Staff Requirements Memoranda (SRM) for 2002

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document number Description Date
SECY-02-0225 Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis 03/21/2003
SECY-02-0221 Final Rule to Standardize the Process for Allowing a Licensee to Release Part of Its Reactor Facility or Site for Unrestricted Use Before NRC Has Approved Its License Termination Plan 03/07/2003
SECY-02-0216 Proposed Process for Providing Information on Significant Nuclear Materials Issues and Adverse Licensee Performance 02/25/2003
SECY-02-0214 Guidance on the Use of Effective Dose Equivalent in External Dose Assessments 01/22/2003
SECY-02-0204 Update of Uranium Recovery Guidance Documents 05/07/2003
SECY-02-0199 Denial of Petition for Rulemaking to Use Information from Prior Licensing Actions as Resolved Information for Early Site Permit and Combined License Applications (PRM-52-1) 05/07/2002
SECY-02-0196 Recommendations Stemming from the Systematic Assessment of Exemptions from Licensing in 10 CFR parts 30 and 40; and a Rulemaking Plan for Risk-informing 10 CFR Parts 30, 31, and 32 11/17/2003
SECY-02-0194 Options for Addressing Part 35 Training and Experience Issues Associated With Recognition of Specialty Boards by NRC 02/12/2003
SECY-02-0191 Status of the Entombment Option for Power Reactors 11/26/2002
SECY-02-0182 Briefing on EEO Program 11/07/2002
SECY-02-0180 Legal and Financial Policy Issues Associated with Licensing New Nuclear Power Plants  
SECY-02-0179 Final Rule: Material Control and Accounting Amendments 12/03/2002
SECY-02-0176 Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components" (WITS 199900061) 03/28/2003
SECY-02-0175 Denial of Petition for Rulemaking to Eliminate Review of Alternative Sites, Alternative Energy Sources and Need for Power in Nuclear Power Reactor Siting and Licensing Reviews (PRM-52-2) 05/07/2003
SECY-02-0169 Briefing on Decommissioning Activities and Status 10/16/2002
SECY-02-0166 Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues 03/26/2003
SECY-02-0138 Denial of Petition for Rulemaking on Mandatory Submittal of Performance Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) 08/13/2002
SECY-02-0135 Proposed Rule: 10 CFR Parts 63: Specification of a Probability for Unlikely Features, Events, and Processes 09/04/2002
SECY-02-0133 Control of Solid Materials: Options and Recommendations for Proceeding 10/25/2002
SECY-02-0132 Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, " Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) 10/03/2002
SECY-02-0127 Proposed Response to State of Ohio on Its Assured Isolation Storage Facility Draft Rules 09/05/2002
SECY-02-0122 Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership or Control 09/10/2002
SECY-02-0116 Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance Amendments for Materials Licensees 08/27/2002
SECY-02-0112 NRC Review of Idaho National Engineering and Environmental Laboratory Draft Incidental Waste (Waste Incidental to Reprocessing) Determination for Sodium-bearing Waste 07/26/2002
SECY-02-0111 Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5 REM) From a Patient Released Under 10 CFR 35.75 08/27/2002
SECY-02-0107 Addendum to SECY-02-0074: "National Materials Program: Pilot Projects" 08/20/2002
SECY-02-0096 Direct Final Rule on Electronic Maintenance and Submission of Information 07/23/2002
SECY-02-0095 Applicability of Section 11e.(2) of the Atomic Energy Act to Material at the Sequoyah Fuels Corporation Uranium Conversion Facility 07/25/2002
SECY-02-0090 Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear Regulatory Commission Regulation of Nuclear Safety at the U.S. Department of Energy's Non-Defense Science Laboratories 06/28/2002
SECY-02-0089 Revised Draft Nureg-1633 and Public Information Brochure on Potassium Iodide (KI) For the General Public 11/26/2002
SECY-02-0088 Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power Operating Licenses 06/05/2002
SECY-02-0085 Recent Issues with Respect to Decommissioning Funding Assurance that have Arisen as part of License Transfer Applications and other Licensing Requests 01/03/2003
SECY-02-0084 Final Rule on Decommissioning Trust Provisions 11/21/2002
SECY-02-0081 Staff Activities Related to the NRC Goal of Reducing Unnecessary Regulatory Burden on Power Reactor Licensees 06/25/2002
SECY-02-0080 Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) 06/27/2002
SECY-02-0077 Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants" 05/06/2003
SECY-02-0068 Proposed Rule on Financial Information Requirements for Applications to Renew or Extend the Term of an Operating License for a Power Reactor 05/10/2002
SECY-02-0067 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic
ITAAC)
09/11/2002
SECY-02-0060 Proposed Policy on Enhancing Public Participation in NRC Meeting 05/08/2002
SECY-02-0057 Update to Secy-01-0133, "Fourth Status Report on Study of Risk-informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" 03/31/2003
SECY-02-0044 Annual Status Report for FY 2001 on the Administration of the NRC's Requalification Program and the Results of Initial Operator Licensing Examinations (WITS 198800098) 04/03/2002
SECY-02-0043 Proposed Rule: Geological and Seismological Characteristics for the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations and Monitored Retrievable Storage Installations - 10 CFR Part 72 06/18/2002
SECY-02-0033 Amergen's Request to Consolidate the Clinton Power Station Emergency Operations Facility (EOF) into the Centralized EOF Operated by Exelon Generation Co. 03/15/2002
SECY-02-0032 Report to Congress on Abnormal Occurrences for Fiscal Year 2001 03/27/2002
SECY-02-0023A Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort 10/04/2002
SECY-02-0023 Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort 10/04/2002
SECY-02-0021 Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 03/20/2002
SECY-02-0002 Revision of Gaseous Diffusion Plant Recertification Standard Review Plan Chapter on Foreign Ownership and Financial Requirements 02/21/2002

Page Last Reviewed/Updated Friday, March 13, 2020