Part 21 Report - 1999-161
ACCESSION #: 9903120178
Coltec Industries | Fairbanks Morse Engine Division 701 White Avenue Beloit, WI 53511-5492 www.fairbanksmorse.com 608/364-4411 Fax: 6081364-0382 |
March 8, 1999
Document Control Desk | U.S. Nuclear Regulatory Commission Washington, DC 20555 | File No. 99-002 |
Subject: ALCO Air and Exhaust Valve Cam Rollers
On February 9, 1999, Coltec Industries, Fairbanks Morse Engine Division (FMED), became aware of a potential safety hazard associated with the air and exhaust valve cam rollers Catalog number 2241342 for FM-ALCO 251 engines. FMED had supplied the suspect rollers in six fuel pump support kits Catalog number 2500605 to Consolidated Edison - Indian Point 2 nuclear power station on November 14, 1997. Based on a review of FMED records, Consolidated Edison is the only nuclear utility that is impacted.
Engineering and Quality Assurance determined the cause to be improper heat treatment of the cam rollers, which results in premature wear of the roller and possible damage to the camshaft lobe, roller pin, and push rod. FM-ALCO specifications require the rollers to be carburized, to ensure adequate case depth hardness and surface hardness. However, the suspect rollers were induction hardened, which resulted in inadequate case depth hardness and surface hardness. FMED Receiving Supervisor failed to note the improper heat treatment process upon review of the certifications from the supplier of the cam rollers. In addition, the commercial grade dedication process for the cam rollers used non- conservative tolerances for the surface hardness of the rollers.
FMED has taken corrective action to prevent recurrence by retraining the Receiving Supervisor and the engineering personnel who develop the dedication processes. In addition, the tolerance used during the dedication process for the cam rollers has been changed. Other tolerances will be reviewed as parts are dedicated.
It should be noted that FMED has not be notified, nor is aware of any air and exhaust valve cam roller failures that have occurred at any nuclear facilities. The failures that have occurred have been in commercial applications after approximately 200 hours of operation.
| Sincerely, James C. Golding Senior Quality Assurance Engineer |
Cc: | Terry Gill |
Mary Armfield |
Ted Stevenson |
Greg Gutoski |
Mario Lavin |
A division of Coltec Industries Inc.
03/08/1999
U.S. Nuclear Regulatory Commission Operations Center Event Report | Page 1 |
| |
General Information or Other (PAR) | Event# 35448 |
| |
Rep Org: | FAIRBANKS MORSE ENGINE DIVISION |
Supplier: | FAIRBANKS MORSE ENGINE DIVISION |
Notification Date / Time: | 03/0811999 15:29 (EST) |
Event Date / Time: | 03/08/1999 14:20 (CST) |
Last Modification: | 03/08/1999 |
| |
Region: 3 | Docket #: |
City: BELOIT | Agreement State: No |
County: | License #: |
State: WI | |
| |
NRC Notified by: | Notifications: RONALD GARDNER R3 |
| |
HQ Ops Officer: FANGIE JONES | VERN HODGE (FAX) NRR |
| |
Emergency Class: NON EMERGENCY | |
| |
10 CFR Section: | 21.21 UNSPECIFIED PARAGRAPH |
| 10 CFR PART 21 REPORT REGARDING IMPROPER HEAT TREATMENT TO CAM ROLLERS |
On February 9, 1999, Coltec Industries, Fairbanks Morse Engine Division (FMED), became aware of a potential safety hazard associated with the air and exhaust valve cam rollers for FM-ALCO 251 engines. Final analysis was completed on March 8, 1999 by Engineering and Quality Assurance. They determined the cause to be improper heat treatment of the cam rollers, which results in premature wear of the roller and possible damage to the camshaft lobe, roller pin, and push rod. The suspect rollers were induction hardened, which resulted in inadequate case depth hardness and surface hardness.
FMED had supplied the suspect rollers to Consolidated Edison Indian Point 2 nuclear power station on November 14, 1997. Based on a review of FMED records, Consolidated Edison is the only nuclear utility that is impacted.
FMED has taken corrective action-to prevent reoccurrence. In addition, the tolerance used during the dedication process for the cam rollers has been changed. Other tolerances will be reviewed as parts are dedicated.
It should be noted that FMED has not been notified, nor is it aware of any air and exhaust valve cam roller failures that have occurred at any nuclear facilities. The failures that have occurred have been in commercial applications after approximately 200 hours of operation.
*** END OF DOCUMENT ***