Document Number |
Description |
Date |
SECY-98-303 |
Interim Enforcement Policy Regarding Proposed New Requirements for the Possession of Industrial Devices Containing Byproduct Material (10 CFR 31.5) |
12/29/1998 |
SECY-98-302 |
Annual Status Report on Licensing Actions, Fiscal Year 1998 |
12/29/1998 |
SECY-98-301 |
Litigation Report - 1998 - 6 |
12/29/1998 |
SECY-98-300 |
Options for Risk-Informed Revisions to 10 CFR Part 50 - "Domestic Licensing of Production and Utilization Facilities" |
12/23/1998 |
SECY-98-299 |
Weekly Information Report - Week Ending December 18, 1998 |
12/23/1998 |
SECY-98-298 |
Status Report on Accident Sequence Precursor Program and Related Initiatives |
12/22/1998 |
SECY-98-296 |
Agency Policy Regarding Licensee Recapture of Low-Power Testing or Shutdown Time for Nuclear Power Plants |
12/21/1998 |
SECY-98-295 |
Effectiveness of Criteria for Funding Agreement State Training |
12/18/1998 |
SECY-98-294 |
Changes to Paragraph (h) of 10 CFR Part 50.55a, "Codes and Standards" |
12/18/1998 |
SECY-98-293 |
Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 6) |
12/18/1998 |
SECY-98-291 |
Plan for Improving the Effectiveness of NRC's Training Programs |
12/18/1998 |
SECY-98-290 |
Litigation Report - 1998 - 5 |
12/16/1998 |
SECY-98-289 |
Proposed Amendments to 10 CFR Parts 21, 50, and 54 Regarding Use of Alternative Source Terms at Operating Reactors |
12/15/1998 |
SECY-98-288 |
Weekly Information Report - Week Ending December 11, 1998 |
12/15/1998 |
SECY-98-286 |
Status Report on the Continuing Recovery of Millstone Nuclear Power Station |
12/11/1998 |
SECY 98-285 |
Weekly Information Report - Week Ending December 4, 1998 |
12/10/1998 |
SECY-98-284 |
Transfers of Material Containing less than 0.05 Percent by Weight Source Material under 10 CFR 40.51(b)(3) and (B)(4), and 40.13(a) |
12/08/1998 |
SECY-98-282 |
Part 52 Rulemaking Plan |
12/04/1998 |
SECY-98-281 |
Resident Inspector Compensation Policy |
12/02/1998 |
SECY-98-280 |
Weekly Information Report - Week Ending November 27, 1998 |
12/03/1998 |
SECY-98-279 |
Partial Granting of Petition for Rulemaking Submitted by the Nuclear Energy Institute (PRM-50-62) |
11/30/1998 |
SECY-98-278 |
Proposed Rule — "Changes to Requirements for Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51)" |
12/01/1998 |
SECY-98-277 |
The Commissioner's Assistant Candidate Pool |
11/25/1998 |
SECY-98-276 |
Weekly Information Report - Week Ending November 20, 1998 |
11/25/1998 |
SECY-98-275 |
Report to Congress on the Gaseous Diffusion Plants Located near Paducah, Kentucky, and Portsmouth, Ohio |
11/24/1998 |
SECY-98-274 |
Commonwealth Edison Company's Proposal to Centralize its Emergency Operations Facilities at its Corporate Offices |
11/23/1998 |
SECY-98-273 |
Potential Funding Assistance for Agreement States for Closure of Formerly Terminated NRC Licenses |
11/20/1998 |
SECY-98-272 |
Proposed Arrangement for Technical Information Exchange and Cooperation Between the U.S. NRC and Romanian National Commission for Nuclear Activities Control |
11/23/1998 |
SECY-98-271 |
Equal Employment Opportunity (EEO) Briefing |
11/18/1998 |
SECY-98-270 |
Results of the Staff's Evaluation of Ongoing Feedback from Licensees Regarding the Impact of NRC's Activities on Licensees' Operations |
11/18/1998 |
SECY-98-269 |
Weekly Information Report - Week Ending November 13, 1998 |
11/18/1998 |
SECY-98-267 |
Rulemaking Plan for the AP600 |
11/16/1998 |
SECY-98-266 |
Final Rule -- Requirements for Initial Operator Licensing Examinations |
