Log No |
Notifier |
Description |
Report Date |
Event No. / Accession No. |
2012-60-00 |
Canberra Industries, Inc. |
Model GP 100C Gamma Probe Failed to Comply with Certain PSEG Specifications |
12/10/2012 |
ML12363A047 |
2012-59-01 |
Tennessee Valley Authority |
Belden Wire used on Environmentally Qualified Form-Wound Motors Not Fully Qualified |
01/18/2013 |
ML13029A498 |
2012-59-00 |
Tennessee Valley Authority |
Belden Wire used on Environmentally Qualified Form-Wound Motors Not Fully Qualified |
12/21/2012 |
ML13002A029 |
2012-58-00 |
ABB Inc. |
Defect discovered in COM-5 and SSC-T Protective Relays Distributed by ABB INC. |
12/21/2012 |
ML13002A470 |
2012-57-00 |
Emerson Process Management |
Fisher Controls Report Involving Performance of NPT Stamped Cavitrol III Plugs at Catawba Nuclear Station |
11/27/2012 |
ML12356A302 |
2012-56-01 |
CB&I AREVA MOX Services |
Nonconforming Welds on a Pellet Handling Transfer Glovebox (Updated) |
01/07/2016 |
ML16007A113 |
2012-56-00 |
Shaw AREVA MOX Services |
Nonconforming Welds on a Pellet Handling Transfer Glovebox |
12/14/2012 |
ML12353A146 |
2012-55-01 |
GE Hitachi Nuclear Energy |
Updated Report - Adequacy of Design Change in AM Magne-Blast Circuit Breakers |
06/12/2013 |
ML13163A220 |
2012-55-00 |
GE Hitachi Nuclear Energy |
Adequacy of Design Change in AM Magne-Blast Circuit Breakers (Interim Report) |
12/13/2012 |
ML12348A136 |
2012-54-01 |
Emerson Process Management |
Fisher HPD Valve Assemblies with TopWorx Proximity Switch Brackets Installed Upside Down (Update) |
04/30/2013 |
ML13122A127 |
2012-54-00 |
Emerson Process Management |
Fisher HPD Valve Assemblies with TopWorx Proximity Switch Brackets Installed Upside Down |
12/06/2012 |
ML12346A300 |
2012-53-00 |
Engine Systems, Inc. |
Refurbished Emergency Diesel Generator Cylinder Head With Foreign Material in Intake Port. |
12/06/2012 |
ML12342A373 |
2012-52-00 |
Flowserve |
Linear Indications on Pressure Reducing Balancing Sleeve (Interim Report) |
11/12/2012 |
ML12319A475 |
2012-51-01 |
Palo Verde |
Palo Verde Units 1, 2, and 3 - Closure of Part 21 Interim Report for Flowserve Four Inch Regulating Valve |
07/26/2013 |
ML13213A283 |
2012-51-00 |
Palo Verde |
Interim Report for Flowserve Four Inch Regulating Valve |
11/09/2012 |
ML12319A473 |
2012-50-00 |
Scientech |
Potential Grounding Pathway Between Heat Sink and Chassis of CMM830 and TMD830 Control Modules |
11/08/2012 |
ML12318A040 |
2012-49-00 |
ABB Inc |
K-Line Circuit Breaker Operating Mechanism Front Cover Fails to Comply with Specifications |
11/08/2012 |
ML12318A039 |
2012-48-00 |
Fisher Controls International |
Commercial Grade Dedication Not Properly Applied to Type 9200 Butterfly Valves |
11/07/2012 |
ML12318A041 |
2012-47-00 |
Fairbanks Morse Engine |
Fairbanks Morse Opposed Piston EDG Oil Pump Leak |
09/28/2012 |
ML12283A246 |
2012-46-00 |
Engine Systems Inc. |
EMD/Detroit Diesel Temperature Switch Potentially Shipped Without Set Screw |
10/05/2012 |
ML12292A197 |
2012-45-01 |
Shaw AREVA MOX Services |
Interim Report Closure - HVAC Duct Spool Minimum Wall Thickness |
12/19/2012 |
ML12356A095 |
2012-45-00 |
Shaw AREVA MOX Services |
Interim Report - HVAC Duct Spool Minimum Wall Thickness |
10/04/2012 |
ML12278A421 |
2012-44-02 |
Waterford 3 |
Defective Masoneilan I/P Transducer Model 8005N |
01/25/2013 |
ML13025A167 |
2012-44-01 |
Waterford 3 |
Defective Masoneilan Transducer Model 8005N |
10/01/2012 |
