As a general policy, SECY Papers will be released to the public unless they contain specific limited types of information which warrant protection. Missing numbers in the listing indicate that these papers involve matters which the Commission has specifically agreed should be withheld: Classified, Safeguards, Allegation, Investigation, Security-Related, Proprietary, Privacy Act Information, Federal/State/Foreign Government and International Agency-Controlled Information, Adjudicatory, Enforcement, Lawyer-Client or Legal Work Product, and limited sensitive matters which contain a specific withhold recommendation and supporting justification. (Reference Internal Commission Procedures, Chapter II.)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Description Date
SECY-98-303 Interim Enforcement Policy Regarding Proposed New Requirements for the Possession of Industrial Devices Containing Byproduct Material (10 CFR 31.5) 12/29/1998
SECY-98-302 Annual Status Report on Licensing Actions, Fiscal Year 1998 12/29/1998
SECY-98-301 Litigation Report - 1998 - 6 12/29/1998
SECY-98-300 Options for Risk-Informed Revisions to 10 CFR Part 50 - "Domestic Licensing of Production and Utilization Facilities" 12/23/1998
SECY-98-299 Weekly Information Report - Week Ending December 18, 1998 12/23/1998
SECY-98-298 Status Report on Accident Sequence Precursor Program and Related Initiatives 12/22/1998
SECY-98-296 Agency Policy Regarding Licensee Recapture of Low-Power Testing or Shutdown Time for Nuclear Power Plants 12/21/1998
SECY-98-295 Effectiveness of Criteria for Funding Agreement State Training 12/18/1998
SECY-98-294 Changes to Paragraph (h) of 10 CFR Part 50.55a, "Codes and Standards" 12/18/1998
SECY-98-293 Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 6) 12/18/1998
SECY-98-291 Plan for Improving the Effectiveness of NRC's Training Programs 12/18/1998
SECY-98-290 Litigation Report - 1998 - 5 12/16/1998
SECY-98-289 Proposed Amendments to 10 CFR Parts 21, 50, and 54 Regarding Use of Alternative Source Terms at Operating Reactors 12/15/1998
SECY-98-288 Weekly Information Report - Week Ending December 11, 1998 12/15/1998
SECY-98-286 Status Report on the Continuing Recovery of Millstone Nuclear Power Station 12/11/1998
SECY 98-285 Weekly Information Report - Week Ending December 4, 1998 12/10/1998
SECY-98-284 Transfers of Material Containing less than 0.05 Percent by Weight Source Material under 10 CFR 40.51(b)(3) and (B)(4), and 40.13(a) 12/08/1998
SECY-98-282 Part 52 Rulemaking Plan 12/04/1998
SECY-98-281 Resident Inspector Compensation Policy 12/02/1998
SECY-98-280 Weekly Information Report - Week Ending November 27, 1998 12/03/1998
SECY-98-279 Partial Granting of Petition for Rulemaking Submitted by the Nuclear Energy Institute (PRM-50-62) 11/30/1998
SECY-98-278 Proposed Rule — "Changes to Requirements for Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51)" 12/01/1998
SECY-98-277 The Commissioner's Assistant Candidate Pool 11/25/1998
SECY-98-276 Weekly Information Report - Week Ending November 20, 1998 11/25/1998
SECY-98-275 Report to Congress on the Gaseous Diffusion Plants Located near Paducah, Kentucky, and Portsmouth, Ohio 11/24/1998
SECY-98-274 Commonwealth Edison Company's Proposal to Centralize its Emergency Operations Facilities at its Corporate Offices 11/23/1998
SECY-98-273 Potential Funding Assistance for Agreement States for Closure of Formerly Terminated NRC Licenses 11/20/1998
SECY-98-272 Proposed Arrangement for Technical Information Exchange and Cooperation Between the U.S. NRC and Romanian National Commission for Nuclear Activities Control 11/23/1998
SECY-98-271 Equal Employment Opportunity (EEO) Briefing 11/18/1998
SECY-98-270 Results of the Staff's Evaluation of Ongoing Feedback from Licensees Regarding the Impact of NRC's Activities on Licensees' Operations 11/18/1998
SECY-98-269 Weekly Information Report - Week Ending November 13, 1998 11/18/1998