11/13/1998 |
SECY 98-265 |
Weekly Information Report - Week Ending November 6, 1998 |
11/12/1998 |
SECY-98-264 |
Proposed Amendments to 10 CFR 50.47; Granting of Petitions for Rulemaking (PRM 50-63 and 50-63a) Relating to a Reevaluation of Policy on the Use of Potassium Iodide (KI) after a Severe Accident at a Nuclear Power Plant |
11/10/1998 |
SECY-98-263 |
Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct Material |
11/09/1998 |
SECY-98-261 |
Policy Concerning Bundling of Exempt Quantities |
11/05/1998 |
SECY-98-259 |
Weekly Information Report - Week Ending October 30, 1998 |
11/05/1998 |
SECY-98-258 |
DSI-24 Implementation: Decommissioning Licensing Actions and Priorities and Milestones for Addressing Rulemaking and Guidance Development |
11/04/1998 |
Commissioner McGaffigan's Comments |
12/08/1998 |
SECY-98-257 |
Final Rule, Part 2, Subpart M - "Public Notification, Availability of Documents and Records, Hearing Requests and Procedures for Hearings on License Transfer Applications" |
11/03/1998 |
SECY-98-256 |
Proposed Revision to the Enforcement Policy to Address Severity Level IV Violations at Power Reactors |
11/03/1998 |
SECY-98-255 |
Early Public Input on Comprehensive Rule on Generally Licensed Devices |
11/02/1998 |
Commissioner McGaffigan's Comments |
|
SECY-98-253 |
Applicability of Plant-Specific Backfit Requirements to Plants Undergoing Decommissioning |
11/04/1998 |
SECY-98-252 |
Preliminary Staff Views Concerning its Review of the Foreign Ownership Aspects of Amergen, Inc.'s Proposed Purchase of Three Mile Island, Unit 1 |
10/30/1998 |
SECY-98-251 |
Decommissioning Criteria for West Valley |
10/30/1998 |
SECY-98-249 |
Weekly Information Report - Week Ending October 23, 1998 |
10/29/1998 |
SECY-98-248 |
Proposed Generic Letter 98-xx "Steam Generator Tube Integrity" |
10/28/1998 |
SECY-98-247 |
Risk-Informed, Performance-Based Fire Protection at Nuclear Power Plants |
10/27/1998 |
SECY-98-246 |
Standard Review Plan Regarding Foreign Ownership, Control, or Domination of Applicants for Reactor Licenses |
10/23/1998 |
SECY-98-245 |
Rulemaking Plan - Protection Against Discrete Radioactive Particle (DRP) Exposures (10 CFR Part 20) |
10/23/1998 |
SECY-98-244 |
NRC Human Performance Plan |
10/22/1998 |
SECY-98-242 |
Screening Table for Building-Surface Contamination, as Guidance in Support of the Final Rule on Radiological Criteria for License Termination |
10/21/1998 |
SECY-98-241 |
Weekly Information Report - Week Ending October 16, 1998 |
10/21/1998 |
SECY-98-239 |
Post-Disposal Criticality Research |
10/19/1998 |
SECY-98-237 |
Final Rule, Part 2, Subpart J, "Procedures Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository" |
10/19/1998 |
SECY-98-236 |
Weekly Information Report - Week Ending October 9, 1998 |
10/15/1998 |
SECY-98-235 |
Proposed Revision of Appendix K to Title 10 Part 50 of the Code of Federal Regulations (10 CFR Part 50) |
10/09/1998 |
SECY-98-234 |
Weekly Information Report - Week Ending October 2, 1998 |
10/08/1998 |
SECY-98-232 |
Seaman Nuclear's Application for a License to Distribute Portable Moisture Density Gauges to General Licensees |
10/05/1998 |
SECY-98-231 |
Authorization of the Trojan Reactor Vessel Package for One-Time Shipment for Disposal |
10/02/1998 |
Commissioner McGaffigan's Comments
|
10/07/1998 |
SECY-98-230 |
Insights from NRC Research on Fire Protection and Related Issues |
10/02/1998 |
SECY 98-229 |
Weekly Information Report - Week Ending September 25, 1998 |
10/02/1998 |
