Part 21 Report - 1998-103
#33536
CITRS Event Detail Report
Source | CITAS # | Occurance Date | Operatibility | Location | Methode Code | Priority | Reportable | Originator | System | K2MIS # |
SOR | 98-E00356 | 1/14/98 4:54:00 PM | | CB | NO | | NO | Santini, Philip | 480V | |
Event Description:
January 14, 1998
Indiana Point Unit No.2
Docket No. 50-247
Part 21 Notification - Westinghouse Breaker Overhaul Work
This report is being made per 10CFR21(d) (3)(i), Reporting of Defects and Noncompliance.
During performance of a comprehensive investigation of Westinghouse supplied DB-50 breakers, it was determined that low trip bar forces, and winding of the trip pan spring contributed to breaker miss-operation which might have resulted in the breakers malfunctioning when called upon to perform their safety related function. These breaker anomalies were previously reported to the NRC order LER 97-024.
Immediate Actions:
Assignor | Assignee | Assignment | Status | Due Date | Last Updated | Action |
Santini, Philip | DMRG, Daily Mgm Review Grp | Review Event | New | 1/21/98 | 1/14/98 | |
Event Summary: | |
Root Cause: | |
Santini, Philip | SWS, Shift Watch Sup. | Review Event | New | 1/14/98 | 1/14/98 |
Event Summary: | | | | | |
Root Cause: | | | | | |
Santini, Philip | WE, Watch Fag. | Review Event | New | 1/14/98 | 1/14/98 |
Event Summary: | | | | | |
Root Cause: | | | | | |
Westinghouse Repair and Replacement Services
2000 Cheswick Ave
Cheswick, PA
Page Last Reviewed/Updated Tuesday, March 09, 2021