SECY-98-267 Rulemaking Plan for the AP600 11/16/1998
SECY-98-266 Final Rule -- Requirements for Initial Operator Licensing Examinations 11/13/1998
SECY 98-265 Weekly Information Report - Week Ending November 6, 1998 11/12/1998
SECY-98-264 Proposed Amendments to 10 CFR 50.47; Granting of Petitions for Rulemaking (PRM 50-63 and 50-63a) Relating to a Reevaluation of Policy on the Use of Potassium Iodide (KI) after a Severe Accident at a Nuclear Power Plant 11/10/1998
SECY-98-263 Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct Material 11/09/1998
SECY-98-261 Policy Concerning Bundling of Exempt Quantities 11/05/1998
SECY-98-259 Weekly Information Report - Week Ending October 30, 1998 11/05/1998
SECY-98-258 DSI-24 Implementation: Decommissioning Licensing Actions and Priorities and Milestones for Addressing Rulemaking and Guidance Development 11/04/1998
Commissioner McGaffigan's Comments 12/08/1998
SECY-98-257 Final Rule, Part 2, Subpart M - "Public Notification, Availability of Documents and Records, Hearing Requests and Procedures for Hearings on License Transfer Applications" 11/03/1998
SECY-98-256 Proposed Revision to the Enforcement Policy to Address Severity Level IV Violations at Power Reactors 11/03/1998
SECY-98-255 Early Public Input on Comprehensive Rule on Generally Licensed Devices 11/02/1998
Commissioner McGaffigan's Comments  
SECY-98-253 Applicability of Plant-Specific Backfit Requirements to Plants Undergoing Decommissioning 11/04/1998
SECY-98-252 Preliminary Staff Views Concerning its Review of the Foreign Ownership Aspects of Amergen, Inc.'s Proposed Purchase of Three Mile Island, Unit 1 10/30/1998
SECY-98-251 Decommissioning Criteria for West Valley 10/30/1998
SECY-98-249 Weekly Information Report - Week Ending October 23, 1998 10/29/1998
SECY-98-248 Proposed Generic Letter 98-xx "Steam Generator Tube Integrity" 10/28/1998
SECY-98-247 Risk-Informed, Performance-Based Fire Protection at Nuclear Power Plants 10/27/1998
SECY-98-246 Standard Review Plan Regarding Foreign Ownership, Control, or Domination of Applicants for Reactor Licenses 10/23/1998
SECY-98-245 Rulemaking Plan - Protection Against Discrete Radioactive Particle (DRP) Exposures (10 CFR Part 20) 10/23/1998
SECY-98-244 NRC Human Performance Plan 10/22/1998
SECY-98-242 Screening Table for Building-Surface Contamination, as Guidance in Support of the Final Rule on Radiological Criteria for License Termination 10/21/1998
SECY-98-241 Weekly Information Report - Week Ending October 16, 1998 10/21/1998
SECY-98-239 Post-Disposal Criticality Research 10/19/1998
SECY-98-237 Final Rule, Part 2, Subpart J, "Procedures Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository" 10/19/1998
SECY-98-236 Weekly Information Report - Week Ending October 9, 1998 10/15/1998
SECY-98-235 Proposed Revision of Appendix K to Title 10 Part 50 of the Code of Federal Regulations (10 CFR Part 50) 10/09/1998
SECY-98-234 Weekly Information Report - Week Ending October 2, 1998 10/08/1998
SECY-98-232 Seaman Nuclear's Application for a License to Distribute Portable Moisture Density Gauges to General Licensees 10/05/1998
SECY-98-231 Authorization of the Trojan Reactor Vessel Package for One-Time Shipment for Disposal 10/02/1998

Commissioner McGaffigan's Comments

10/07/1998
SECY-98-230 Insights from NRC Research on Fire Protection and Related Issues 10/02/1998
SECY 98-229 Weekly Information Report - Week Ending September 25, 1998 10/02/1998
SECY-98-228 Proposed Streamlining and Consolidation of AEOD Functions and Responsibilities 10/01/1998
SECY-98-226 Issuance of a Section 274f, Atomic Energy Act Order to Exempt Envirocare of Utah, Inc. from the Licensing Requirements for Special Nuclear Material in Diffuse Waste That Will Be Regulated by the State of Utah 09/29/1998
Chairman Jackson's Comments 10/20/1998
Commission McGaffigan's Comments 10/05/1998