SECY-98-228 |
Proposed Streamlining and Consolidation of AEOD Functions and Responsibilities |
10/01/1998 |
SECY-98-226 |
Issuance of a Section 274f, Atomic Energy Act Order to Exempt Envirocare of Utah, Inc. from the Licensing Requirements for Special Nuclear Material in Diffuse Waste That Will Be Regulated by the State of Utah |
09/29/1998 |
Chairman Jackson's Comments |
10/20/1998 |
Commission McGaffigan's Comments |
10/05/1998 |
SECY-98-225 |
Proposed Rule: 10 CFR Part 63 — "Disposal of High-Level Radioactive Wastes in a Proposed Geologic Repository at Yucca Mountain, Nevada" |
09/28/1998 |
SECY-98-224 |
Staff and Industry Activities Pertaining to the Management of Commitments Made by Power Reactor Licensees to the NRC |
09/28/1998 |
SECY-98-223 |
Litigation Report - 1998 - 4 |
09/25/1998 |
SECY-98-222 |
Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 5) |
09/24/1998 |
SECY 98-220 |
Weekly Information Report - Week Ending September 18, 1998 |
09/24/1998 |
SECY-98-219 |
Completion of Staff's Review and Issuance of the Final Safety Evaluation Report on Reduction in Augmented Examination Requirements for Boiling Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55a(g)(6)(ii)(A) |
09/21/1998 |
SECY-98-218 |
Suspension of the Systematic Assessment of Licensee Performance Program |
09/21/1998 |
SECY-98-217 |
Weekly Information Report - Week Ending September 11, 1998 |
09/18/1998 |
SECY-98-215 |
Request by Arkansas to Relinquish Authority for Sealed Source and Device Evaluation and Approval |
09/15/1998 |
SECY-98-211 |
Weekly Information Report - Week Ending September 4, 1998 |
09/11/1998 |
SECY-98-209 |
Proposed Agreement with the State of Ohio and Compatibility Requirements of 10 CFR Part 20, Subpart E |
09/08/1998 |
SECY-98-208 |
Weekly Information Report - Week Ending August 28, 1998 |
09/03/1998 |
SECY-98-206 |
National Academy of Sciences/National Research Council Grant to Fund the Biological Effects of Ionization Radiation Study Number VII (BEIR VII) |
09/01/1998 |
SECY-98-204 |
Weekly Information Report - Week Ending August 21, 1998 |
08/28/1998 |
SECY-98-205 |
Funding for Nuclear Regulatory Commission Material Protection, Control, and Accounting Assistance to the Republics of the Former Soviet Union |
08/28/1998 |
SECY-98-202 |
Implementation of the Convention on Nuclear Safety |
08/25/1998 |
SECY-98-201 |
Deferral of Regulatory Oversight of Certain Portions of the Lake City Army Ammunition Plant to the U.S. Environmental Protection Agency |
08/21/1998 |
SECY-98-200 |
Weekly Information Report - Week Ending August 14, 1998 |
08/20/1998 |
SECY-98-199 |
Proposed Rule: 10 CFR Part 31 - "Requirement for Those Who Possess Certain Industrial Devices Containing Byproduct Material to Provide Requested Information" |
08/19/1998 |
SECY-98-198 |
Status of the Issue Resolution Process in the High-Level Radioactive Waste Program at Yucca Mountain, Nevada |
08/19/1998 |
SECY-98-197 |
Proposed Rule - Revision to Part 2 Establishing Subpart M to Govern Requests for License Transfer Approval and Associated Requests for Hearings |
08/14/1998 |
SECY-98-196 |
Removal of Clevite Corporation Site from the Site Decommissioning Management Plan |
08/13/1998 |
SECY-98-195 |
Removal of the Cabot Boyertown Site from the Site Decommissioning Management Plan |
08/13/1998 |
SECY-98-194 |
Upgrading the NRC Operations Center Emergency Telecommunications System |
08/13/1998 |
SECY 98-193 |
Weekly Information Report - Week Ending August 7, 1998 |
08/13/1998 |
SECY-98-192 |
