Log No |
Notifier |
Description |
Report Date |
Event No. / Accession No. |
2014-91-01 |
Baldor Electric Co. |
Written and Final Report - Baldor AC Motors with Potential Bearing End Cap Alignment Issues (Revised) |
01/23/2015 |
ML15034A566 |
2014-91-00 |
Baldor Electric Co. |
Baldor AC Motors with Potential Bearing End Cap Alignment Issues |
12/23/2014 |
ML14365A059 |
2014-90-02 |
ABB Inc. |
Second Update to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating |
11/17/2016 |
ML16328A313 |
2014-90-01 |
ABB |
Amendment to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating |
03/05/2015 |
ML15070A543 |
2014-90-00 |
ABB |
Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating |
12/17/2014 |
ML14357A334 |
2014-89-01 |
ASCO Valve, Inc. |
Final Report - Potential Part 21 Notification (Steris Isomedix) |
08/19/2015 |
ML15243A173 |
2014-89-00 |
ASCO Valve, Inc. |
Interim Report - Potential Part 21 Notification (Steris Isomedix) |
12/16/2014 |
ML14357A335 |
2014-88-01 |
WECTEC LLC (formerly CB&I Power) |
Closure of Interim Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects |
01/15/2016 |
ML16034A222 |
2014-88-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects |
12/04/2014 |
ML14349A376 |
2014-87-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project |
01/08/2015 |
ML15022A201 |
2014-87-00 |
CB&I Nuclear |
Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project |
11/13/2014 |
ML14337A115 |
2014-86-03 |
CB&I Nuclear |
Closure of Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)
|
06/09/2015 |
ML15173A096 |
2014-86-02 |
CB&I Nuclear |
Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)
|
03/20/2015 |
ML15180A134 |
2014-86-01 |
CB&I Nuclear |
Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) |
01/21/2015 |
ML14337A114 |
2014-86-00 |
CB&I Nuclear |
Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) |
11/20/2014 |
ML14337A114 |
2014-85-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) |
06/09/2015 |
ML15173A096 |
2014-85-00 |
CB&I Nuclear |
Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) |
11/13/2014 |
ML14335A295 |
2014-84-01 |
AREVA Inc. |
Defect in LOCA Analysis for B&W Plants (Written Report) |
12/16/2014 |
ML14351A308 |
2014-84-00 |
AREVA Inc. |
Defect in LOCA Analysis for B&W Plants |
11/25/2014 |
ML14337A095 |
2014-83-01 |
National Technical Systems |
Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Updated Interim Report) |
05/21/2015 |
ML15152A125 |
2014-83-00 |
National Technical Systems |
Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Interim Report) |
11/12/2014 |
ML14325A687 |
2014-82-00 |
Emerson Process Management |
Improper Dedication of Fisher Controls Type 67 AFR Regulator Diaphragm Assembly Parts |
11/19/2014 |
ML14337A093 |
2014-81-02 |
Technology for Energy Corporation |
Final Notification of Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems |
12/18/2014 |
EN 50623 |
2014-81-01 |
Technology for Energy Corporation |
Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems (Corrected Report) |
11/24/2014 |
ML14337A094 |
2014-81-00 |
Technology for Energy Corporation |
Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems |
11/18/2014 |
ML14329A063 |
2014-80-00 |
Flowserve |
Miller Air Cylinder Seal Dedication Issue |
11/13/2014 |
ML14321A011 |
2014-79-02 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project |
02/23/2015 |
ML15055A525 |
2014-79-01 |
CB&I Nuclear |
Updated Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project |
12/09/2014 |
ML15029A057 |
2014-79-00 |
CB&I Nuclear |
Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project |
10/23/2014 |
ML14310A577 |
2014-78-01 |
TVA - Browns Ferry Units 1, 2, 3 |
Closure of Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX |
10/31/2014 |
ML14309A529 |
2014-78-00 |
TVA - Browns Ferry Units 1, 2, 3 |
Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX |
09/05/2014 |
ML14318A196 |
2014-77-01 |
CB&I Nuclear |
Closure of Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 |
10/16/2014 |
ML14297A152 |
2014-77-00 |
CB&I Nuclear |
Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project |
08/14/2014 |
ML14234A021 |
2014-76-02 |
CB&I Nuclear |
Part 21 Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects |
01/13/2015 |
ML15027A425 |
2014-76-01 |
CB&I Nuclear |
Updated Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects |
12/11/2014 |
ML15014A214 |
2014-76-00 |
CB&I Nuclear |
Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects
|
10/15/2014 |
ML14296A427 |
2014-75-00 |
Ametek Solidstate Controls |
Insufficient Spot Weld on Wire Wound Resistor |
10/17/2014 |
ML14294A684 |
2014-74-01 |
Waterford 3 |
Written Notification of Defective Allen Bradley Type 700RTC Relay |
