Part 21 Report - 1997-592
ACCESSION #: 9707090142
Illinois Power Company
Clinton Power Station
P. O. Box 678
Clinton, IL 61727
Tel 217 935-6220
Fax 217 935-4632
ILLINOIS
POWER Wayne D. Romberg
Assistant Vice President - Vice President
An Illinova Company
U-602779
4F.140
July 2, 1997
Docket No. 50-461 10CFR21.21
Document Control Desk
Nuclear Regulatory Commission
Washington, DC 20555
Subject: 10CFR21 Interim Report 21-97-015: Improper
Clearance for Westinghouse Model 50DHP350
Circuit Breaker Arc Chute Rear Arc Horn Contact
Dear Madam or Sir:
On May 7, 1997, Illinois Power (IP) identified that five arc chutes,
manufacturer part number 56F417G02, for Westinghouse model 50DEP350,
1200-amp, 4160-volt circuit breakers, in stores exhibited an inadequate
clearance between the rear arc horn and the arc chute molded case.
Because of the inadequate clearance, additional force was required on the
pole unit to allow the arc chute to attach to the front arc chute
support. When attempts were made to install a replacement arc chute in
the "N" Residual Heat Removal (RHR) system pump breaker, the pole unit of
the circuit breaker seemed to deflect upwards. Attempts were made to
install the arc chute on all three phases of the breaker with the same
result. A suitable replacement for the RHR pump breaker arc chute was
located from a Clinton Power Station spare breaker.
This issue has been identified as potentially reportable under the
provisions of 10CFR21. IP's evaluation of this condition under 10CFR21
has not yet been completed. Discussions between Clinton Power Station
and Westinghouse (Cutler-Hammer) are continuing in an attempt to resolve
this issue. IP does not have a firm date for resolving this issue but
will provide, as a minimum, an update on the resolution progress by
August 29, 1997.
U-602779
4F.140
Additional information about this issue may be obtained by
contacting D. G. Lukach, Plant Engineering, at (217) 935-8881, extension
3952.
Sincerely yours,
Wayne D. Romberg
Assistant Vice President
RSF/krk
cc: NRC Clinton Licensing Project Manager
NRC Resident Office, V-690
Regional Administrator, Region III, USNRC
Illinois Department of Nuclear Safety
INPO Records Center
Westinghouse (Cutler-Hammer)
*** END OF DOCUMENT ***