Part 21 Report - 1999-014
ACCESSION #: 9903260150
Shared Services Group
P.O. Box 3707
Seattle, WA 98124 2207
March 15, 1999
G-1151-SJA-98-137
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: | a) | Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R.S. Orr to the NRC Operations Center |
| b) | NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry |
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
| Very truly yours, Sandra J. Andrews Nuclear Administrator Phone: (425) 865-6248 FAX: (425) 865-4851 Mail Stop: 7A-33, or e-mail: Sandra.J.Andrews@Boeing.com |
Enclosure(s): GTSTRUDL Program Report Form 99.05
Georgia Institute of Technology | GTSTRUDL**[Registered Trademark] |
March 8, 1999
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O.Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 99.05, and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program Report.
Thank you for reviewing the Program Report and for returning the Acknowledgement Form .
| Best regards, CASE Center David C. Key Configuration Control Manager |
Enclosures
Computer Aided Structural Engineering Center | Phone: (404) 894-2260 |
School of Civil & Environmental Engineering | Fax: (404) 894-8014 |
Atlanta Georgia 30332-0355 USA | casec@ce.gatech.edu |
A Unit of the University System
GTSTRUDL Program Report Form
GPRF No.: 99.05
| DATE: |
FROM: | Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 |
| |
SEVERITY LEVEL: | |
x | URGENT | Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. |
| SERIOUS | Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. |
| MINOR | Problem can be worked around or problem poses high frustration factor. |
| INFORMATIVE | Documentation error, program usage tip, user inconveniences. |
| |
Date Problem Confirmed | March 3, 1999 |
Date Notification Sent | |
Computers | All |
Operating System | All |
Versions: | 91.01 and later |
Target Release for Correction: | 99.01 |
| |
| Mgr. ASD |
Signature | Title |
| |
R&D Division | |
Michael H. Swanger | |
Typed or Printed Name | Date of Signature |
| |
Signature | Title |
| |
Professional Services Division | |
| |
Typed or Printed Name | Date of Signature |
| |
Rev. 2.2
GTSTRUDL Program Report Form(Continued)
GPRF No.: 99.05
DESCRIPTION:
The offshore module fatigue analysis COMPUTE FATIGUE commands cannot be executed following an offshore module pile-structure interaction analysis. This essentially prevents the use of the jacket superstructure member forces computed by the pile-structure interaction analysis from being used in a subsequent fatigue analysis. There is no work-around for this problem.
Applicable Reference Manual Sections
1. | Fatigue Analysis of Simple Tubular Joints | Section 5.0, Volume 8, GTSTRUDL Reference Manual |
2. | Pile Structure Interaction Analysis | Section 6.0, Volume 8, GTSTRUDL Reference Manual |
Rev. 2.2
*** END OF DOCUMENT ***