Part 21 Report - 2001-240

 

 




        ENTERGY
Entergy Nuclear Northeast
Entergy Nuclear Operations, Inc.
Indian Point 3 NPP
P.O. Box 308
Buchanan. NY 10511
Tel 914 736 8001 Fax 736 8012

 


    Robert J. Barrett
Vice President, Operations-IP3

July 9, 2001
IPN-01-052

U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk
Mail Stop O-P1-17
Washington, DC 20555-0001

SUBJECT: Indian Point 3 Nuclear Power Plant
Docket No.50-286
License No. DPR-64
0 CFR 21 Interim Report
Failure During Post Installation Testing of Replacement Governor Manufactured by Woodward Governor
and Refurbished by Engine Systems, Inc.

Dear Sir:

The attached Interim Report is being submitted in accordance with 10 CFR 21 (a)(2) to address a potentially reportable equipment failure. A replacement governor installed on the 32 Emergency Diesel Generator failed during post installation testing. The governor has been returned to Engine Systems Inc. for failure analysis to determine if there is a deviation that would make the failure a reportable defect.

Indian Point 3 is not making any new commitments associated with this letter. If you have any questions regarding this submittal, please contact Mr. J. Donnelly.

Very truly yours,

Robert J. Barrett
Vice President Operations
Indian Point 3 Nuclear Plant

cc: see next page

Attachment

Page Last Reviewed/Updated Tuesday, March 09, 2021