SECY-98-225 Proposed Rule: 10 CFR Part 63 — "Disposal of High-Level Radioactive Wastes in a Proposed Geologic Repository at Yucca Mountain, Nevada" 09/28/1998
SECY-98-224 Staff and Industry Activities Pertaining to the Management of Commitments Made by Power Reactor Licensees to the NRC 09/28/1998
SECY-98-223 Litigation Report - 1998 - 4 09/25/1998
SECY-98-222 Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 5) 09/24/1998
SECY 98-220 Weekly Information Report - Week Ending September 18, 1998 09/24/1998
SECY-98-219 Completion of Staff's Review and Issuance of the Final Safety Evaluation Report on Reduction in Augmented Examination Requirements for Boiling Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55a(g)(6)(ii)(A) 09/21/1998
SECY-98-218 Suspension of the Systematic Assessment of Licensee Performance Program 09/21/1998
SECY-98-217 Weekly Information Report - Week Ending September 11, 1998 09/18/1998
SECY-98-215 Request by Arkansas to Relinquish Authority for Sealed Source and Device Evaluation and Approval 09/15/1998
SECY-98-211 Weekly Information Report - Week Ending September 4, 1998 09/11/1998
SECY-98-209 Proposed Agreement with the State of Ohio and Compatibility Requirements of 10 CFR Part 20, Subpart E 09/08/1998
SECY-98-208 Weekly Information Report - Week Ending August 28, 1998 09/03/1998
SECY-98-206 National Academy of Sciences/National Research Council Grant to Fund the Biological Effects of Ionization Radiation Study Number VII (BEIR VII) 09/01/1998
SECY-98-204 Weekly Information Report - Week Ending August 21, 1998 08/28/1998
SECY-98-205 Funding for Nuclear Regulatory Commission Material Protection, Control, and Accounting Assistance to the Republics of the Former Soviet Union 08/28/1998
SECY-98-202 Implementation of the Convention on Nuclear Safety 08/25/1998
SECY-98-201 Deferral of Regulatory Oversight of Certain Portions of the Lake City Army Ammunition Plant to the U.S. Environmental Protection Agency 08/21/1998
SECY-98-200 Weekly Information Report - Week Ending August 14, 1998 08/20/1998
SECY-98-199 Proposed Rule: 10 CFR Part 31 - "Requirement for Those Who Possess Certain Industrial Devices Containing Byproduct Material to Provide Requested Information" 08/19/1998
SECY-98-198 Status of the Issue Resolution Process in the High-Level Radioactive Waste Program at Yucca Mountain, Nevada 08/19/1998
SECY-98-197 Proposed Rule - Revision to Part 2 Establishing Subpart M to Govern Requests for License Transfer Approval and Associated Requests for Hearings 08/14/1998
SECY-98-196 Removal of Clevite Corporation Site from the Site Decommissioning Management Plan 08/13/1998
SECY-98-195 Removal of the Cabot Boyertown Site from the Site Decommissioning Management Plan 08/13/1998
SECY-98-194 Upgrading the NRC Operations Center Emergency Telecommunications System 08/13/1998
SECY 98-193 Weekly Information Report - Week Ending August 7, 1998 08/13/1998
SECY-98-192 Resolution of Allegations Concerning the Performance of Agreement State Programs 08/11/1998
SECY 98-191 Weekly Information Report - Week Ending July 31, 1998 08/07/1998
SECY-98-190 Proposed License to Export a 10 Megawatt TRIGA Research Reactor to Thailand (XR166) 08/05/1998
SECY-98-188 A Proposed Simplification of the Rulemaking Process for Certificate of Compliance Rulemakings 08/03/1998
SECY-98-187 Interim Status Report -- Fire Protection Functional Inspection Program 08/03/1998
SECY-98-186 Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan 07/31/1998
SECY-98-185 Proposed Rulemaking - Revised Requirements for the Domestic Licensing of Special Nuclear Material 07/30/1998
SECY 98-184 Weekly Information Report - Week Ending July 24, 1998 07/30/1998
SECY-98-183 Submittal and Analysis of Revised Resident Inspector Demographic Data 07/28/1998
SECY-98-182 Prioritization of International Cooperative Research Activities 07/28/1998