ML12276A111 |
2012-44-00 |
Waterford 3 |
Defective Masoneilan Transducer Model 8005N |
09/28/2012 |
EN 48357 |
2012-43-01 |
FitzPatrick |
Retraction - Faulty Rosemount Master Trip Units, Slave Units and Resistance Temperature Detectors |
10/26/2012 |
EN 48353 |
2012-43-00 |
FitzPatrick |
Faulty Rosemount Master Trip Units, Slave Units and Resistance Temperature Detectors |
09/27/2012 |
EN 48353 |
2012-42-02 |
GE Hitachi Nuclear Energy |
Error in Main Steam Line High Flow Calculation Methodology (Final Report). |
02/08/2012 |
ML13042A096 |
2012-42-01 |
GE Hitachi Nuclear Energy |
Error in Main Steam Line High Flow Calculation Methodology (Updated Interim Report). |
12/12/2012 |
ML12347A308 |
2012-42-00 |
GE Hitachi Nuclear Energy |
Error in Main Steam Line High Flow Calculation Methodology (Interim Report). |
09/27/2012 |
ML12271A314 |
2012-41-01 |
The Shaw Group Inc. |
Part 21 Report Regarding Embedments for AP1000 Project Vogtle Units 3 and 4 |
11/05/2012 |
ML12318A156 |
2012-41-00 |
The Shaw Group Inc. |
Interim Part 21 Report Regarding Embedments for AP1000 Project Vogtle Units 3 and 4 |
09/19/2012 |
ML12268A177 |
2012-40-00 |
Ametek Solidstate Controls |
Notification of Potential Defect in 10 KVA Inverter Model 86VC0100-15 |
09/07/2012 |
ML12255A052 |
2012-39-00 |
Comanche Peak |
Failure of Safety Related Breaker Control Devices Due to a Common Cause (a 50.73 report that also constitutes a 10 CFR 21 notification) |
08/16/2012 |
ML12240A050 |
2012-38-00 |
Crystal River Unit 3 |
Mechanical Seal Failure on a new Engine-Driven Diesel Fuel Pump |
08/21/2012 |
ML12240A011 |
2012-37-01 |
Westinghouse Electric Company |
Defect Due to Change in Manufacturing Process Causing Relay Failure in Safety Related Systems |
04/08/2013 |
ML13100A357 |
2012-37-00 |
Westinghouse Electric Company |
Stress Corrosion Cracking Causing Relay Failure in Safety Related Systems |
08/23/2012 |
ML12243A187 |
2012-36-00 |
Waterford 3 |
Drift of I/P Transducer Causes Inoperability of Safety Related System (a 50.73 report that also constitutes a 10 CFR 21 Interim notification). |
07/31/2012 |
ML12214A257 |
2012-35-00 |
Nine Mile Point |
Loss of Isolation Function on RHR Shutdown Cooling Suction Line due to Breaker Trip (a 50.73 report that also constitutes a 10 CFR 21 notification). |
07/23/2012 |
ML12214A396 |
2012-34-00 |
ITT Enidine |
ITT Conoflow Model GFH25 Pneumatic Filter Regulators Fail to Comply with Specifications |
08/07/2012 |
EN 48164 |
2012-33-00 |
ITT Enidine |
ITT Conoflow Model GT25 Series Current to Pressure Transducers Fail to Comply with Specifications |
08/07/2012 |
EN 48163 |
2012-32-00 |
Flowserve |
Defective Valve Seal Cap On Y-Type Globe Valves |
08/03/2012 |
ML12219A231 |
2012-31-02 |
Qualtech NP |
TYCO Model CNT-35-96 Timing Relay Will Not Trip at a Specific Setting (Revision to Notification) |
09/10/2012 |
ML12258A399 |
2012-31-01 |
Qualtech NP |
TYCO Model CNT-35-96 Timing Relay Will Not Trip at a Specific Setting (Revision to Notification) |
08/02/2012 |
ML12226A002 |
2012-31-00 |
Qualtech NP |
TYCO Model CNT-35-96 Timing Relay Will Not Trip at a Specific Setting |
07/31/2012 |
ML12215A320 |
2012-30-00 |
Shaw Areva MOX Services |
Thermally Sensitized Piping Fails ASTM A262 Tests to Detect Susceptibility to Intergranular Attack (Interim Report) |
07/12/2012 |
ML12198A010 |
2012-29-01 |
Fort Calhoun Station |
Defective General Electric CR105X300 Auxiliary Contactor |
