Part 21 Report - 1997-592

ACCESSION #: 9707090142 Illinois Power Company Clinton Power Station P. O. Box 678 Clinton, IL 61727 Tel 217 935-6220 Fax 217 935-4632 ILLINOIS POWER Wayne D. Romberg Assistant Vice President - Vice President An Illinova Company U-602779 4F.140 July 2, 1997 Docket No. 50-461 10CFR21.21 Document Control Desk Nuclear Regulatory Commission Washington, DC 20555 Subject: 10CFR21 Interim Report 21-97-015: Improper Clearance for Westinghouse Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn Contact Dear Madam or Sir: On May 7, 1997, Illinois Power (IP) identified that five arc chutes, manufacturer part number 56F417G02, for Westinghouse model 50DEP350, 1200-amp, 4160-volt circuit breakers, in stores exhibited an inadequate clearance between the rear arc horn and the arc chute molded case. Because of the inadequate clearance, additional force was required on the pole unit to allow the arc chute to attach to the front arc chute support. When attempts were made to install a replacement arc chute in the "N" Residual Heat Removal (RHR) system pump breaker, the pole unit of the circuit breaker seemed to deflect upwards. Attempts were made to install the arc chute on all three phases of the breaker with the same result. A suitable replacement for the RHR pump breaker arc chute was located from a Clinton Power Station spare breaker. This issue has been identified as potentially reportable under the provisions of 10CFR21. IP's evaluation of this condition under 10CFR21 has not yet been completed. Discussions between Clinton Power Station and Westinghouse (Cutler-Hammer) are continuing in an attempt to resolve this issue. IP does not have a firm date for resolving this issue but will provide, as a minimum, an update on the resolution progress by August 29, 1997. U-602779 4F.140 Additional information about this issue may be obtained by contacting D. G. Lukach, Plant Engineering, at (217) 935-8881, extension 3952. Sincerely yours, Wayne D. Romberg Assistant Vice President RSF/krk cc: NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety INPO Records Center Westinghouse (Cutler-Hammer) *** END OF DOCUMENT ***

Page Last Reviewed/Updated Tuesday, March 09, 2021