Part 21 Report - 1997-700

ACCESSION #: 9709180054 SIEMENS September 11, 1997 HDC:97:098 Document Control Desk ATTN: Chief, Planning, Program and Management Support Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Interim Report of Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) Ref.: 1. Letter, H. Donald Curet (SPC) to Document Control Desk, "Interim Report of Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2)," July 11, 1997. The following two interim reports were provided to the NRC by the reference letter pursuant to the requirements of 10 CFR 21 to submit an interim report on issues that will not be completed within 60 days of discovery: 97-006 "Inadequate Confirmation of 17x17 HTC Correlation to 15x15 Design," and 97-008 "Inadequate Documentation Associated with 17x17 HTC Data Reduction Code (XRAD)." The evaluations related to these two interim reports have been completed and neither evaluation resulted in a 10 CFR 21 reportable defect. Very truly yours, H. Donald Curet, Manager Product Licensing /smg cc: E. Y. Wang (USNRC) Project No. 702 Siemens Power Corporation Nuclear Division 2101 Horn Rapids Road Engineering & Manufacturing P.O. Box 130 Richland, WA 99352-0130 Tel: (509) 375-8100 Fax: (609) 375-8402 *** END OF DOCUMENT ***

Page Last Reviewed/Updated Tuesday, March 09, 2021