Part 21 Report - 1998-139
ACCESSION #: 9808100315
Shared Services Group
P.O. Box 3707
Seattle, WA 98124-2207
BOEING
July 30, 1998
G-1151-SJA-98-385
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S.
Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L. J.
Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
Very truly yours,
Sandra J. Andrews
Nuclear Administrator
Phone: (425) 865-6248
FAX: (425) 865-4851
Mail Stop: 7A-33, or
e-mail: Sandra.J.Andrews@Boeing.com
Enclosure(s):
Georgia Institute
of Technology GT STRUDL [Registered Trademark]
July 23, 1998
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O. Box 24346, MS 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 98.10, 98.11,
98.12, and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and
return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt
of the GTSTRUDL Program Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
David C. Key
Configuration Control Manager
Enclosures
Computer Aided Structural Engineering Center Phone: (404) 894-2260
School of Civil & Environmental Engineering Fax: (404) 894-8014
Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu
A Unit of the University System of Georgia
GTSTRUDL Program Report Form
GPRF No.:
DATE:
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
X URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
SERIOUS Problem results in incorrect answers which are obvious
or problem prevents completion of a particular user's
task.
MINOR Problem can be worked around or problem poses high
frustration factor.
INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed
Date Notification Sent
Computers
Operating System
Version
Target Release for Correction
Signature Title
R & D Division
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.:
DATE:
DESCRIPTION:
Under certain circumstances, TYPE STRUCTURAL WALL design can "freeze"
GTSTRUDL during a PROPORTION command. A non-terminating iteration is
entered and the user must halt (abort) the execution of GTSTRUDL and all
data is lost.
There is no work-around, but this problem is rare, with one reported
instance.
Relevant documentation:
Section 4.2 The DESIGN DATA Command, Volume 4,
GTSTRUDL Reference Guide
Section 4.3 The PROPORTION MEMBERS Command, Volume 4,
GTSTRUDL Reference Guide
Rev 2.2
GTSTRUDL Program Report Form
GPRF No.:
DATE:
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
X URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
SERIOUS Problem results in incorrect answers which are obvious
or problem prevents completion of a particular user's
task.
MINOR Problem can be worked around or problem poses high
frustration factor.
INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed
Date Notification Sent
Computers ALL
Operating System ALL
Version 9601,9701,9801
Target Release for Correction 9802
Director, R&D
Signature Title
R & D Division
Kenneth Will
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.:
DATE:
DESCRIPTION:
When performing an elastic buckling analysis (PERFORM BUCKLING ANALYSIS
command) with more than five active loadings, a value of 0.0 will be output
for the Buckling Multiplier for the loads beyond the first five active
loadings or an abort may occur.
Workaround:
Peform the buckling analysis for only five active loadings in each
execution. Do not use the Load List command due to GPRF 93.25 still being
open.
Applicable Sections of the Users Manual Documentation:
Perform Buckling Analysis - Section 2.8, Volume 3, GTSTRUDL Users Manual
GTSTRUDL Program Report Form
GPRF No.: 98.
DATE:
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
x URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
SERIOUS Problem results in incorrect answers which are obvious
or problem prevents completion of a particular user's
task.
MINOR Problem can be worked around or problem poses high
frustration factor.
INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed July 21, 1998
Date Notification Sent
Computers PC, SPARC
Operating System All
Versions: SPARC: 9601; PC: 9601 and later
Target Release for Correction: 99.01
Mgr. ASD
Signature Title
R & D Division
Michael H. Swanger
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.: 98.
DATE:
DESCRIPTION:
The scope environment OVERLAY DIAGRAM/ENVELOPE command may abort if
the active loading conditions contain no member loads. A workaround is to
explicitly specify the number of sections using the SECTION command prior
to entering the scope environment and performing the OVERLAY operation. An
example of the SECTION command is given as follows:
SECTION FR DS 0.0 0.05 $ Produces 21 sections.
GTSTRUDL User Reference Manual Sections:
The Scope Environment OVERLAY
Command Sections 2.7.6.7, Volume 3,
GTSTRUDL Reference Manual.
Internal Member Results Output -
The SECTION Command Section 2.1.14.5, Volume 1,
GTSTRUDL Reference Manual.
Rev. 2.2
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Tuesday, March 09, 2021