07/11/2012 |
ML12199A222 |
2012-29-00 |
Fort Calhoun Station |
Defective General Electric CR105X300 Auxiliary Contactor |
07/06/2012 |
ML121910230 |
2012-28-00 |
Nutherm International |
Potential Failures of Kraus and Naimer (K&N) M470 Spring Return Switches |
07/02/2012 |
ML121910334 |
2012-27-00 |
Rosemount Nuclear |
Reliability Degradation Of Resistors In Trip Units And Readout Assemblies |
06/21/2012 |
ML12177A056 |
2012-26-00 |
Flowserve |
Potentially Reduced Flow Capacity in WKM Pilot Operated Relief Valves in Sizes 2 Inches and Above |
06/07/2012 |
ML12160A364 |
2012-25-02 |
Shaw Group Inc |
Ductility of Reinforcing Steel for Embedments not in Accordance with Code Requirement (Rebuttal clarification by Joseph Oat Corporation). |
6/13/2012 |
ML12171A203 |
2012-25-01 |
Shaw Group Inc |
Ductility of Reinforcing Steel for Embedments not in Accordance with Code Requirement (Rebuttal by Joseph Oat Corporation). |
6/13/2012 |
ML12166A477 |
2012-25-00 |
Shaw Group Inc. |
Ductility of Reinforcing Steel for Embedments not in Accordance with Code Requirement |
05/31/2012 |
ML12160A080 |
2012-24-01 |
RSCC Wire & Cable, LLC |
Firezone 3HR 600V Cable May Not Function as Tested and Qualified |
07/20/2012 |
ML12214A359 |
2012-24-00 |
RSCC Wire & Cable, LLC |
Firezone 3HR 600V Cable May Not Function as Tested and Qualified. |
05/30/2012 |
ML12153A025 |
2012-23-01 |
ABB, Inc. |
Protective Relays May Not be Qualified for Harsh Environments (Closed) |
04/01/2013 |
ML13093A154 |
2012-23-00 |
ABB, Inc. |
Protective Relays May Not be Qualified for Harsh Environments |
05/29/2012 |
ML12153A030 |
2012-22-05 |
Watts Bar 1 |
Final Closure - Unexpected Degradation of Vital Batteries III and IV |
03/21/2013 |
ML13081A140 |
2012-22-04 |
Watts Bar 1 |
Unexpected Degradation of Vital Batteries III and IV |
01/22/2013 |
ML13023A047 |
2012-22-03 |
Watts Bar 1 |
Unexpected Degradation of Vital Batteries III and IV |
11/21/2012 |
ML12326A714 |
2012-22-02 |
Watts Bar 1 |
Unexpected Degradation of Vital Batteries III and IV |
09/10/2012 |
ML12261A473 |
2012-22-01 |
Watts Bar 1 |
Unexpected Degradation of Vital Batteries III and IV |
07/24/2012 |
ML12206A055 |
2012-22-00 |
Watts Bar 1 |
Unexpected Degradation of Vital Batteries III and IV |
05/25/2012 |
ML12145A670 |
2012-21-00 |
Shaw Group Inc. |
Threading Deviations on Steel Reinforcing Bar Provided to Construction Projects |
05/14/2012 |
ML12137A194 |
2012-20-01 |
EnergySolutions |
Shipping Casks Taken Out of Service for Previously Unanalyzed Accident Scenario |
05/25/2012 |
ML12150A369 |
2012-20-00 |
EnergySolutions |
Shipping Casks Taken Out of Service for Previously Unanalyzed Accident Scenario |
05/03/2012 |
ML12136A562 |
2012-19-01 |
Diablo Canyon 1 |
Scientech Controllers Did Not Meet EMI/RFI Guidelines |
05/22/2012 |
ML12144A108 |
2012-19-00 |
Diablo Canyon |
Scientech Controllers Did Not Meet EMI/RFI Guidelines |
04/29/2012 |
ML12123A090 |
2012-18-03 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear Adjacent to Retainer Bars (San Onofre 3) |
10/05/2012 |
ML12283A243 |
2012-18-02 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear Adjacent to Retainer Bars (San Onofre 3) |
09/07/2012 |
ML12255A054 |
2012-18-01 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear Adjacent to Retainer Bars (San Onofre 3) |
06/04/2012 |
ML12157A311 |
2012-18-00 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Leak During First Cycle After Steam Generator Replacement (San Onofre 3) |
