/09/2014 | TVA | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights |
05/08/2014 | TVA | Watts Bar, Unit 2 - Inservice Test (IST) Program/Preservice Test (PST) Program |
04/25/2014 | TVA | Watts Bar Nuclear Plant, Units 1 and 2 - 10 CFR 50.46 - Annual Report for 2013 |
04/02/2014 | TVA | Watts Bar Nuclear Plant Unit 2- Submittal of Pre-operational Test Instruction |
03/31/2014 | TVA | Tennessee Valley Authority's Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re: Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
03/31/2014 | TVA | Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Fourth Progress Update on Improved Flood Mitigation System Project |
03/31/2014 | TVA | Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request |
03/26/2014 | NRC | Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 |
03/20/2014 | TVA | Watts Bar Nuclear Plant Unit 2 - Supplemental Safety Evaluation Report 23, Appendix HH, Open Item 67- Component Cooling System Thermal Barrier Booster Pumps Above Possible Maximum Flood Level |
03/11/2014 | TVA | Watts Bar Nuclear Plant Unit 2- Submittal of Pre-operational Test Instruction |
03/10/2014 | NRC | Watts Bar Nuclear Plant Unit 2 – Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to 10 CFR 50.54(hh)(2) |
03/06/2014 | NRC | Watts Bar Nuclear Plant, Units 1 and 2- Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (Mitigating Strategies) |
03/05/2014 | NRC | Watts Bar Nuclear Plant Unit 2 E-Mail regarding Appendix HH Open Item 61 Regarding PAD Code |
02/28/2014 | TVA | Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant |
02/20/2014 | TVA | Revision of Commitment- Safety Evaluation Input Regarding Quality Assurance Records- Corrective Action Program |
02/10/2014 | TVA | Watts Bar, Unit 2 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-836 |
02/03/2014 | TVA | Watts Bar Nuclear Plant Unit 2- Diesel Generator Frequency Response to NUREG 0847 Supplemental Safety Evaluation Report 22, Open Item 32 |
02/03/2014 | TVA | Response to Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electrical Power System" |
01/10/2014 | TVA | Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
01/09/2014 | NRC | Response to the Advisory Committee on Reactor Safeguards Letter, Dated Novemebr 26, 2013 on the Interim Review of Watts Bar Nuclear Plant Unit 2 Operating License Application |
|
2013 | |
12/20/2013 | NRC | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
12/17/2013 | TVA | Revision of Commitment for Inspection and Repair of Kapton Insulated Pigtails within Electrical Containment Penetrations |
12/12/2013 | TVA | Watts Bar Unit 2, Submittal of Developmental Revision H of the Technical Specification and Technical Specification Bases |
12/12/2013 | TVA | Updated Inservice Test (IST) Program (Unit 1) and IST/Preservice Test (PST) Program |
12/12/2013 | TVA | Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision |
11/22/2013 | TVA | Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
11/21/2013 | NRC | Letter and Order Granting Construction Permit Extension |
11/08/2013 | NRC | Construction Operational Preparedness Inspection Plan |
10/29/2013 | TVA | Change to Commitment Date re: Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051 |
10/24/2013 | NRC | Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation |
09/27/2013 | NRC | Environmental Assessment and Finding of No Significant Impact for Extension of Construction Permit |
09/26/2013 | TVA | Submittal of Revised Section 4.3.1, "Criticality" Developmental Revision G of the Unit 2 Technical Specification |
09/16/2013 | TVA | Response to Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
09/06/2013 | TVA | Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation |
09/05/2013 | TVA | Tennessee Valley Authority - Organization Topical Report, TVA-NPOD89-A |
08/28/2013 | TVA | First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) for Watts Bar Nuclear Plant |
08/28/2013 | NRC | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-04 |
08/28/2013 | TVA | First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
08/28/2013 | TVA | Emergency Core Cooling System Evaluation Model Changes |
08/21/2013 | TVA | Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report |
08/14/2013 | TVA | Final Safety Analysis Report (FSAR) Amendment 110 |
08/13/2013 | TVA | Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61 |
08/06/2013 | TBA | Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61 |
08/02/2013 | NRC | RAI Related Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
07/31/2013 | NRC | Supplemental Biological Assessment |
07/25/2013 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10, and Status of Generic Communications for Unit 2 - Revision 10 |
07/18/2013 | TVA | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report |
07/18/2013 | TVA | Reply to Notice of Violation (EA-13-019) 391/2013611-01, -02, and -03 Related to TVA's Commercial Grade Dedication Program |
07/17/2013 | NRC | Order Granting Motion to Withdraw Contention 7, in the Matter of Tennessee Valley Authority |
07/17/2013 | TVA | Essential Raw Cooling Water and Component Cooling System Transition from ASME Section III to ASME Section XI |
07/15/2013 | TVA | Updated Strategy for FLEX Equipment Storage |
07/15/2013 | SACE | Southern Alliance for Clean Energy's Unopposed Motion to Withdraw Contention 7 |
07/03/2013 | NRC | Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force |
06/30/2013 | NRC | NUREG-0847 Supp 26 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2" |
06/27/2013 | TVA | Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report |
06/13/2013 | TVA | Submittal of Three Revised Specifications from Developmental Revision G of Technical Specification |