Resolution of Allegations Concerning the Performance of Agreement State Programs |
08/11/1998 |
SECY 98-191 |
Weekly Information Report - Week Ending July 31, 1998 |
08/07/1998 |
SECY-98-190 |
Proposed License to Export a 10 Megawatt TRIGA Research Reactor to Thailand (XR166) |
08/05/1998 |
SECY-98-188 |
A Proposed Simplification of the Rulemaking Process for Certificate of Compliance Rulemakings |
08/03/1998 |
SECY-98-187 |
Interim Status Report -- Fire Protection Functional Inspection Program |
08/03/1998 |
SECY-98-186 |
Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan |
07/31/1998 |
SECY-98-185 |
Proposed Rulemaking - Revised Requirements for the Domestic Licensing of Special Nuclear Material |
07/30/1998 |
SECY 98-184 |
Weekly Information Report - Week Ending July 24, 1998 |
07/30/1998 |
SECY-98-183 |
Submittal and Analysis of Revised Resident Inspector Demographic Data |
07/28/1998 |
SECY-98-182 |
Prioritization of International Cooperative Research Activities |
07/28/1998 |
SECY-98-180 |
Request for Commission Waiver of Staff Cost Recovery Policy for Work Performed for the U.S. Agency for International Development |
07/28/1998 |
SECY 98-178 |
Weekly Information Report - Week Ending July 17, 1998 |
07/24/1998 |
SECY-98-176 |
Proposed Options for Assessing a Licensee's Safety Conscious Work Environment |
07/21/1998 |
SECY-98-175 |
Proposed Guidelines for Appendix C, "Other Events of Interest," to the Abnormal Occurrence Report to Congress |
07/17/1998 |
SECY 98-173 |
Weekly Information Report - Week Ending July 10, 1998 |
07/16/1998 |
SECY-98-172 |
Proposed Rule: "Certification Renewal and Amendment Processes," 10 CFR Part 76 |
07/10/1998 |
SECY-98-171 |
Proposed Rulemaking on 10 CFR Parts 50, 52 and 72 Requirements Concerning Changes, Tests and Experiments and Staff Recommendations on Changes to Other Regulations and Enforcement Policy |
07/10/1998 |
SECY-98-170 |
Response to Staff Requirements Memorandum of June 30, 1997, Regarding (1) the Use of Graphs or Charts at the Senior Management Meeting, (2) Improvements to Help the Public Understand the Linkages Between the Various Evaluation Mechanisms That the NRC Uses, and (3) Superior Performance Recognition (M970625A) |
07/09/1998 |
SECY-98-169 |
Weekly Information Report - Week Ending July 2, 1998 |
07/10/1998 |
SECY-98-168 |
Proposed Rulemaking Activity Plan |
07/09/1998 |
SECY-98-166 |
Summary of Activities Related to Generic Safety Issues |
07/06/1998 |
SECY-98-165 |
Proposed Revision to 10 CFR 50.65(a)(3) to Require Licensees to Perform Safety Assessments |
07/02/1998 |
SECY-98-164 |
Final Rule on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors |
07/02/1998 |
SECY-98-163 |
Annual Report on the Status of Prematurely Shut Down Plants |
07/01/1998 |
SECY-98-161 |
The Westinghouse AP600 Standard Design as it Relates to the Fire Protection and the Spent Fuel Pool Cooling Systems |
07/01/1998 |
SECY-98-160 |
NRC's 1998 Report to Congress on the Price-Anderson Act |
07/02/1998 |
SECY-98-159 |
Litigation Report - 1998 - 3 |
07/01/1998 |
SECY-98-158 |
Rulemaking Plan for Implementation of Revised Source Term at Operating Reactors |
07/30/1998 |
SECY-98-157 |
Compliance of Great Bay Power Corporation with the NRC's Decommissioning Funding Assurance Requirements |
07/30/1998 |
SECY-98-156 |
Weekly Information Report - Week Ending June 26, 1998 |
07/01/1998 |
SECY-98-155 |
Transition from Site Decommissioning Management Plan to Comprehensive Decommissioning Program |
06/30/1998 |
SECY-98-154 |