SECY-98-180 Request for Commission Waiver of Staff Cost Recovery Policy for Work Performed for the U.S. Agency for International Development 07/28/1998
SECY 98-178 Weekly Information Report - Week Ending July 17, 1998 07/24/1998
SECY-98-176 Proposed Options for Assessing a Licensee's Safety Conscious Work Environment 07/21/1998
SECY-98-175 Proposed Guidelines for Appendix C, "Other Events of Interest," to the Abnormal Occurrence Report to Congress 07/17/1998
SECY 98-173 Weekly Information Report - Week Ending July 10, 1998 07/16/1998
SECY-98-172 Proposed Rule: "Certification Renewal and Amendment Processes," 10 CFR Part 76 07/10/1998
SECY-98-171 Proposed Rulemaking on 10 CFR Parts 50, 52 and 72 Requirements Concerning Changes, Tests and Experiments and Staff Recommendations on Changes to Other Regulations and Enforcement Policy 07/10/1998
SECY-98-170 Response to Staff Requirements Memorandum of June 30, 1997, Regarding (1) the Use of Graphs or Charts at the Senior Management Meeting, (2) Improvements to Help the Public Understand the Linkages Between the Various Evaluation Mechanisms That the NRC Uses, and (3) Superior Performance Recognition (M970625A) 07/09/1998
SECY-98-169 Weekly Information Report - Week Ending July 2, 1998 07/10/1998
SECY-98-168 Proposed Rulemaking Activity Plan 07/09/1998
SECY-98-166 Summary of Activities Related to Generic Safety Issues 07/06/1998
SECY-98-165 Proposed Revision to 10 CFR 50.65(a)(3) to Require Licensees to Perform Safety Assessments 07/02/1998
SECY-98-164 Final Rule on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 07/02/1998
SECY-98-163 Annual Report on the Status of Prematurely Shut Down Plants 07/01/1998
SECY-98-161 The Westinghouse AP600 Standard Design as it Relates to the Fire Protection and the Spent Fuel Pool Cooling Systems 07/01/1998
SECY-98-160 NRC's 1998 Report to Congress on the Price-Anderson Act 07/02/1998
SECY-98-159 Litigation Report - 1998 - 3 07/01/1998
SECY-98-158 Rulemaking Plan for Implementation of Revised Source Term at Operating Reactors 07/30/1998
SECY-98-157 Compliance of Great Bay Power Corporation with the NRC's Decommissioning Funding Assurance Requirements 07/30/1998
SECY-98-156 Weekly Information Report - Week Ending June 26, 1998 07/01/1998
SECY-98-155 Transition from Site Decommissioning Management Plan to Comprehensive Decommissioning Program 06/30/1998
SECY-98-154 Results of the Revised (NUREG-1465) Source Term Rebaselining for Operating Reactors 06/30/1998
SECY-98-153 Update of Issues Related to Nuclear Power Reactor Financial Qualifications in Response to Restructuring of the Electric Utility Industry 06/29/1998
SECY-98-152 Summary of Issues and Recommended Improvements to the Resident Inspector Program 06/29/1998
SECY-98-150 Final Rule, 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" 06/26/1998
SECY-98-149 Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 4) 06/26/1998
SECY-98-148 Rulemaking Plan: 10 CFR Part 72 - Clarification and Addition of Flexibility 06/25/1998
SECY-98-147 Weekly Information Report - Week Ending June 19, 1998 06/25/1998
SECY-98-146 Final Version Standard Review Plan Chapter for U.S. Enrichment Corporation Privatization 06/22/1998
SECY-98-144 White Paper on Risk-Informed and Performance-Based Regulation 01/22/1998
SECY-98-143 Litigation Report - 1998 - 2 06/22/1998
SECY-98-142 Weekly Information Report - Week Ending June 12, 1998 06/18/1998
SECY-98-139 Trial Use of Application-Specific Regulatory Guide and Standard Review Plan for Risk-Informed Inservice Inspection of Piping 06/11/1998
SECY-98-138 Risk-Informed, Performance-Based and Risk-Informed, Less-Prescriptive Regulation in the Office of Nuclear Material Safety and Safeguards 06/11/1998
SECY-98-137 Equal Employment Opportunity (EEO) Briefing 06/10/1998
SECY-98-135 Decommissioning Pilot Program for Materials Licensees 06/11/1998
SECY-98-134 Weekly Information Report - Week Ending June 5, 1998 06/11/1998