06/06/2013 | TVA | Status Update of Completion Schedule for Phase 2 Staffing Assessment Regarding 60-Day Response to 3/12/12, Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54(f) Regarding Recommendations |
05/30/2013 | NRC | NUREG-0498 Supplement 2 Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2 |
05/06/2013 | TVA | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Second Interim Report |
05/02/2013 | TVA | Service Air System Transition from ASME Section III to ASME Section XI |
04/29/2013 | TVA | Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue-Interim Report |
04/25/2013 | TVA | 10 CFR 50.46 - 30-Day Report and Annnual Report for 2012 |
03/21/2013 | TVA | Response to Request for Additional Information Regarding Technical Specifications Changes - Instrumentation and Controls Branch |
03/18/2013 | TVA | Response to Request for Additional Information Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised |
03/18/2013 | TVA | Supplemental Condenser Cooling Water Thermal Mixing Report |
03/13/2013 | TVA | Transmittal of Revised Unit 1/Unit 2 As-Designed Fire Protection Report |
03/13/2013 | NRC | Request for Additional Information Regarding Technical Specifications Instrumentation and Controls Branch |
03/12/2013 | TVA | Transition From American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section III Division I to Section XI-Modification of Two Previous Statements |
02/28/2013 | TVA | Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
02/28/2013 | TVA | Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
02/14/2013 | TVA | Updated Response to NRC Bulletin 2011-01, "Mitigation Strategies" |
02/07/2013 | TVA | Fire Protection Program - Commitment to Provide Additional Information on Multiple Spurious Operation (MSO) Scenarios |
02/07/2013 | NRC | Audit of the Licensee's Management of Regulatory Commitments |
01/31/2013 | TVA | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Interim Report |
01/29/2013 | TVA | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding , Required Response 1, Integrated Assessment Approach. |
01/24/2013 | TVA | Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report Open Item 25 |
01/24/2013 | TVA | Supplemental Safety Evaluation Report Appendix HH Item 50, Anchor Bolt Documentation and Pull Tests - Revision |
01/24/2013 | TVA | Waste Confidence Rulemaking and Environmental Impact Statement |
01/17/2013 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9, and Status of Generic Communications for Unit 2 - Revision 9 |
|
2012 | |
12/10/2012 | TVA | Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80 |
12/05/2012 | TVA | Watts Bar Nuclear Plant, Unit 2, Request for Additional Information Regarding Supplemental Condenser Cooling Water Velocity |
11/29/2012 | NRC | Status Of 60-Day Response To Orders Modifying Licenses Regarding Recommendations 4.2, 5.1, And 7.1 Of The Near-Term Task Force Related To The Fukushima Dai-ichi Nuclear Power Plant Accident |
11/01/2012 | TVA | Supplemental Safety Evaluation Report Open Item 70 Regarding the Preservice Inspection Program Plan |
10/31/2012 | TVA | Draft Two-Unit Offsite Dose Calculation Manual |
10/29/2012 | TVA | Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
10/29/2012 | TVA | Initial Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Fuel Pool Instrumentation (Order Number EA-12-051) |
10/25/2012 | TVA | 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" |
10/23/2012 | NRC | Request to use ASME Code Cases N-520-4 and N-520-5 Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates. |
10/17/2012 | TVA | Severe Accident Management Alternative Review |
10/16/2012 | TVA | 10 CFR 50.46 Estimated Increase in Peak Clad Temperature Due to the Effect of Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown Not Being Considered - 30 Day Report. |
10/04/2012 | TVA | Revision of Commitment for Unit 2's Implementation of the Maintenance Rule |
10/04/2012 | TVA | NRC Bulletin No. 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant System (RCS)" - Clarification |
10/01/2012 | TVA | Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant Units 1 and 2 Final Environmental Statements |
09/06/2012 | TVA | Long-Term Stability Analysis Methodology |
08/30/2012 | TVA | Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80 |
08/27/2012 | TVA | Update to Technical Specification Table 3.3.3-1 and Technical Specification Bases 3.3.3 |
08/23/2012 | TVA | Final Safety Analysis Report, Amendment 109 |
08/23/2012 | TVA | Request for Renewal of Special Nuclear Material License No. SNM-2014 |
08/15/2012 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8, and Status of Generic Communications for Unit 2 - Revision 8 |
08/09/2012 | NRC | Order Holding Waste Confidence Contention in Abeyance |
08/07/2012 | NRC | Commission Memorandum and Order (CLI-12-16) to Suspend Final Licensing Decisions for Watts Bar Nuclear Plant, to Grant the Requests in Part and Deny the Requests in Part. |
07/31/2012 | TVA | Evaluation for Tube Vibration-Induced Fatigue |
07/30/2012 | TVA | NUREG-0847 Supplemental Safety Evaluation Report Related to the Operation of WBN Unit 2, Appendix HH Open Item 5 and 8 - Core Map |
07/26/2012 | NRC | Status of 90-Day Response to Request for Information Regarding Recommendation 9.3 of Near-Team Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident. |
07/24/2012 | NRC | SECY-12-0103 - Sixth Report on the Status of Reactivation of Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 |
06/27/2012 | TVA | Submittal of Non-Proprietary Information Related to Final Safety Analysis Report Chapter 15 Transient Analysis |
06/18/2012 | NRC | Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item |