Results of the Revised (NUREG-1465) Source Term Rebaselining for Operating Reactors |
06/30/1998 |
SECY-98-153 |
Update of Issues Related to Nuclear Power Reactor Financial Qualifications in Response to Restructuring of the Electric Utility Industry |
06/29/1998 |
SECY-98-152 |
Summary of Issues and Recommended Improvements to the Resident Inspector Program |
06/29/1998 |
SECY-98-150 |
Final Rule, 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" |
06/26/1998 |
SECY-98-149 |
Status Report of the U.S. Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 4) |
06/26/1998 |
SECY-98-148 |
Rulemaking Plan: 10 CFR Part 72 - Clarification and Addition of Flexibility |
06/25/1998 |
SECY-98-147 |
Weekly Information Report - Week Ending June 19, 1998 |
06/25/1998 |
SECY-98-146 |
Final Version Standard Review Plan Chapter for U.S. Enrichment Corporation Privatization |
06/22/1998 |
SECY-98-144 |
White Paper on Risk-Informed and Performance-Based Regulation |
01/22/1998 |
SECY-98-143 |
Litigation Report - 1998 - 2 |
06/22/1998 |
SECY-98-142 |
Weekly Information Report - Week Ending June 12, 1998 |
06/18/1998 |
SECY-98-139 |
Trial Use of Application-Specific Regulatory Guide and Standard Review Plan for Risk-Informed Inservice Inspection of Piping |
06/11/1998 |
SECY-98-138 |
Risk-Informed, Performance-Based and Risk-Informed, Less-Prescriptive Regulation in the Office of Nuclear Material Safety and Safeguards |
06/11/1998 |
SECY-98-137 |
Equal Employment Opportunity (EEO) Briefing |
06/10/1998 |
SECY-98-135 |
Decommissioning Pilot Program for Materials Licensees |
06/11/1998 |
SECY-98-134 |
Weekly Information Report - Week Ending June 5, 1998 |
06/11/1998 |
SECY-98-133 |
Proposed Subsequent Arrangement under the U.S.-EURATOM Agreement for Cooperation to Give Advance Consent to Retransfers of U.S.-Obligated Plutonium to Switzerland |
06/10/1998 |
SECY-98-132 |
Plans to Increase Performance-Based Approaches in Regulatory Activities (WITS - 9700093) |
06/09/1998 |
SECY-98-131 |
Status of the Integration Plan for Closure of Severe Accident Issues and the Status of Severe Accident Research |
06/08/1998 |
SECY-98-130 |
Additional Funding to Make U.S. Nuclear Regulatory Commission Documents on Human Radiation Experiments Available on World-Wide Web |
06/08/1998 |
SECY-98-129 |
Impact Statement Regarding Elimination of Nuclear Regulatory Commission Funds for Credibility Assessment Team Support for the Federal Bureau of Investigation |
06/08/1998 |
SECY-98-128 |
Proposed Rule: Revision of 10 CFR Part 35, Medical Use of Byproduct Material |
06/04/1998 |
SECY-98-127 |
Draft Proposed Policy Statement on the Medical Use of Byproduct Material |
06/04/1998 |
SECY-98-126 |
Rulemaking Plan: Geological and Seismological Characteristics for Siting and Design of Dry Cask Independent Spent Fuel Storage Installations, 10 CFR Part 72 |
06/04/1998 |
SECY 98-125 |
Weekly Information Report - Week Ending May 29, 1998 |
06/04/1998 |
SECY-98-123 |
Performance Evaluation for ACRS and ACNW |
06/01/1998 |
SECY-98-122 |
Assessment of Technical Skills Availability |
05/28/1998 |
SECY-98-121 |
Implementation of the IAEA Convention on Nuclear Safety |
05/28/1998 |
SECY-98-120 |
Enforcement Discretion for Louisiana Licensees |
05/28/1998 |
SECY 98-119 |
Remaining Issues Related to Recovery of Millstone Nuclear Power Station, Unit 3 |
05/28/1998 |
SECY-98-117 |
Shelwell Services, Inc., Risk Assessment |
05/27/1998 |
SECY 98-115 |
Weekly Information Report - Week Ending May 22, 1998 |
05/27/1998 |
SECY-98-113 |
