Part 21 Report - 1997-771

ACCESSION #: 9710170102 DuBose National Energy Services, Inc. October 15, 1997 Attn: NRC Operations Center Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555 Subject: Potential 10 CFR 21 Dear Sir; This letter is to inform you of a potential safety hazard for some 3/4 Sch 40 pipe shipped to two or our customers, Carolina Power & Light and Virginia Power Corp. This material has been found, to have areas where the wall thickness falls below the minimum allowed by the SA 312 specification. When the material was cut by Virginia Power Corp at their North Anna site this condition was found. The minimum wall thickness of .099 had been violated. Some of the readings were as low as .087. A sample of this material has been returned to Sandvik Steel, the producer, in Scranton, PA, for evaluation. The orders were for 3/4, schedule 40, Pipe SA 312, type 304. Carolina Power & Light, PO #8N7398CJ had one piece 23' 11" and PO #8P8410CJ had 2 pieces totaling 46' 11", all of this material came from heat 946989. The Virginia Power Corp orders were #CNT-552587, CNT-55-601 1, & CNT- 558917 for one piece each of 3/4 schedule 40 Pipe, SA 312, type 304. Each piece was 22' to 23' 6" random length from heat #46989. (910) 590-2151 o 1-800-590-2150 o FAX (910) 590-3555 P.O. Box 499 a Clinton, NC 28328 Each of these customer has been notified and we will notify them of any information received from the producer of the pipe, when it is available. If I can be of any further assistance you may contact me at 1-800-590- 2150. Sincerely, James N. Dailey QA Manager copy: Carl Rogers, President VP Sales Sales Manager GENERAL INFORMATION or OTHER EVENT NUMBER: 33088 LICENSEE: DUBOSE NATIONAL ENERGY NOTIFICATION DATE: 10/15/97 SERVICE INC CITY: CLINTON REGION: 2 NOTIFICATION TIME: 15:06 [ET] COUNTY: STATE: NC EVENT DATE: 10/15/97 LICENSE#: AGREEMENT: Y EVENT TIME: 00:00[EDT] DOCKET: LAST UPDATE DATE: 10/15/97 NOTIFICATIONS THOMAS PEEBLES RDO NRC NOTIFIED BY: DAILEY(FAX) VERN HODGE NRR HQ OPS OFFICER: CHAUNCEY GOULD EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH EVENT TEXT DUBOSE NATIONAL ENERGY SERVICES INC SUBMITTED A POTENTIAL PART 21 REPORT. THE "DEFECT" IN QUESTION IS SOME 3/4" SCH 40 PIPING WHICH MAY HAVE WALL THICKNESS AS LOW AS .087" WHEN THE MINIMUM ALLOWED BY SA 312 SPECIFICATIONS IS .099". THIS PIPING WAS SHIPPED TO CAROLINA POWER & LIGHT AND VIRGINIA POWER AND THE NORTH ANNA SITE DISCOVERED THIS CONDITION. THEY HAVE RETURNED A SAMPLE OF MATERIAL TO THE PRODUCER, SANDVIK STEEL, FOR EVALUATION. BOTH SHIPMENTS OF PIPING TO THE TWO CUSTOMERS HAD THE SAME HEAT #46989. THE CUSTOMERS HAVE BEEN NOTIFIED. *** END OF DOCUMENT ***

Page Last Reviewed/Updated Tuesday, March 09, 2021