06/14/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item No. 519 |
06/13/2012 | TVA | Response to Request for Additional Information Regarding Final Safety Analysis Report Amendment Related to Section 3.11 – Revised Response |
06/11/2012 | TVA | 90-Day Response to NRC Request of Information Pursuant to 10 CFR 50.54(f) Re: Seismic Aspects of Recommendations 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident |
06/11/2012 | TVA | Estimates of Entrainment of Fish Eggs and Larvae at Watts Bar Nuclear Plant at Tennessee River Mile 528 from March 2010 through March 2011 |
06/08/2012 | NRC | Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant. |
06/07/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 26 – Diesel Generator |
06/07/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 30 – Power System Degraded Voltage |
06/05/2012 | TVA | Submittal of Revised Section 4.3, “Fuel Storage,” Developmental Revision G of Technical Specification |
05/18/2012 | NRC | Response to Corrective Actions with Task Interface Agreement for Notice of Violation |
05/17/2012 | TVA | Request for Extension to Construction Permi. |
05/17/2012 | NRC | Task Interface Agreement on Notice of Violation |
05/17/2012 | TVA | Additional Information to Generic Letter 2004-02, “Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors” |
05/01/2012 | NRC | NRC Staff's May 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application |
04/23/2012 | TVA | Instrumentation and Controls Staff Information Requests |
03/30/2012 | TVA | 30-Day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident |
03/30/2012 | TVA | Answer to Order with Regard to Reliable Spent Fuel Pool Instrumentation |
03/30/2012 | TVA | Answer to Order with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
03/23/2012 | NRC | Review Schedule Delay Due to Anticipated License Amendment Request and Hydrology Issues |
03/13/2012 | TVA | Fire Protection Report Revision of Commitments |
03/13/2012 | NRC | Correction to Issuance of Orders and Request for Information Issued Pursuant to Title 10 of the Code of Federal Regulations Part 50.54(f) |
03/12/2012 | NRC | Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
03/12/2012 | NRC | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident |
03/12/2012 | NRC | Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. |
03/12/2012 | TVA | Submittal of Previously Docketed Environmental Reports |
03/09/2012 | TVA | Instrumentation and Controls Staff Information Requests |
03/06/2012 | NRC | NRC Staff's March 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application |
03/06/2012 | ALSB | Memorandum and Order Denying TVA’s Motion for Summary Disposition of SACE Contention 7 |
03/05/2012 | TVA | Final Safety Analysis Report, Amendment 108 |
03/02/2012 | TVA | Instrumentation and Controls Staff Information Requests |
02/28/2012 | TVA | Submittal of Developmental Revision G of the Technical Specification and Technical Specification Bases. |
02/01/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
02/01/2012 | FEMA | FEMA Watts Bar, Final Exercise Report, Exercise Date – October 19, 2011. |
01/27/2012 | TVA | Comment (5) of Brenda E. Brickhouse of Tennessee Valley Authority on the Draft Supplement 2 to Final Environmental Statement. |
01/24/2012 | SACE | Comment (4) of Diane Curran, on Behalf of Southern Alliance for Clean Energy, on Draft Final Environmental Statement. |
01/23/2012 | DOI | Comments and Recommendations on the Draft Supplemental Final Environmental Statement. |
01/19/2012 | CN | Letter from Chickasaw Nation on Draft Final Environmental Statement. |
01/19/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
01/19/2012 | NRC | Watts Bar Nuclear Plant, Unit 2 – Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 and N-802. |
01/18/2012 | NRC | Status of Operating License Application Review Regarding Fire Protection Program. |
01/12/2012 | TVA | Final Safety Analysis Report – Revision to Chapter 15.2.4 Inadvertent Boron Dilution. |
01/04/2012 | PUB | Comment (3) by Anonymous Individual Opposing Draft Supplement 2 to Final Environmental Statement. |
01/03/2012 | NRC | NRC Staff's January 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
|
2011 | |
12/28/2011 | PUB | Comment (1) of Donna Budnick on the Draft Supplement 2 to Final Environmental Statement. |
12/27/2011 | TVA | Notification of National Pollutant Discharge Elimination System Permit Modification. |
12/22/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
12/21/2011 | TDOT | Tennessee Department of Transportation Comment Letter. |
12/21/2011 | EPA | EPA’s Comments on the DFES. |
12/20/2011 | NRC | NRC Staff's Answer to TVA's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts. |
12/20/2011 | SACE | Certificate of Service of Copies of the Southern Alliance for Clean Energy's Opposition to TVA's Motion for Summary Disposition of Contention 7, Statement of Disputed Material Facts, and Declaration of Shawn Paul Young, Ph.D. |
12/20/2011 | SACE | Declaration of Shawn Paul Young, Ph.D. on Behalf of Southern Alliance for Clean Energy |
12/20/2011 | SACE | Southern Alliance for Clean Energy's Statement of Disputed Material Facts. |
12/20/2011 | SACE | Southern Alliance for Clean Energy's Opposition to Tennessee Valley Authority's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts of Watts Bar Unit 2. |
12/20/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7, and Status of Generic Communications for Unit 2 - Revision 7. |
12/20/2011 | FWS | Biological Assessment for Section 7 Consultation Related to the Operating License Application, Rhea County, Tennessee. |