SECY-98-133 Proposed Subsequent Arrangement under the U.S.-EURATOM Agreement for Cooperation to Give Advance Consent to Retransfers of U.S.-Obligated Plutonium to Switzerland 06/10/1998
SECY-98-132 Plans to Increase Performance-Based Approaches in Regulatory Activities (WITS - 9700093) 06/09/1998
SECY-98-131 Status of the Integration Plan for Closure of Severe Accident Issues and the Status of Severe Accident Research 06/08/1998
SECY-98-130 Additional Funding to Make U.S. Nuclear Regulatory Commission Documents on Human Radiation Experiments Available on World-Wide Web 06/08/1998
SECY-98-129 Impact Statement Regarding Elimination of Nuclear Regulatory Commission Funds for Credibility Assessment Team Support for the Federal Bureau of Investigation 06/08/1998
SECY-98-128 Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct Material 06/04/1998
SECY-98-127 Draft Proposed Policy Statement on the Medical Use of Byproduct Material 06/04/1998
SECY-98-126 Rulemaking Plan: Geological and Seismological Characteristics for Siting and Design of Dry Cask Independent Spent Fuel Storage Installations, 10 CFR Part 72 06/04/1998
SECY 98-125 Weekly Information Report - Week Ending May 29, 1998 06/04/1998
SECY-98-123 Performance Evaluation for ACRS and ACNW 06/01/1998
SECY-98-122 Assessment of Technical Skills Availability 05/28/1998
SECY-98-121 Implementation of the IAEA Convention on Nuclear Safety 05/28/1998
SECY-98-120 Enforcement Discretion for Louisiana Licensees 05/28/1998
SECY 98-119 Remaining Issues Related to Recovery of Millstone Nuclear Power Station, Unit 3 05/28/1998
SECY-98-117 Shelwell Services, Inc., Risk Assessment 05/27/1998
SECY 98-115 Weekly Information Report - Week Ending May 22, 1998 05/27/1998
SECY-98-113 Proposed Rule: Expand Applicability of 10 CFR Part 72 to Holders of, and Applicants for, Certificates of Compliance, and Their Contractors and Subcontractors 05/26/1998
SECY 98-111 Weekly Information Report - Week Ending May 15, 1998 05/21/1998
SECY-98-110 Report on Inspection and Programmatic Findings Relating to the Carl C. Drega Incident 05/20/1998
SECY 98-107 Weekly Information Report - Week Ending May 8, 1998 05/13/1998
SECY-98-106 Implementation of New International Atomic Energy Agency Safeguards Measures in the United States 05/13/1998
SECY-98-105 Rulemaking Plan: Energy Compensation Sources for Well Logging and Clarifications - Changes to 10 CFR Part 39 05/12/1998
SECY-98-104 Staff Requirements - COMSECY-96-031 - (DSI-17) - Strategic Assessment Issue Paper: Management and Organization and COMSECY-96-026 (DSI-15) - Management Philosophy 05/07/1998
SECY 98-103 Weekly Information Report - Week Ending May 1, 1998 05/08/1998
SECY-98-102 Core Capabilities 05/06/1998
SECY-98-101 Modifications to the Safety Goal Policy Statement 05/04/1998
SECY-98-099 Status Report of Staff Activities Related to Reviewing the Viability of Entombment as a Decommissioning Option for Power Reactors 05/04/1998
SECY-98-098 Guidelines for Providing Assistance to Agreement States and Alternatives for Training 05/04/1998
SECY-98-097 Advance Final Safety Evaluation Report on the Westinghouse AP600 Standard Design 05/01/1998
SECY-98-096 Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan 05/01/1998
SECY-98-094 Proposed NRC Generic Letter 98-XX, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants" 05/01/1998
SECY-98-093 Proposed NRC Generic Letter 98-xx, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition 04/30/1998
SECY 98-092 Weekly Information Report - Week Ending April 24, 1998 04/30/1998
SECY-98-090 Selected Issues Related to Recovery of Millstone Nuclear Power Station Unit 3 04/24/1998
SECY-98-089 Public Communications Initiative (DSI-14) 04/24/1998
SECY 98-088 Weekly Information Report - Week Ending April 17, 1998 04/23/1998
SECY-98-087 Proposed Generic Letter 98-XX: Interim Guidance for Updated Final Safety Analysis Reports in Accordance with 10 CFR 50.71(e) 04/20/1998