Proposed Rule: Expand Applicability of 10 CFR Part 72 to Holders of, and Applicants for, Certificates of Compliance, and Their Contractors and Subcontractors |
05/26/1998 |
SECY 98-111 |
Weekly Information Report - Week Ending May 15, 1998 |
05/21/1998 |
SECY-98-110 |
Report on Inspection and Programmatic Findings Relating to the Carl C. Drega Incident |
05/20/1998 |
SECY 98-107 |
Weekly Information Report - Week Ending May 8, 1998 |
05/13/1998 |
SECY-98-106 |
Implementation of New International Atomic Energy Agency Safeguards Measures in the United States |
05/13/1998 |
SECY-98-105 |
Rulemaking Plan: Energy Compensation Sources for Well Logging and Clarifications - Changes to 10 CFR Part 39 |
05/12/1998 |
SECY-98-104 |
Staff Requirements - COMSECY-96-031 - (DSI-17) - Strategic Assessment Issue Paper: Management and Organization and COMSECY-96-026 (DSI-15) - Management Philosophy |
05/07/1998 |
SECY 98-103 |
Weekly Information Report - Week Ending May 1, 1998 |
05/08/1998 |
SECY-98-102 |
Core Capabilities |
05/06/1998 |
SECY-98-101 |
Modifications to the Safety Goal Policy Statement |
05/04/1998 |
SECY-98-099 |
Status Report of Staff Activities Related to Reviewing the Viability of Entombment as a Decommissioning Option for Power Reactors |
05/04/1998 |
SECY-98-098 |
Guidelines for Providing Assistance to Agreement States and Alternatives for Training |
05/04/1998 |
SECY-98-097 |
Advance Final Safety Evaluation Report on the Westinghouse AP600 Standard Design |
05/01/1998 |
SECY-98-096 |
Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan |
05/01/1998 |
SECY-98-094 |
Proposed NRC Generic Letter 98-XX, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants" |
05/01/1998 |
SECY-98-093 |
Proposed NRC Generic Letter 98-xx, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition |
04/30/1998 |
SECY 98-092 |
Weekly Information Report - Week Ending April 24, 1998 |
04/30/1998 |
SECY-98-090 |
Selected Issues Related to Recovery of Millstone Nuclear Power Station Unit 3 |
04/24/1998 |
SECY-98-089 |
Public Communications Initiative (DSI-14) |
04/24/1998 |
SECY 98-088 |
Weekly Information Report - Week Ending April 17, 1998 |
04/23/1998 |
SECY-98-087 |
Proposed Generic Letter 98-XX: Interim Guidance for Updated Final Safety Analysis Reports in Accordance with 10 CFR 50.71(e) |
04/20/1998 |
SECY-98-084 |
Status of Efforts to Finalize Regulations for Radiological Criteria for License Termination: Uranium Recovery Facilities |
04/15/1998 |
SECY-98-083 |
Plan for the Timely Confirmation of Power Reactor Licensees as "Electric Utilities" as Economic Deregulation Proceeds |
04/16/1998 |
SECY-98-082 |
Weekly Information Report - Week Ending April 10, 1998 |
04/15/1998 |
SECY-98-081 |
Proposed License to Export Heavy Water to the United Arab Emirates (XMAT0392) |
04/14/1998 |
SECY-98-080 |
Status Report of the Nuclear Regulatory Commission Task Force on Oversight of the U.S. Department of Energy, in Response to COMSECY-96-053-DSI 2 (Report No. 3) |
04/14/1998 |
SECY-98-078 |
Preparation for Senior Management Meetings for Fuel Cycle Facilities and Higher-Risk Materials Licensees |
04/13/1998 |
SECY-98-077 |
Proposed Rule: "Respiratory Protection and Controls to Restrict Internal Exposures, 10 CFR Part 20" |
04/13/1998 |
SECY-98-076 |
Core Research Capabilities |
04/09/1998 |
SECY-98-075 |
DSI-24 Implementation: Innovative Regulatory Approaches and Risk-Informed, Performance-Based Concepts Applied to Decommissioning |
04/09/1998 |
SECY-98-074 |