11/12/2014 |
ML14316A441 |
2014-74-00 |
Waterford 3 |
Defective Allen Bradley Type 700RTC Relay |
10/26/2014 |
ML14294A685 |
2014-73-01 |
AREVA Inc. |
Notification of an Error in POWERPLEX MCPR and LHGR Limit Input for Browns Ferry Unit 2 |
10/27/2014 |
ML14303A258 |
2014-73-00 |
AREVA Inc. |
Defect in the Input to Calculate Thermal Limits |
10/03/2014 |
ML14281A061 |
2014-72-00 |
Electroswitch |
Orientation of Series 20 Internal Wire may Allow the Side Cover Screw to Touch the Wire Insulation |
10/03/2014 |
ML14281A062 |
2014-71-01 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) |
01/08/2015 |
ML15022A201 |
2014-71-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) |
08/27/2014 |
ML14255A017 |
2014-70-01 |
Oyster Creek |
Electromatic Relief Valve Excessive Wear |
10/08/2014 |
ML14302A071 |
2014-70-00 |
Oyster Creek |
Electromatic Relief Valve Excessive Wear |
09/25/2014 |
EN 50495 |
2014-69-00 |
Carboline Company |
Carboline SG Base Not Curing Properly |
09/23/2014 |
EN 50486 |
2014-68-01 |
QualTech NP |
Close Out of Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions |
12/30/2014 |
ML15014A107 |
2014-68-00 |
QualTech NP |
Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions |
09/22/2014 |
ML14268A234 |
2014-67-00 |
Nuclear Innovation North America, LLC |
Response to General Electric-Hitachi Final Part 21 Report from STP Units 3 & 4 (See Part 21 No. 2014-18-00/-01/-02) |
09/15/2014 |
ML14261A148 |
2014-66-02 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) |
10/16/2014 |
ML14297A152 |
2014-66-01 |
CB&I Nuclear |
Updated Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) |
09/16/2014 |
ML14274A040 |
2014-66-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) |
09/04/2014 |
ML14259A350 |
2014-65-01 |
The Okonite Company |
Final Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix |
07/30/2015 |
ML15232A523 |
2014-65-00 |
The Okonite Company |
Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix |
08/27/2014 |
ML14254A428 |
2014-64-01 |
Summer Units 2 & 3 |
Root Cause Analysis for Deviations Associated with the Submodule Welding Program (a 10CFR50.55(e) report) |
09/29/2014 |
ML14272A353 |
2014-64-00 |
Summer Units 2 & 3 |
Welding Program Deviations During Construction (a 10CFR50.55(e) report) |
09/10/2014 |
EN 50442 |
2014-63-00 |
Vogtle Units 3 & 4 |
Welding Program Deviations During Construction (a 10CFR50.55(e) report) |
09/10/2014 |
EN 50441 |
2014-62-00 |
Cameron Measurement Systems |
Defective Barton Differential Pressure Switches |
09/09/2014 |
ML14259A390 |
2014-61-00 |
Underwater Construction Corporation |
Failure to Meet Specified Irradiation During Testing of Coated Test Panels |
09/08/2014 |
ML14259A389 |
2014-60-01 |
Schulz Electric |
Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 (Final Evaluation) |
09/30/2014 |
ML14275A161 |
2014-60-00 |
Schulz Electric |
Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 |
09/05/2014 |
EN 50428 |
2014-59-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) |
09/04/2014 |
ML14259A351 |
2014-59-00 |
CB&I Nuclear |
Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) |
07/30/2014 |
ML14237A119 |
2014-58-01 |
ABB Inc. |
Amended Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch |
09/12/2014 |
ML14265A049 |
2014-58-00 |
ABB Inc. |
Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch |
08/15/2014 |
ML14237A121 |
2014-57-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project |
10/16/2014 |
ML14297A152 |
2014-57-00 |
CB&I Nuclear |
Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project |
08/01/2014 |
ML14220A025 |
2014-56-02 |
Nutherm International, Inc. |
Final Update on Part 21 Issue Regarding Incorrect Industrial Irradiation Dose |
02/03/2016 |
ML16039A269 |
2014-56-01 |
Nutherm International |
Updated Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose |
08/31/2015 |
ML15251A213 |
2014-56-00 |
Nutherm International |
Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose |
08/01/2014 |
ML14226A995 |
2014-55-00 |
Crane Nuclear, Inc. |
Safety - Related Valves Assembled with Non-Safety Related Levers |
08/01/2014 |
ML14218A510 |
2014-54-00 |
United Controls International |
Interim Report - Temperature Switch Set Points out of Calibration |
07/31/2014 |
ML14217A347 |
2014-53-01 |
SOR, Inc. |
Potentially Defective Pressure and Temperature Switches |
04/02/2015 |
ML15099A043 |
2014-53-00 |
SOR, Inc. |
Potentially Defective Pressure and Temperature Switches |
07/23/2014 |
ML14213A099 |
2014-52-00 |
Fisher Controls International |
Non-Conforming Solenoid Valves Sent to Progress Energy - Brunswick |
07/21/2014 |
ML14210A009 |
2014-51-03 |
ITT Engineered Valves, LLC |
Second Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) |