SECY-98-084 Status of Efforts to Finalize Regulations for Radiological Criteria for License Termination: Uranium Recovery Facilities 04/15/1998
SECY-98-083 Plan for the Timely Confirmation of Power Reactor Licensees as "Electric Utilities" as Economic Deregulation Proceeds 04/16/1998
SECY-98-082 Weekly Information Report - Week Ending April 10, 1998 04/15/1998
SECY-98-081 Proposed License to Export Heavy Water to the United Arab Emirates (XMAT0392) 04/14/1998
SECY-98-080 Status Report of the Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 3) 04/14/1998
SECY-98-078 Preparation for Senior Management Meetings for Fuel Cycle Facilities and Higher-Risk Materials Licensees 04/13/1998
SECY-98-077 Proposed Rule: "Respiratory Protection and Controls to Restrict Internal Exposures, 10 CFR Part 20" 04/13/1998
SECY-98-076 Core Research Capabilities 04/09/1998
SECY-98-075 DSI-24 Implementation: Innovative Regulatory Approaches and Risk-Informed, Performance-Based Concepts Applied to Decommissioning 04/09/1998
SECY-98-074 Process for the Declassification and Release of Inventory Difference Data 04/09/1998
SECY-98-073 Litigation Report - 1998 - 1 04/09/1998
SECY 98-072 Weekly Information Report - Week Ending April 3, 1998 04/09/1998
SECY-98-071 Exemption to 10 CFR 72.102(f)(1) Seismic Design Requirement for Three Mile Island Unit 2 Independent Spent Fuel Storage Installation 04/08/1998
SECY-98-068 Consideration of Application of Federal Government-Wide Conflict of Interest or Ethics Requirements and NRC Enforcement Policy on Licensee Integrity Issues to Agreement State Programs 04/03/1998
SECY-98-067 Final Application-Specific Regulatory Guides and Standard Review Plans for Risk-Informed Regulation of Power Reactors 04/02/1998
SECY-98-065 FY 1998 NRC Excellence Plan 04/02/1998
SECY-98-064 Weekly Information Report - Week Ending March 27, 1998 04/03/1998
SECY-98-062 Proposed Section 123 Agreement for Peaceful Nuclear Cooperation with Ukraine 04/01/1998
SECY-98-061 Staff Options for Resolving a Petition for Rulemaking (PRM-50-63 AND 50-63A) Relating to a Re-Evaluation of the Policy Regarding the Use of Potassium Iodide (KI) by the General Public after a Severe Accident at a Nuclear Power Plant 03/31/1998
SECY-98-060 Final Rule: Revision of 10 CFR 32.14(d) to Place Timepieces Containing Gaseous Tritium Light Sources on the Same Regulatory Basis as Timepieces Containing Tritium Paint 03/27/1998
SECY-98-059 Proposed Options for Assessing the Performance and Competency of Licensee Management 03/26/1998
SECY-98-058 Development of a Risk-Informed, Performance-Based Regulation for Fire Protection at Nuclear Power Plants (WITS 9200197) 03/26/1998
SECY-98-057 Weekly Information Report - Week Ending March 20, 1998 03/26/1998
SECY-98-056 Rulemaking Plan: Elimination of 30-day Hold in Loading Spent Fuel after Preoperational Testing of Independent Spent Fuel Storage or Monitored Retrievable Storage Installations 03/24/1998
SECY-98-055 Response to Staff Requirements Memorandum of October 24, 1997, Regarding Improvements in Senior Management Assessment Process for Operating Reactors (M970919C) 03/25/1998
SECY-98-054 Commission Resolution of Significant Issues Associated with the Revision of 10 CFR Part 35, "Medical Uses of Byproduct Material" 03/20/1998
SECY-98-053 Weekly Information Report - Week Ending March 13, 1998 03/19/1998
SECY-98-051 Guidance in Support of Final Rule on Radiological Criteria for License Termination 03/16/1998
SECY-98-049 Status of NRC Research Conducted by the Russian Research Center (I.V. Kurchatov Institute) and the Institute of Nuclear Safety of the Russian Academy of Sciences 03/13/1998
SECY-98-048 Request for Limited Exemption to the Commission's Policy to Allow Commercial Use of an NRC-Supported Code 03/11/1998
SECY 98-047 Weekly Information Report - Week Ending March 6, 1998 03/12/1998