12/19/2011 | DOI | Comment (2) of Joyce Stanley, on Behalf of the U.S. Department of the Interior, on Draft Supplemental Environmental Statement, NUREG-0498, Supplement 2. |
12/19/2011 | NRC | Extension of Comment Period on Draft Supplement to Final Environmental Statement for Operation. |
12/15/2011 | EPA | EPA's Comments on the "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2." Supplement, NUREG-0498, July 2011. |
12/08/2011 | NRC | Transcripts for 12/8/2011 Draft Final Environmental Statement Public Comment Meeting. |
11/30/2011 | NRC | NUREG-0847, Supp. 25, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2". |
11/30/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
11/21/2011 | CNO | Letter from Choctaw Nation of Oklahoma on Draft Final Environmental Statement. |
11/21/2011 | TVA | Tennessee Valley Authority's Motion for Summary Disposition of Contention 7. |
11/18/2011 | NRC | Request for Additional Information Regarding Supplemental Evaluation Report Open Item 26. |
11/18/2011 | NRC | Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Items 80, 81, 105, and 108. |
11/17/2011 | TVA | Final Safety Analysis Report, Amendment 107. |
11/15/2011 | NRC | 11/08/2011 Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project. |
11/14/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
11/07/2011 | TVA | Meteorology Data for Accident Dose Analysis. |
11/02/2011 | NRC | Notice of Availability of the Draft Supplement to Final Environmental Statement for Operation (TAC No. MD8203). |
11/01/2011 | NRC | NRC Staff's November 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
10/31/2011 | NRC | NUREG-0498 Supp 2, "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2". |
10/31/2011 | TVA | Results of the Hydrology Analysis Without Use of Sand Baskets. |
10/24/2011 | TVA | Safety Evaluation Report Supplement 23 - Response to NRC Required Action Item 71. |
10/17/2011 | TVA | Revision of Commitment for Unit 2's Implementation of the Maintenance Rule. |
10/17/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis. |
10/13/2011 | TVA | Instrumentation And Controls Staff Information Requests. |
09/30/2011 | NRC | NUREG-0847 Supp 24 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
09/30/2011 | TVA | Instrumentation & Controls Staff Information Requests. |
09/23/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis. |
09/21/2011 | NRC | Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Item 80. |
09/20/2011 | NRC | Review of Individual Plant Examination of External Events Design Report. |
09/16/2011 | TVA | Revised Severe Accident Accident Management Design Alternative Review (SAMDA) Response. |
09/15/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Design Basis Dose Analysis. |
09/15/2011 | TVA | Final Safety Analysis Report - Revised Enclosures 3 & 5 for TVA to NRC Letter Dated December 10, 2010. |
09/15/2011 | TVA | Final Safety Analysis Report, Amendment 106. |
09/14/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 7. |
09/09/2011 | NRC | Anticipated License Amendment Requests. |
09/07/2011 | NRC | Complete List of Comments, Suggestions, and Staff Responses Condensed From the October 6, 2009, Public Scoping Meeting. |
09/06/2011 | NRC | NRC Staff's September 6, 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
09/01/2011 | TVA | Relief Request to Use American Society of Mechanical Engineers (ASME) Code Cases N 801 and N 802. |
09/01/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item 11. |
09/01/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
09/01/2011 | TVA | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Transition - Revised Commitment. |
08/23/2011 | NRC | Closeout of Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Containment Spray System." |
08/22/2011 | TVA | Response to Request for Additional Information on the Determination of the 50 Mile Population Dose. |
08/15/2011 | TVA | Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report. |
08/12/2011 | NRC | Transition of Components to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI. |
08/12/2011 | NRC | Review of Individual Plant Examination Submittal - Internal Events and Internal Flood. |
08/12/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item. |
08/12/2011 | TVA | Final Safety Analysis Report, Amendment 105. |
08/10/2011 | TVA | Submittal of Complete Version of Developmental Revision of the Technical Specifications and Technical Specifications Bases. |
08/05/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Design Basis Accident Dose Analysis. |
08/04/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
08/03/2011 | TVA | Request for Additional Information Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised Response. |
07/29/2011 | TVA | Response to Request for Additional Information Regarding June 28, 2011 NRC Audit- Steam Line Break and other Miscellaneous RAIs. |
07/28/2011 | TVA | Notification of National Pollutant Discharge Elimination System Permit Renewal and Approval. |
07/28/2011 | TVA | Results from Cost-Benefit Analysis of Radwaste System Enhancements. |
07/27/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 6, and Status of Generic Communications for Unit 2 - Revision 6. |
07/27/2011 | TVA | Response to Chapter 12 Request for Additional Information. |
07/27/2011 | NRC | Request for Additional Information Regarding Incore Instrumentation System. |
07/21/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 6. |
07/20/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 15. |
07/20/2011 | NRC | Schedule of Licensing Activities. |
07/18/2011 | TVA | Response to Request for Additional Information Regarding June 28, 2011 NRC Audit. |
07/18/2011 | TVA | Response to NRC Bulletin 2011-01, "Mitigation Strategies". |