04/19/2012 |
ML121210672 |
2012-17-00 |
Fisher Controls International |
Fisher Type 9500 Butterfly Valves Contain Non Dedicated Parts |
04/18/2012 |
EN 47846 |
2012-16-00 |
Netco |
Decrease in Average BADGER Measured Boraflex B10 Areal Density at Grand Gulf |
04/18/2012 |
ML12109A281 |
2012-15-00 |
Swagelok |
Swagelok U Series Bellows Valves Loosening of Stem Tips |
04/17/2012 |
ML12110A167 |
2012-14-03 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear (SONGS 2) |
10/05/2012 |
ML12283A302 |
2012-14-02 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear (SONGS 2) |
09/07/2012 |
ML12255A053 |
2012-14-01 |
Mitsubishi Nuclear Energy Systems |
Steam Generator Tube Wear (SONGS 2) |
06/04/2012 |
ML12157A310 |
2012-14-00 |
Mitsubishi Nuclear Energy Systems, Inc. |
Interim Report - Steam Generator Tube Wear |
04/13/2012 |
ML12109A094 |
2012-13-02 |
ABB, Inc. |
HK Circuit Breaker Studs Failed to Meet Specification |
12/16/2016 |
ML17006A013 |
2012-13-01 |
ABB, Inc. |
HK Circuit Breaker Studs Failed to Meet Specification |
04/27/2012 |
ML12123A089 |
2012-13-00 |
ABB, Inc. |
HK Circuit Breaker Studs Failed to Meet Specification |
04/09/2012 |
ML12103A171 |
2012-12-00 |
Rosemount Nuclear |
Notification under 10 CFR Part 21 on Certain Rosemount Model 1154 Series H Pressure Transmitters |
03/02/2012 |
ML12066A118 |
2012-11-00 |
Ametek Solidstate Controls |
Potential Defect on Arvan Electrical Terminal Blocks |
03/14/2012 |
ML12075A106 |
2012-10-00 |
Susquehanna |
Inadequate Gasket Preload Leads to Flooding (a 10 CFR 50.73 report) |
02/28/2012 |
ML12060A079 |
2012-09-01 |
Browns Ferry |
Cracks in Residual Heat Removal Pump Stator Frames |
04/30/2012 |
ML121220293 |
2012-09-00 |
Browns Ferry |
Cracks in Residual Heat Removal Pump Stator Frames |
03/06/2012 |
ML12068A372 |
2012-08-01 |
EnerSys |
Interim Report Concerning Battery Cells with Potentially Reduced Discharge Capacity |
05/07/2012 |
ML12137A195 |
2012-08-00 |
Enersys |
Interim Report Concerning Battery Cells With Potentially Reduced Discharge Capacity |
03/12/2012 |
ML12073A347 |
2012-07-00 |
Fisher Controls International |
Potential Minimum Wall Violation on Seismic Plate Valve Bodies |
02/28/2012 |
ML12061A268 |
2012-06-00 |
Engine Systems, Inc. |
Missing Upper Mounting Pads on Subcover Assemblies |
02/22/2012 |
ML12062A021 |
2012-05-02 |
Rosemount Nuclear |
Rosemount Pressure Transmitters With Nonzero Based Calibrations |
04/03/2012 |
ML12097A316 |
2012-05-01 |
Rosemount Nuclear |
Rosemount Pressure Transmitters With Nonzero Based Calibrations |
04/02/2012 |
ML12094A371 |
2012-05-00 |
Rosemount Nuclear |
Rosemount Pressure Transmitters With Nonzero Based Calibrations |
02/23/2012 |
ML12058A141 |
2012-04-00 |
Curtiss Wright Flow Control Co. |
Defective Plug Insulators |
02/06/2012 |
ML12039A241 |
2012-03-00 |
Engine Systems, Inc. |
Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose |
02/03/2012 |
ML12038A029 |
2012-02-01 |
GE-Hitachi Nuclear Energy |
Failure of CRD Collet Retainer Tube/Outer Tube Weld. |
06/06/2012 |
ML12163A130 |
2012-02-00 |
GE Hitachi Nuclear Energy |
Failure of CRD Collet Retainer Tube/Outer Tube Weld |
02/01/2012 |
ML12032A240 |
2012-01-01 |
ATC Nuclear |
Defective 48 Volt DC Safety Related Power Supplies |
03/27/2012 |
ML12088A174 |
2012-01-00 |
ATC Nuclear |
Defective 48 Volt DC Safety Related Power Supplies |
01/03/2012 |
ML12005A231 |