Process for the Declassification and Release of Inventory Difference Data |
04/09/1998 |
SECY-98-073 |
Litigation Report - 1998 - 1 |
04/09/1998 |
SECY 98-072 |
Weekly Information Report - Week Ending April 3, 1998 |
04/09/1998 |
SECY-98-071 |
Exemption to 10 CFR 72.102(f)(1) Seismic Design Requirement for Three Mile Island Unit 2 Independent Spent Fuel Storage Installation |
04/08/1998 |
SECY-98-068 |
Consideration of Application of Federal Government-Wide Conflict of Interest or Ethics Requirements and NRC Enforcement Policy on Licensee Integrity Issues to Agreement State Programs |
04/03/1998 |
SECY-98-067 |
Final Application-Specific Regulatory Guides and Standard Review Plans for Risk-Informed Regulation of Power Reactors |
04/02/1998 |
SECY-98-065 |
FY 1998 NRC Excellence Plan |
04/02/1998 |
SECY-98-064 |
Weekly Information Report - Week Ending March 27, 1998 |
04/03/1998 |
SECY-98-062 |
Proposed Section 123 Agreement for Peaceful Nuclear Cooperation with Ukraine |
04/01/1998 |
SECY-98-061 |
Staff Options for Resolving a Petition for Rulemaking (PRM-50-63 AND 50-63A) Relating to a Re-Evaluation of the Policy Regarding the Use of Potassium Iodide (KI) by the General Public after a Severe Accident at a Nuclear Power Plant |
03/31/1998 |
SECY-98-060 |
Final Rule: Revision of 10 CFR 32.14(d) to Place Timepieces Containing Gaseous Tritium Light Sources on the Same Regulatory Basis as Timepieces Containing Tritium Paint |
03/27/1998 |
SECY-98-059 |
Proposed Options for Assessing the Performance and Competency of Licensee Management |
03/26/1998 |
SECY-98-058 |
Development of a Risk-Informed, Performance-Based Regulation for Fire Protection at Nuclear Power Plants (WITS 9200197) |
03/26/1998 |
SECY-98-057 |
Weekly Information Report - Week Ending March 20, 1998 |
03/26/1998 |
SECY-98-056 |
Rulemaking Plan: Elimination of 30-day Hold in Loading Spent Fuel after Preoperational Testing of Independent Spent Fuel Storage or Monitored Retrievable Storage Installations |
03/24/1998 |
SECY-98-055 |
Response to Staff Requirements Memorandum of October 24, 1997, Regarding Improvements in Senior Management Assessment Process for Operating Reactors (M970919C) |
03/25/1998 |
SECY-98-054 |
Commission Resolution of Significant Issues Associated with the Revision of 10 CFR Part 35, "Medical Uses of Byproduct Material" |
03/20/1998 |
SECY-98-053 |
Weekly Information Report - Week Ending March 13, 1998 |
03/19/1998 |
SECY-98-051 |
Guidance in Support of Final Rule on Radiological Criteria for License Termination |
03/16/1998 |
SECY-98-049 |
Status of NRC Research Conducted by the Russian Research Center (I.V. Kurchatov Institute) and the Institute of Nuclear Safety of the Russian Academy of Sciences |
03/13/1998 |
SECY-98-048 |
Request for Limited Exemption to the Commission's Policy to Allow Commercial Use of an NRC-Supported Code |
03/11/1998 |
SECY 98-047 |
Weekly Information Report - Week Ending March 6, 1998 |
03/12/1998 |
SECY-98-046 |
Final Rule: Amendments to 10 CFR Parts 30, 40, 50, 70, and 72--Self-Guarantee of Decommissioning Funding by Non-Profit and Non-Bond Issuing Licensees |
03/09/1998 |
SECY-98-045 |
Status of the Integrated Review of the NRC Assessment Process for Operating Commercial Nuclear Reactors (SRM 9700238) |
03/09/1998 |
SECY-98-044 |
Modified Rulemaking Plan: "Certification Renewal and Amendment Process," 10 CFR Part 76 |
03/09/1998 |
SECY-98-043 |
Annual Status Report on the Administration of NRC's Requalification Program and the Initial Operator Licensing Examinations (WITS 8800098) |
