Part 21 Report - 1998-510

LICENSEE: INGERSOLL-DRESSER PUMP COMPANY SITE: INGERSOLL-DRESSER PUMP COMPANY EN NUMBER:34499 DOCKET: EVENT DATE: 07-09-98 RX TYPE: EVENT TIME: 00:00 VENDORS: NOTIFY DATE: 07-09-98 EMERGENCY CLASS: N/A REGION: 1 STATE: NJ TIME: 16:01 OPS OFFICER: CHAUNCEY GOULD 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH THE INGERSOLL-DRESSER PUMP COMPANY SUBMITTED A PART 21 REPORT ON A POTENTIAL SAFETY HAZARD FROM THE POTENTIAL BREAKAGE OF THE CAST IRON SUCTION HEADS ON ONE OF THEIR PUMPS. THE PUMPS IN QUESTION ARE OF THE MODEL APKD, WHICH WERE MANUFACTURED BY INGERSOLL-RAND COMPANY IN THE MID 1970's. THESE PUMPS ARE INSTALLED AT SEVEN DIFFERENT NUCLEAR SITES(SIX DOMESTIC AND ONE FOREIGN). THE SIX DOMESTIC FACILITIES ARE LIMERICK, HOPE CREEK, SUSQUEHANNA, HATCH, LASALLE AND WNP2. THE FOREIGN FACILITY IS THE CHINSHAN FACILITY IN TAIWAN. THIS CONDITION WAS DISCOVERED AFTER A FAILURE OF THE SUCTION HEAD ON THE "1B" RHR PUMP HAD OCCURRED AT THE LIMERICK UNIT 1 PLANT. IT WAS INITIALLY NOTED ON 5/98 WHEN A PIECE OF METAL FOUND INSIDE THE REACTOR VESSEL WAS TRACED TO THE "1B" RHR PUMP. A VISUAL INSPECTION(BOROSCOPE) REVEALED THAT A PORTION OF THE SUCTION HEAD WAS MISSING. THESE PUMPS HAVE BEEN USED IN RHR, CORE SPRAY, LOW PRESSURE CORE SPRAY AND HIGH PRESSURE CORE SPRAY APPLICATIONS AT THE VARIOUS SITES WHERE THEY ARE INSTALLED.

Page Last Reviewed/Updated Tuesday, March 09, 2021