Part 21 Report - 1999-260
LICENSEE: |
SOUTHERN CALIFORNIA EDISON & SAN DI |
SITE: SAN ONOFRE 2 3 |
|
EN NUMBER:35685 |
|
DOCKET: 05000362 |
|
EVENT DATE: 05-05-99 |
|
RX TYPE: PWR PWR |
|
EVENT TIME: |
|
VENDORS: CE CE |
|
NOTIFY DATE: 05-06-99 |
|
EMERGENCY CLASS: N/A |
REGION: 4 |
STATE: CA |
TIME: 15:12 |
OPS OFFICER: CHAUNCEY GOULD |
|
|
|
10 CFR SECTION: CCCC UNSPECIFIED PARAGRAPH |
UNIT |
SCRAM
CODE |
RX
CRIT |
INIT
PWR |
INITIAL
MODE |
CURR
PWR |
CURRENT
MODE |
2 |
N |
Y |
100 |
Power Operation |
100 |
Power Operation |
3 |
N |
N |
0 |
Hot Shutdown |
0 |
Hot Shutdown |
THE LICENSEE HAS DETERMINED THAT A MANUFACTURING DEFECT IS PRESENT ON SOME OF THE POTTER AND BRUMFIELD (P&B) RELAYS THEY HAVE AT THE SITE.
SIXTEEN P&B RELAYS, MODEL KUP93-14A32-120, WERE SUPPLIED IN LOT #913501 BY THE VENDOR AS COMMERCIAL GRADE ITEMS AND WERE DEDICATED FOR NUCLEAR SERVICE AT SAN ONOFRE. THE LICENSEE'S LAB ANALYSIS OF FOUR OF THESE RELAYS DETERMINED THE CONTACT PADS WERE INSUFFICIENTLY WELDED TO THEIR CONTACT ARMS AND COULD BECOME DETACHED. BASED ON THEIR REVIEW OF RELAY FAILURE HISTORY, THE LICENSEE CONCLUDED THE INSUFFICIENT CONTACT PAD WELDING IS LIMITED TO LOT #913501.
THESE RELAYS HAVE BEEN REPLACED WITH NEW P&B RELAYS WHICH HAVE THE CONTACT PADS RIVETED TO THEIR CONTACT ARM, THUS PRECLUDING ANY CONTACT DETACHMENT.