SECY-98-046 Final Rule: Amendments to 10 CFR Parts 30, 40, 50, 70, and 72--Self-Guarantee of Decommissioning Funding by Non-Profit and Non-Bond Issuing Licensees 03/09/1998
SECY-98-045 Status of the Integrated Review of the NRC Assessment Process for Operating Commercial Nuclear Reactors (SRM 9700238) 03/09/1998
SECY-98-044 Modified Rulemaking Plan: "Certification Renewal and Amendment Process," 10 CFR Part 76 03/09/1998
SECY-98-043 Annual Status Report on the Administration of NRC's Requalification Program and the Initial Operator Licensing Examinations (WITS 8800098) 03/06/1998
SECY-98-042 Amendment to SECY-97-288, "Report to Congress on Abnormal Occurrences for Fiscal Year 1997" 03/05/1998
SECY-98-041 Weekly Information Report - Week Ending February 27, 1998 03/05/1998
SECY-98-040 Final Rule: Requirements for Shipping Packages Used to Transport Vitrified High-Level Waste 03/05/1998
SECY-98-039 Request by Oregon to Relinquish Authority for Sealed Source and Device Evaluation and Approval 03/04/1998
SECY-98-038 Hanford Tank Waste Remediation System Privatization Co-Located Worker Standards 03/04/1998
SECY-98-037 Core Capabilities (COMSECY-96-027) 03/04/1998
SECY-98-036 Rulemaking to Modify Event Reporting Requirements for Power Reactors 03/04/1998
SECY-98-033 Proposed Rule: Miscellaneous Changes to 10 CFR Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste 02/26/1998
SECY-98-032 Revised Process for Information Technology Capital Planning and Investment Control 02/27/1998
SECY 98-031 Weekly Information Report - Week Ending February 20, 1998 02/27/1998
SECY-98-030 Implementation of DSI 22 Research 02/25/1998
SECY-98-028 Regulatory Options for Setting Standards on Clearance of Materials and Equipment Having Residual Radioactivity 02/19/1998
SECY-98-027 Weekly Information Report - Week Ending February 13, 1998 02/18/1998
SECY-98-025 Revised Schedule for Guidance in Support of Final Rule on Radiological Criteria for License Termination 02/17/1998
SECY-98-024 Final Amendments to 10 CFR Parts 60, 72, 73, 74, and 75, "Physical Protection for Spent Nuclear Fuel and High-Level Radioactive Waste" 02/13/1998
SECY-98-023 Proposed "Subsequent Arrangement" to Authorize Argentina to Recover and Use for Medical Isotope Production, Two Kilograms of U.S.-Supplied, Unirradiated High Enriched Uranium (HEU) 02/13/1998
SECY-98-019 Annual Report on Court Litigation (Calendar Year 1997) 02/04/1998
SECY-98-018 Proposed License to Export Special Nuclear Material (XSNM02999) to Brazil 02/04/1998
SECY-98-017 Weekly Information Report - Week Ending February 6, 1998 02/11/1998
SECY-98-015 Final General Regulatory Guide and Standard Review Plan for Risk-Informed Regulation of Power Reactors 01/30/1998
SECY-98-014 Annual Report on Commission Adjudication 01/30/1998
SECY-98-013 Weekly Information Report - Week Ending January 23, 1998 01/28/1998
SECY-98-012 Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan 01/23/1998
SECY-98-011 Potential Funding Assistance for Agreement States for Closure of Formerly Terminated NRC Licenses 01/22/1998
SECY-98-010 Petition for Envirocare of Utah to Possess Special Nuclear Material in Excess of Current Regulatory Limits 01/20/1998
SECY-98-009 Weekly Information Report - Week Ending January 16, 1998 01/22/1998
SECY-98-008 Weekly Information Report - Week Ending January 9, 1998 01/15/1998
SECY-98-007 Annual Status Report on Licensing Actions, Fiscal Year 1997 01/09/1998
SECY-98-006 Proposed Agreement for Cooperation Between the U.S. and Romania 01/12/1998
SECY-98-004 Weekly Information Report - Week Ending December 26, 1997 and January 2, 1998 01/08/1998
SECY-98-003 Organizational Conflict of Interest Regarding Department of Energy Laboratories 01/06/1998
SECY-98-001 Staff Requirements Memorandum 951219A - Briefing on Mechanisms for Addressing Generic Safety Issues 01/02/1998

Page Last Reviewed/Updated Monday, October 02, 2023