Part 21 Report - 1998-132
ACCESSION #: 9801290049
The Boeing Company
P.O. Box 3707
Seattle, WA 98124-2207
BOEING
January 22, 1998
G-1151-SJA-98-049
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R.
S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.
J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
Very truly yours,
Sandra J. Andrews
Nuclear Administrator
Phone: (425) 865-6248
FAX: (425) 865-4851
Mail Stop: 7A-33, or
e-mail: Sandra.J.Andrews@Boeing.com
Enclosure(s): GTSTRUDL Program Report Form 98.01
Georgia Institute
of Technology GT STRUDL [Registered Trademark]
January 15, 1998
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O. Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 98.01, and a
GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the
GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the
GTSTRUDL Program Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
David C. Key
Configuration Control Manager
Enclosures
Computer Aided Structural Engineering Center Phone: (404) 894-2260
School of Civil & Environmental Engineering Fax: (404) 894-8014
Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu
A Unit of the University System of Georgia
GTSTRUDL Program Report Form
GPRF No.: 98.01
DATE:
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
X URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
_ SERIOUS Problem results in incorrect answers which are
obvious or problem prevents completion of a
particular user's task.
_ MINOR Problem can be worked around or problem poses high
frustration factor.
_ INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed January 12, 1998
Date Notification Sent
Computers PC (DOS,NT,95), VAX,SUN,HP,RS
Operating System see "Computers" above
Version 93.01, 94.01, 96.01, 97.01
Target Release for Correction 1998.2
Mgr. ASD
Signature Title
R & D Division
Michael H. Swanger
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.:
DATE:
DESCRIPTION:
The COMPUTE GROSS RESULTS command will abort if joint displacements
have not been previously computed by the COMPUTE ALL DISPLACEMENTS
command. This will occur in the offshore analysis and design pile-
structure interaction analysis if the super element used to create the
stiffness matrix at the pile-structure boundary joints does not contain
all the active members in the structure. The super element must contain
all active members/elements in the structure and the set of active
members/elements may not be changed prior to giving the COMPUTE GROSS
RESULTS command subsequent to the pile analysis.
GTSTRUDL User Reference Manual Sections:
ACTIVE/INACTIVE Structure Specification Section 2.1.3.4, Volume 1,
Rev. D
The Split Solver Commands for Static Section 2.1.13.3, Volume 1,
Analysis Rev. P
Guidelines for Pile-Structure Analysis Section 6.7, Volume 8, Rev.
M
Rev. 2.2
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Tuesday, March 09, 2021