Part 21 Report - 1998-140

LICENSEE: ILLINOIS POWER CO. SITE: CLINTON 1 EN NUMBER:33618 DOCKET: 05000461 EVENT DATE: 01-28-98 RX TYPE: BWR EVENT TIME: 00:00 VENDORS: GE-6 NOTIFY DATE: 01-28-98 EMERGENCY CLASS: N/A REGION: 3 STATE: IL TIME: 18:08 OPS OFFICER: BOB STRANSKY 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH UNIT SCRAM RX INIT INITIAL MODE CURR CURRENT MODE CODE CRIT PWR PWR 1 N N 0 COLD SHUTDOWN 0 COLD SHUTDOWN 10 CFR PART 21 REPORT - DEVIATIONS IN SAFETY RELATED BATTERY CHARGERS THE LICENSEE HAS IDENTIFIED SEVERAL DEVIATIONS IN POWER CONVERSION PRODUCTS, INC. MODEL 3SC-130-130 BATTERY CHARGERS USED IN SAFETY-RELATED APPLICATIONS. THESE DEVIATIONS INCLUDE INADEQUATE SOLDER CONNECTIONS AND INCORRECT TIME DELAY ON A HIGH VOLTAGE ALARM (DSHV) CIRCUIT CARD. IN ADDITION, AN INCORRECT DSHV RESET VOLTAGE SETPOINT WAS SPECIFIED BY SARGENT AND LUNDY.

Page Last Reviewed/Updated Tuesday, March 09, 2021