07/14/2011 | TVA | Response to Request for Additional Information Regarding Compliance with 10 CFR 50.68(b)(6). |
07/13/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-261-01, Rev. 0. |
07/07/2011 | NRC | Questions Raised to the NRC During the June 20 Public Meeting Regarding the Watts Bar Unit 2 Construction Project. |
07/05/2011 | NRC | NRC Staff's July 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
06/30/2011 | NRC | NUREG-0847 Supp 23 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
06/29/2011 | NRC | IR 05000391-11-604, on 04/03/2011 - 05/21/2011, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report. |
06/29/2011 | NRC | Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project. |
06/27/2011 | TVA | Response to Request for Additional Information Regarding April 27, 2011 NRC Audit. |
06/27/2011 | TVA | Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis. |
06/27/2011 | TVA | Response to Request for Additional Information on Severe Accident Management Design Alternatives. |
06/24/2011 | TVA | Response to Final Safety Analysis Report, and Final Supplemental Environmental Impact Statement. |
06/24/2011 | TVA | Final Safety Analysis Report - Response to Chapter 11 Request for Additional Information. |
06/23/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
06/21/2011 | TVA | Submittal of Pre-op Test Instruction. |
06/21/2011 | TVA | Response to NRC Staff Comments on Developmental Revisions of the Unit 2 Technical Specifications and Technical Specification Bases; Submittal of Developmental Revision F. |
06/17/2011 | TVA | Transmittal of Quality Assurance Assessment Report NGDC-WB-11-007, Licensing Basis Preservation. |
06/17/2011 | TVA | Response To Request For Additional Information Regarding Severe Accident Management Alternative Review. |
06/15/2011 | NRC | Press Release-11-107: NRC Issues License to TVA Authorizing Receipt of Fresh Nuclear Fuel for Watts Bar Nuclear Plant, Unit 2. |
06/15/2011 | NRC | Letter to A. Bhatnagar: Issuance of Special Nuclear Materials License No. SNM-2014 for Watts Bar Nuclear Plant, Unit 2 (TAC L32918). |
06/13/2011 | NRC | Request for Additional Information Regarding Severe Accident Mitigation Design Alternatives Review - June 2011. |
06/10/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
06/10/2011 | TVA | Response to NRC Bulletin 2011-01, "Mitigating Strategies". |
06/10/2011 | TVA | Cyber Security Implementation Schedule Including Systems Common to WBN, Unit 1. |
06/09/2011 | TVA | Reply to Notice of Violation 0500039/112010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response. |
06/09/2011 | TVA | Submittal of Pre-op Test Instruction. |
06/08/2011 | NRC | IR 05000390-11-403 & 05000391-11-403, on 05/27/11, Watts Bar Nuclear Plant. |
06/08/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 5. |
06/07/2011 | TVA | Safety Evaluation Report Supplement 22 (SSER 22) - Second Response to NRC Required Action Items. |
06/06/2011 | TVA | Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis. |
06/03/2011 | TVA | Final Safety Analysis Report (FSAR), Amendment 104. |
06/02/2011 | TVA | Completion of Temporary Instruction 184, "Availability and Readiness Inspection of Severe Accident Mitigation Guidelines" at Region II Facilities - Revision. |
06/01/2011 | TVA | Information Presented in the May 11-12, 2011 TVA/NRC Meeting Regarding Final Safety Analysis Report Section 2.4. |
05/26/2011 | TVA | Response to Request for Information from Public Meeting on May 11, 2011. |
05/25/2011 | TVA | Response to Request for Additional Information Item Numbers 2, 3, 5 and 15 Regarding Severe Accident Management Design Alterative Review. |
05/24/2011 | TVA | Responses to Request for Additional Information Regarding (1) Bottom Mounted Instrument Tube Failure and (2) Mass Addition Events. |
05/24/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, "Emergency Gas Treatment System Pressure Test." |
05/23/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 4. |
05/20/2011 | TVA | Response to Final Safety Analysis Report, Chapter 11 and Final Supplemental Environmental Impact Statement Request for Additional Information. |
05/20/2011 | TVA | Revised Response to Request for Additional Information Question 3 Regarding Final Safety Analysis Report Section 2.4. |
05/20/2011 | TVA | Instrumentation and Controls Staff Information Requests - Presentation Package for Public Meeting Held on May 12, 2011. |
05/20/2011 | TVA | Cyber-Security Program Implementation Schedule. |
05/19/2011 | TVA | Response to Request for Additional Information on Intake Pumping Station Water Velocity. |
05/13/2011 | TVA | Response To Request For Additional Information Regarding Severe Accident Management Design Alternative Review. |
05/13/2011 | TVA | Additional Responses to Request for Additional Information Regarding (1) Large Break Loss of Coolant Accident, (2) Steam Line Break, and (3) Miscellaneous Analysis. |
05/10/2011 | NRC | End of Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2011601). |
05/09/2011 | TVA | Response to Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3 - Revised Response for RAI 2. |
05/09/2011 | NRC | Multi-Unit Operator Training and Certification Program, Revision 1, Errata. |
05/06/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
04/29/2011 | TVA | Response to Requests for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
04/29/2011 | TVA | Response to Requests for Additional Information Regarding Inadvertent ECCS Actuation Analysis, and Chemical & Volume Control System Malfunction Analysis. |
04/29/2011 | TVA | Response to Request for Additional Information on New Fuel Receipt and Storage. |
