Part 21 Report - 1999-015
ACCESSION #: 9903290115
Shared Services Group
P.O. Box 370
Seattle, WA 98124-2207
BOEING
March 19, 1999
G-1151-SJA-98-154
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: | a) | Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S. Orr to the NRC Operations Center |
| b) | NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry |
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
| Very truly yours, Sandra J. Andrews Nuclear Administrator Phone: (425) 865-6248 FAX: (425) 865-4851 Mail Stop: 7A-33, or e-mail: Sandra.J.Andrews@Boeing.com |
Enclosure(s): GTSTRUDL Program Report Form 99.06
Georgia Institute of Technology
GT STRUDL [Registered Trademark]
March 15, 1999
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O. Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 99.06, and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program Report.
Thank you for reviewing the Program Report and for returning the Acknowledgement Form.
| Best regards, CASE Center David C. Key Configuration Control Manager |
Enclosures
Computer Aided Structural Engineering Center | Phone: (404) 894-2260 |
School of Civil & Environmental Engineering | Fax: (404) 894-8014 |
Atlanta, Georgia 30332-0355 USA | casec@ce.gatech.edu |
A Unit of the University System of Georgia
GTSTRUDL Program Report Form
GPRF No.: 99-06
DATE:
FROM: | Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 |
SEVERITY LEVEL: | |
| |
x | URGENT | Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. |
| SERIOUS | Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. |
| MINOR | Problem can be worked around or problem poses high frustration factor. |
| INFORMATIVE | Documentation error, program usage tip, user inconveniences. |
Date Problem Confirmed March 9, 1999 |
Date Notification Sent |
Computers All |
Operating System All |
Versions: 91.01 and later |
Target Release for Correction: 99.01 |
| Mgr. ASD |
| |
Signature | Title |
R & D Division Michael H. Swanger | |
| |
Typed or Printed Name | Date of Signature |
Signature | Title |
Professional Services Division | |
Typed or Printed Name | Date of Signature |
Rev. 2.2
GTSTRUDL Program Report Form(Continued)
GPRF No.: 99.05
DATE:
DESCRIPTION:
The PRINT FATIGUE MEMBER DATA command of the offshore fatigue analysis module produces incorrect stress computation position data. Units conversion is incorrectly applied to this non-dimensional data for output purposes. This error does not affect fatigue analysis results. A workaround to this problem is to give a UNITS INCHES command prior to giving the PRINT FATIGUE MEMBER DATA command. This produces the correct non-dimensional values for the printed stress computation position data.
Applicable Reference Manual Sections
1. PRINT FATIGUE Command | Section 5.7.1. Volume 8. GTSTRUDL Reference Manual |
Rev. 2.2
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Tuesday, March 09, 2021