Part 21 Report - 1997-407
ACCESSION #: 9707150340
Interim Report (97-006)
Subject:
Interim report of evaluation of a deviation pursuant to 10 CFR
21.21(a)(2)
Inadequate Confirmation of 17 x 17 HTC Correlation to 15 x 15 Design
Identification of Basic Activity:
EXEM/PWR ECCS Evaluation Model
Basic Activity Supplied By:
Siemens Power Corporation - Nuclear Division
Nature of Deviation:
SPC did not adequately confirm the conservatism of scaling of the HTCs
from 17 x 17 data to 1505 data. This was a self-discovered item as part
of the LBLOCA assessment arid certain confirmations were performed.
Also, the NRC concluded during NRC Inspection 99900081/97-01 additional
benchmark work should be performed to validate the scaling methodology.
Discovery Date;
May 13, 1997
Corrective Actions to Date:
Nonconformance report (NCR 6160) was prepared and processed by the
management review team as required by SPC-ND's Quality Assurance Manual,
EMF-1. Project definition is proceeding and will be documented as part
of a response to the NRC inspection report.
Evaluation Completion Schedule Date:
September 15, 1997
*** END OF DOCUMENT ***