04/29/2011 | TVA | Intake Pumping Station Water Velocity - Response to Request for Additional Information. |
04/27/2011 | NRC | Accident Analyses Audit Report Westinghouse Documents Relating to Final Safety Analysis Report Accident Analyses. |
04/27/2011 | NRC | Audit Report of the Common Q Post Accident Monitoring System. |
04/25/2011 | NRC | Request for Additional Information Regarding Generic Letter 2004-02 Round 2. |
04/25/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 3. |
04/21/2011 | TVA | Withdrawal of A Previous Comment. |
04/20/2011 | TVA | Response to Request for Additional Information Regarding Final Safety Analysis Report Section 2.4. |
04/19/2011 | TVA | Submittal of Pre-Op Test Instruction, 2-PTI-030H-01, Rev. 0, "Lower Compartment Coolers." |
04/19/2011 | NRC | Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water. |
04/13/2011 | TVA | Response to Request For Additional Information (RAIs) Related to FSAR Sections 9.2.1 and 9.2.2. |
04/13/2011 | NRC | Status of Operating License Application Review and Project Schedule Implications. |
04/11/2011 | NRC | Multi-Unit Operator Training and Certification Program, Revision 1. |
04/06/2011 | TVA | List of Design Differences, Revision 1. |
04/06/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Items. |
04/01/2011 | TVA | Response to Request for Additional Information on Final Safety Analysis Report Section 9.3.2.6 for the Post Accident Sampling System. |
04/01/2011 | TVA | Revised Response to Requests for Additional Information on Individual Plant Examination of External Events Design Report. |
04/01/2011 | TVA | Response to Large Break Loss of Coolant Accident and Over-Pressurization Request for Additional Information. |
04/01/2011 | NRC | Status of Operating License Application Review Regarding Radioactive Waste Management and Environmental Impacts. |
03/31/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
03/28/2011 | TVA | Additional Information Related to NRC Environmental Review. |
03/25/2011 | TVA | Final Safety Analysis Report - Response to Requests for Additional Information Concerning the Nuclear Steam Supply System. |
03/25/2011 | TVA | Submittal of Pre-Op Test Instruction. |
03/24/2011 | TVA | Final Safety Analysis Report - Response to Chapter 10 Request for Additional Information. |
03/24/2011 | TVA | Additional Information Related to NRC Regarding Environmental Review. |
03/22/2011 | NRC | Notice of No Significant Antitrust Changes and Time for Filing Requests for Reevaluation. |
03/21/2011 | TVA | Re-submittal of Attachments for Responses to Hydrology Action Items. |
03/21/2011 | TVA | Submittal of Preservice Test Program Plan, Revision 1. |
03/16/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
03/15/2011 | TVA | Final Safety Analysis Report (FSAR), Amendment 103. |
03/11/2011 | TVA | Response After Completion of Engineering for the ECCS, RHR, and CSS Systems to NRC Generic Letter 2008-01: "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems". |
03/07/2011 | TVA | Submittal of Pre-op Test Instructions. |
03/04/2011 | TVA | Response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
03/02/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
02/25/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Chapters 11 and 12 Request for Additional Information. |
02/25/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
02/25/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
02/22/2011 | TVA | Response to Antitrust Clarification Questions. |
02/22/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-065-01, Revision 0. |
02/17/2011 | TVA | Relief Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities. |
02/16/2011 | TVA | Supplemental Information For Review of Developmental Revision A of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases). |
02/16/2011 | TVA | Submittal of Pre-op Test Instructions. |
02/11/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
02/10/2011 | TVA | Submittal of Pre-op Test Instructions. |
02/10/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
02/08/2011 | TVA | Response to Request for Additional Information Concerning Application for New License, Control No. 573898. |
02/07/2011 | TVA | Submittal of "Hydrothermal Effects on Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauge Reservoir," Report. |
01/31/2011 | NRC | NUREG-0847, Suppl. 22, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
01/31/2011 | TVA | Request For Additional Information (RAI) Regarding Individual Plant Examination. |
01/27/2011 | TVA | Change to Developmental Technical Specification (TS) Section 3.1.8, "Rod Position Indication." |
01/27/2011 | NRC | Status of Operating License Application Review. |
01/25/2011 | TVA | Submittal Concerning Procedures for Unit 2 Special Nuclear Material. |
01/25/2011 | TVA | Status of Unresolved Safety Issues. |
01/24/2011 | TVA | Final Safety Analysis Report (FSAR), Section 2.4, "Hydrologic Engineering". |
01/21/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5. |
01/20/2011 | NRC | Commercial Grade Dedication of Hardware and Software Used in the Post Accident Monitoring System Audit Report. |
01/18/2011 | TVA | Submittal of Pre-op Test Instruction. |
01/13/2011 | TVA | American Society of Mechanical Engineers Section XI, Preservice Inspection Program - Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities. |
01/12/2011 | TVA | Submittal of Pre-Op Test Instructions. |
01/04/2011 | TVA | Response to Request for Additional Information Regarding Environmental Review. |
01/03/2011 | NRC | Notification of the Delays in Completing the Operating License Application Review Due to Processing the Associated Environmental Review. |
|
2010 | |
12/21/2010 | TVA | Submittal of Pre-op Test Instruction |
