Part 21 Report - 2001-233
Power Reactor |
|
Event Number: |
38119 |
FACILITY: FERMI |
REGION: 3 |
NOTIFICATION DATE: |
07/05/2001 |
UNIT: [ 2 ] [ ] [ ] |
STATE: MI |
NOTIFICATION TIME: |
16:03[EDT] |
RXTYPE: [2] GE-4 |
|
EVENT DATE: |
07/05/2001 |
|
|
EVENT TIME: |
10:00[EDT] |
NRC NOTIFIED BY: |
COSEI |
LAST UPDATE DATE: |
07/05/2001 |
HQ OPS OFFICER: |
CHAUNCEY GOULD |
|
|
|
|
PERSON |
ORGANIZATION |
EMERGENCY CLASS: |
NON EMERGENCY |
ROGER LANKSBURY |
R3 |
10 CFR SECTION: |
|
|
|
|AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD |
|
|
|
|
|
|
|
|
|
UNIT |
SCRAM CODE |
RX CRIT |
INIT PWR |
INIT RX MODE |
CURR PWR |
CURR RX MODE |
2 |
N |
Y |
100 |
Power Operation |
100 |
Power Operation |
EVENT TEXT
|
NON-CONSERVATIVE ANALYSIS FOR OPRM SCRAM SETPOINTS
On July 5, 2001, Detroit Edison received confirmation from General Electric of a non-conservative analysis that supports Operation Power Range Monitor (OPRM) scram setpoints. The non-conservative analysis is generic and been determined to affect Fermi 2. The OPRM had been conservatively declared inoperable on June 27, 2001, at 1333 hours as a result of preliminary notification by General Electric.
The consequences of the non-conservative analysis are that the associated OPRM Reactor Protective System (RPS) scram setpoints are non-conservative. The non-conservative RPS setpoints may result in violating the Minimum Critical Power Ratio (MCPR) safety limit during a thermal-hydraulic instability.
All OPRM channels have been declared inoperable. Technical Specification 3.3.1.1 Action J requires an alternate method of detecting and suppressing thermal-hydraulic instabilities to be implemented within 12 hours. Alternate methods have been established, thus, the Technical Specification required action is satisfied. Fermi 2 has 120 days to restore the OPRMs to an operable condition.
This initial report is being made in accordance with 10CFR50.72 (B)(3)(V)(A) as a condition that could have prevented the fulfillment of the safety function of a system needed to shutdown the reactor.
See EN #38104, GE Nuclear Energy 10CFR21 report.
The NRC Resident Inspector will be notified.