Part 21 Report - 1997-512

ACCESSION #: 9807150108 DISCLAIMER FOR SCANNED DOCUMENTS THIS ASCII TEXT DOCUMENT WAS PRODUCED FROM A PAPER COPY THAT WAS ELECTRONICALLY SCANNED AND CONVERTED INTO ASCII TEXT FORMAT. SOME TABLES, FIGURES AND MISCELLANEOUS DATA (SUCH AS SCIENTIFIC NOTATIONS/FORMULAS) MAY HAVE BEEN OMITTED DUE TO ASCII TEXT LIMITATIONS. ATTACHMENTS WITHIN CERTAIN DOCUMENTS MAY NOT HAVE BEEN INCLUDED. AN IMAGE OF THE OFFICIAL RECORD COPY OF THIS TEXT FILE DOCUMENT IS AVAILABLE ON NUDOCS MICROFICHE. MGP INSTRUMENTS Suite 150 5000 Highlands Parkway Smyrna, GA 30082 Tel: (770) 432-2744 Fax: (770) 432-9179 July 9, 1998 US NRC Headquarters Operations Center Document Control Desk Nuclear Regulatory Commission Washington DC 20555 Subject: Closure of Corrective Actions relative to: 10 CFR 21 Notification MGP Instruments Inc. Radiation Monitoring System, Power Supply Circuit Boards Premature electronic component failure of component "VD-9" US NRC Ref. Event 32725 Dear Madam or Sir, As a courtesy, MGP Instruments Inc (MGPI) wishes to inform the Commission that the deficiency identified in Event No. 32725, has been corrected by MGP Instruments Inc. Please note: 1. The affected equipment (i.e. Radiation Monitor - Safety Related Local Processing Units) was confirmed to have an impact only at Southern California Edison's, San Onofre site as originally notified. 2. MGPI has verified that all affected equipment (total 28 safety related units) has been reworked and tested at Southern California Edison. 3. Corrective action in the form of design modification has also been completed. Additional information about this issue can be obtained by contacting the undersigned or Mr. David Jarrow MGP Instruments Inc. Quality Assurance Manager at (770) 432-2744, extension 119. Sincerely Yours: Kenneth F. Rosansski Senior Vice President KFR/dj Attachments: cc: Southern California Edison - Mr. Ken Slagle, Manager Nuclear Oversight Division. Southern California Edison - Mr. James K. Huey, Project Manager, RMS Southern California Edison - Mr. Robert Mc Wey Quality Assurance MGP Instruments SA, Lamanon France: J. F Croce Spinelli, F. Chlosta, B. Morel, A. Pommier MGP Instruments Inc. Atlanta: Mr. David Jarrow, Mr. Mike Edelmen, Mr. Sergio Lopez *** END OF DOCUMENT ***

Page Last Reviewed/Updated Tuesday, March 09, 2021