12/17/2010 | TVA | Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information |
12/14/2010 | TVA | Refurbishment Program and Licensing Basis Preservation Self Assessments |
12/10/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
12/06/2010 | TVA | Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information |
11/18/2010 | TVA | Response to Request for Additional Information Regarding Target Set Development |
11/09/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
10/29/2010 | TVA | Final Safety Analysis Report (FSAR), Amendment 101 |
10/13/2010 | TVA | Response to Request for Additional Information Regarding the Preservice Inspection Program Plan |
09/29/2010 | TVA | Response to Request for Additional Information (RAI) Regarding the Preservice Inspection Program Plan |
09/17/2010 | TVA | Response to NRC Question Regarding WBN Unit 2 Emergency Plan |
09/17/2010 | TVA | Response to NRC Request For Additional Information Regarding Severe Accident Management Alternatives SECPOP2000 Errors |
09/10/2010 | TVA | Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
09/02/2010 | TVA | Instrumentation and Controls Staff Information Requests |
09/01/2010 | TVA | Request for Additional Information (RAI) Regarding Final Safety Analysis Report Amendment Related Section 3.11 |
09/01/2010 | TVA | Final Safety Analysis Report (FSAR), Amendment 100 |
08/30/2010 | TVA | Submittal of Pre-op Test Instruction |
08/30/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
08/16/2010 | TVA | Change to Developmental TS Section 4.2.2, “Control Rod Assemblies.” |
08/12/2010 | TVA | Request for Additional Information (RAI) Regarding Individual Plant Examination |
08/11/2010 | TVA | NRC August 3-4, 2010, Instrumentation and Controls Meeting - Request for Additional Information |
08/06/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
08/05/2010 | TVA | Response to NRC Regulatory Issue Summary 2010-08,Preparation and Scheduling of Operator Licensing Examinations |
08/05/2010 | TVA | Response to Request For Additional Information (RAI) Regarding Licensee's Final Safety Analysis Report Amendment Related To Chapter 8, "Electric Power" |
07/30/2010 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 |
07/30/2010 | TVA | Response to Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves |
07/29/2010 | TVA | Response to Request for Additional Information Regarding Antitrust Review |
07/23/2010 | TVA | Request for Additional Information Regarding Severe Accident Management Alternatives |
07/16/2010 | TVA | Request for Additional Information Regarding Fire Protection Program |
07/14/2010 | TVA | Additional Information Regarding Final Safety Analysis Report (FSAR), Chapter 7, "Instrumentation And Controls" Review - Requested Common Q Proprietary Documents |
07/13/2010 | NRC | Request for Additional Information Regarding Antitrust Review |
07/12/2010 | TVA | Submittal of Preoperational Test Instructions |
07/12/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Electrical Engineering Systems |
07/12/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Accident Dose |
07/08/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Quality And Vendor Branch Review |
07/07/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Spent Fuel Storage And Handling Review |
07/02/2010 | TVA | Submittal of Additional Information Requested During May 12, 2010, Request for Additional Information (RAI) Clarification Teleconference Regarding Environmental Review |
07/02/2010 | NRC | Program for Construction Refurbishment |
07/02/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Mechanical And Civil Engineering Systems |
07/01/2010 | NRC | Revised Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment |
06/30/2010 | TVA | Safety evaluation regarding generic letter and bulletins related to reactor pressure vessel head inspections |
05/27/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 99 |
05/07/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 98 |
01/15/2010 | TVA | TVA’s Nuclear Quality Assurance Program, TVA-NQA-PLN89-A, Revision 22), with no reduction in commitment |
01/11/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 97 |
|
2009 | |
12/14/2009 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 96 |
11/24/2009 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 95 |
10/21/2009 | NRC | Audit of TVA’s Management of Regulatory Commitments Program |
09/22/2009 | TVA | TVA Responses to Public Comments and Questions Regarding the Refurbishment Program |
09/09/2009 | NRC | Safety Evaluation for the Replacement Items Corrective Action Program Plans |
09/08/2009 | TVA | Additional information regarding licensing basis preservation and construction refurbishment program |
09/08/2009 | NRC | Safety Evaluation for the Quality Assurance Records Corrective Action Program Plans |
09/04/2009 | NRC | Notice of Intent to Prepare a Supplement to the Final Environmental Statement and Conduct the Scoping Process |
08/31/2009 | NRC | Safety Evaluation for the Cable and Electrical Corrective Action Program Plans |
08/27/2009 | TVA | Transmittal of Final Safety Analysis Report, Amendment 94 |
07/28/2009 | NRC | Establishment of Atomic Safety Licensing Board |
07/10/2009 | TVA | Additional Information Regarding Corrective Action Programs |
07/08/2009 | TVA | TVA Response to Request for Additional Information on Refurbishment Plan |
05/18/2009 | TVA | Additional Information Regarding Corrective Action Programs |
05/08/2009 | NRC | Public Notice of Receipt of Updated Appl. for Facility Operating License |
04/30/2009 | TVA | Submittal of Final Safety Analysis Report (FSAR), Amendment 93 |