03/06/1998 |
SECY-98-042 |
Amendment to SECY-97-288, "Report to Congress on Abnormal Occurrences for Fiscal Year 1997" |
03/05/1998 |
SECY-98-041 |
Weekly Information Report - Week Ending February 27, 1998 |
03/05/1998 |
SECY-98-040 |
Final Rule: Requirements for Shipping Packages Used to Transport Vitrified High-Level Waste |
03/05/1998 |
SECY-98-039 |
Request by Oregon to Relinquish Authority for Sealed Source and Device Evaluation and Approval |
03/04/1998 |
SECY-98-038 |
Hanford Tank Waste Remediation System Privatization Co-Located Worker Standards |
03/04/1998 |
SECY-98-037 |
Core Capabilities (COMSECY-96-027) |
03/04/1998 |
SECY-98-036 |
Rulemaking to Modify Event Reporting Requirements for Power Reactors |
03/04/1998 |
SECY-98-033 |
Proposed Rule: Miscellaneous Changes to 10 CFR Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste |
02/26/1998 |
SECY-98-032 |
Revised Process for Information Technology Capital Planning and Investment Control |
02/27/1998 |
SECY 98-031 |
Weekly Information Report - Week Ending February 20, 1998 |
02/27/1998 |
SECY-98-030 |
Implementation of DSI 22 Research |
02/25/1998 |
SECY-98-028 |
Regulatory Options for Setting Standards on Clearance of Materials and Equipment Having Residual Radioactivity |
02/19/1998 |
SECY-98-027 |
Weekly Information Report - Week Ending February 13, 1998 |
02/18/1998 |
SECY-98-025 |
Revised Schedule for Guidance in Support of Final Rule on Radiological Criteria for License Termination |
02/17/1998 |
SECY-98-024 |
Final Amendments to 10 CFR Parts 60, 72, 73, 74, and 75, "Physical Protection for Spent Nuclear Fuel and High-Level Radioactive Waste" |
02/13/1998 |
SECY-98-023 |
Proposed "Subsequent Arrangement" to Authorize Argentina to Recover and Use for Medical Isotope Production, Two Kilograms of U.S.-Supplied, Unirradiated High Enriched Uranium (HEU) |
02/13/1998 |
SECY-98-019 |
Annual Report on Court Litigation (Calendar Year 1997) |
02/04/1998 |
SECY-98-018 |
Proposed License to Export Special Nuclear Material (XSNM02999) to Brazil |
02/04/1998 |
SECY-98-017 |
Weekly Information Report - Week Ending February 6, 1998 |
02/11/1998 |
SECY-98-015 |
Final General Regulatory Guide and Standard Review Plan for Risk-Informed Regulation of Power Reactors |
01/30/1998 |
SECY-98-014 |
Annual Report on Commission Adjudication |
01/30/1998 |
SECY-98-013 |
Weekly Information Report - Week Ending January 23, 1998 |
01/28/1998 |
SECY-98-012 |
Quarterly Status Report on the Probabilistic Risk Assessment Implementation Plan |
01/23/1998 |
SECY-98-011 |
Potential Funding Assistance for Agreement States for Closure of Formerly Terminated NRC Licenses |
01/22/1998 |
SECY-98-010 |
Petition for Envirocare of Utah to Possess Special Nuclear Material in Excess of Current Regulatory Limits |
01/20/1998 |
SECY-98-009 |
Weekly Information Report - Week Ending January 16, 1998 |
01/22/1998 |
SECY-98-008 |
Weekly Information Report - Week Ending January 9, 1998 |
01/15/1998 |
SECY-98-007 |
Annual Status Report on Licensing Actions, Fiscal Year 1997 |
01/09/1998 |
SECY-98-006 |
Proposed Agreement for Cooperation Between the U.S. and Romania |
01/12/1998 |
SECY-98-004 |
Weekly Information Report - Week Ending December 26, 1997 and January 2, 1998 |
01/08/1998 |
SECY-98-003 |
Organizational Conflict of Interest Regarding Department of Energy Laboratories |
01/06/1998 |
SECY-98-001 |
Staff Requirements Memorandum 951219A - Briefing on Mechanisms for Addressing Generic Safety Issues |
01/02/1998 |