04/28/2009 | NRC | Request for Additional Information on Programs for Licensing Basis Preservation and Construction Refurbishment |
04/27/2009 | NRC | Fed Notice- Receipt of Update to Application for Facility Operating license and notice of Additional Opportunity for Hearing |
04/22/2009 | NRC | Watts Bar, Unit 2, Notice of Receipt of Update to Application For Facility Operating License and Notice of Additional Opportunity for Hearing and Order |
04/22/2009 | NRC | Watts Bar Nuclear Plant, Unit 2 - Termination of Review of Watts Bar 2 Preservice Inspection Plan |
04/09/2009 | NRC | Information Letter to Governor Phil Bredesen Regarding an Updated Application Received for a Facility Operating License from TVA |
04/06/2009 | TVA | Additional Information Regarding WBN Unit 2 Corrective Action Programs |
03/11/2009 | NRC | Annual Assessment Letter |
03/04/2009 | TVA | Update to the OL application |
02/28/2009 | NRC | NUREG-0847, Supp. 21, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2" |
02/23/2009 | NRC | Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities |
02/11/2009 | NRC | Status of Regulatory Framework for the Completion of Corrective Action and Special Programs and Unresolved Safety Issues (TAC MD9424) |
01/29/2009 | NRC | Integrated Inspection Report, IR 05000391-08-001, on 10/01/2008 - 12/31/2008 |
01/27/2009 | TVA | Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives |
01/15/2009 | NRC | SECY-09-0012 - Status of Reactivation of Construction and Licensing Activities |
01/14/2009 | TVA | Response to Request for Additional Information Regarding Cable Issue Corrective Action Program |
|
2008 | |
12/09/2008 | TVA | Licensing Basis Preservation and Construction Refurbishment Program |
10/30/2008 | TVA | Submitting preservice inspection program plan |
10/10/2008 | NRC | Status of Regulatory Framework for the Completion of Operating License Review (TAC MD9424) |
10/02/2008 | NRC | Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314) |
09/26/2008 | TVA | Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues |
08/25/2008 | NRC | Status of Generic Communications for Review |
08/25/2008 | TVA | Westinghouse Eagle-21 Process Protection System |
07/29/2008 | NRC | IR 05000391-08-007, on 04/01/2008 - 06/30/2008, Watts Bar, Unit 2 |
07/29/2008 | TVA | Generic Communications Status, Revision 1 |
07/07/2008 | NRC | Order Extending Construction Permit to March 31, 2013 |
07/07/2008 | NRC | Order for Extension of Construction Permit ( Tac No. MD8389) |
07/02/2008 | TVA | Response to Request for Additional Information |
07/02/2008 | TVA | Final Supplemental Environmental Impact Statement - Request for Additional Information |
06/20/2008 | NRC | Environmental Assessment and Findings of No Significant Impact For Extension of Construction Permit (Tac No. MD8389) |
06/16/2008 | TVA | Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 |
06/03/2008 | NRC | Request For Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement |
05/29/2008 | TVA | Cable Issues Corrective Action Program for the Completion of WBN Unit 2 |
05/28/2008 | NRC | Status of Generic Communications for Review (Tac No. MD8314) (See Attachment Below) |
05/28/2008 | NRC | NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 (ATTACHMENT ONLY) |
05/22/2008 | NRC | Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants (TAC No. MD8314) |
05/08/2008 | TVA | Request for Extension of Construction Permit CPPR-92 |
05/08/2008 | NRC | Assessment of Generic Communications Status |
05/08/2008 | NRC | Assessment of remaining licensing review scope |
05/07/2008 | NRC | Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) |
03/20/2008 | TVA | Letter addressing Watts Bar Unit 2 Generic Communication status |
03/13/2008 | TVA | Supplementing the January 29, 2008, letter on the regulatory framework tables for the SER and its supplements to allow ease of review and provide additional definitions for section status |
03/06/2008 | TVA | Request extension of the construction permit to March 31, 2013 |
02/15/2008 | NRC | Instruction Manual Chapter 2517-WBN Unit 2 Construction Inspection Program |
02/15/2008 | TVA | Submittal of Final Supplemental Environmental Impact Statement |
02/01/2008 | TVA | Request to use ASME Code Case N 520 2 for expired N-type Certificates |
01/29/2008 | TVA | Submittal of regulatory framework letter for completion of unit 2 |
|
2007 | |
12/05/2007 | TVA | Notifying NRC that TVA will use the Westinghouse Eagle 21 process protection system on WBN Unit 2 |
10/23/2007 | NRC | Request for Additional Information, NRC staff will need for its own assessment of the status of the licensing review |
10/22/2007 | NRC | Acceptance of TVA 120 day notice of reactivation letter |
10/11/2007 | TVA | Informing the NRC that TVA does not see the need for additional exemptions or relief, other than those discussed in the attachment to this letter and those associated with preservice and inservice inspection programs |
09/07/2007 | TVA | Summary of Generic Communications with supplemental information on references to closure documentation where applicable |
09/07/2007 | TVA | Response to certain NRC Bulletins and Generic Letters for Watts Bar Unit 2 |
08/03/2007 | TVA | 120 day letter informing NRC reactivation of Unit 2 |
07/25/2007 | NRC | Commission Staff Requirements Memorandum on SECY-07-0096 |
06/07/2007 | NRC | Commission paper SECY-07-0096 describing policy issues |
04/03/2007 | TVA | Key Assumptions for the Possible Completion of Construction Activities |
|
2006 | |
11/14/2006 | TVA | Feasibility Study for the Completion of Construction Activities |
09/27/1976 | TVA | Supplement Cover letter |
06/30/1976 | TVA | Operating License Application Cover letter for the facility operating license |