04/07/2015 |
ML15103A485 |
2014-51-02 |
ITT Engineered Valves, LLC |
Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) |
09/17/2014 |
ML14261A150 |
2014-51-01 |
ITT Engineered Valves, LLC |
Written Notification - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) |
08/14/2014 |
ML14226A641 |
2014-51-00 |
ITT Engineered Valves, LLC |
Improper Irradiation of Samples for Ball Valve Seats and Diaphagms (Steris Isomedix Services) |
07/18/2014 |
ML14210A053 |
2014-50-01 |
Velan Inc. |
Revised Notification of Defects on 2 -inch Bonnets (Corrected Part Number) |
07/28/2014 |
ML14213A010 |
2014-50-00 |
Velan Inc. |
Notification of Defects on 2-inch Bonnets |
07/18/2014 |
ML14210A008 |
2014-49-00 |
Westinghouse Electric Co. |
Potential Failure of Reactor Coolant Pump Turning Vane Bolts |
07/14/2014 |
ML14197A281 |
2014-48-00 |
Nuclear Logistics, Inc. |
Assembly Errors During Breaker Refurbishment |
07/11/2014 |
ML14197A380 |
2014-47-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) |
09/04/2014 |
ML14259A351 |
2014-47-00 |
CB&I Nuclear |
Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) |
07/03/2014 |
ML14192A041 |
2014-46-02 |
CB&I Nuclear |
Closure of Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) |
10/16/2014 |
ML14297A152 |
2014-46-01 |
CB&I Nuclear |
Updated Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) |
08/19/2014 |
ML14253A142 |
2014-46-00 |
CB&I Nuclear |
Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) |
07/03/2014 |
ML14192A039 |
2014-45-01 |
Preferred Metal Technologies, Inc. |
Final Report - Incorrect Industrial Irradiator Dose (Steris Isomedix Services) |
07/30/2014 |
ML14216A377 |
2014-45-00 |
Preferred Metal Technologies, Inc. |
Incorrect Industrial Irradiator Dose (Steris Isomedix Services) |
07/03/2014 |
ML14192A040 |
2014-44-00 |
Kinectrics Inc. |
Potential Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Steris) |
06/27/2014 |
ML14184B303 |
2014-43-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
09/04/2014 |
ML14259A351 |
2014-43-00 |
CB&I Nuclear |
Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
06/10/2014 |
ML14178A113 |
2014-42-01 |
Waterford 3 |
Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration |
07/09/2014 |
ML14190B371 |
2014-42-00 |
Waterford 3 |
Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration |
06/12/2014 |
ML14171A356 |
2014-41-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project |
07/30/2014 |
ML14237A119 |
2014-41-00 |
CB&I Nuclear |
Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project |
05/23/2014 |
ML14160A721 |
2014-40-02 |
CB&I Nuclear |
Closure of Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module |
10/16/2014 |
ML14297A152 |
2014-40-01 |
CB&I Nuclear |
Updated Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication |
07/21/2014 |
ML14212A412 |
2014-40-00 |
CB&I Nuclear |
Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication |
05/22/2014 |
ML14160A718 |
2014-39-00 |
AREVA Inc. |
Defect Identified in Single Loop Operation Minimum Critical Power Ratio |
06/04/2014 |
ML14160A781 |
2014-38-01 |
Watts Bar |
Final Report - Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) |
06/19/2014 |
ML14174A042 |
2014-38-00 |
Watts Bar |
Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) |
06/03/2014 |
ML14160A783 |
2014-37-01 |
Flowserve |
Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 |
06/02/2014 |
ML14364A168 |
2014-37-00 |
Flowserve |
Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 |
04/02/2014 |
ML14154A086 |
2014-36-02 |
Shaw AREVA MOX Services |
Closure of Interim Report - Nelson Deformed Bars |
11/13/2014 |
ML14317A461 |
2014-36-01 |
Shaw AREVA MOX Services |
Updated Interim Report - Nelson Deformed Bars |
08/26/2014 |
ML14238A581 |
2014-36-00 |
Shaw AREVA MOX Services |
Interim Report - Nelson Deformed Bars |
05/28/2014 |
ML14148A271 |
2014-35-01 |
Pentair Valves and Controls |
Closure of Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met |
08/27/2014 |
ML14241A238 |
2014-35-00 |
Pentair Valves and Controls |
Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met |
05/23/2014 |
ML14147A370 |
2014-34-01 |
Browns Ferry Nuclear Plant |
Closure of Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing |
07/07/2014 |
ML14189A417 |
2014-34-00 |
Browns Ferry Nuclear Plant |
Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing |
05/09/2014 |
ML14135A035 |
2014-33-00 |
Pentair |
Interim Report - Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing |
05/08/2014 |
ML14129A436 |
2014-32-00 |
Scientech |
NUS-710DU Trip Units Could Fail to Produce a Valid Trip Signal in Certain Operating Configurations |
05/08/2014 |
ML14134A079 |
2014-31-00 |
Flowserve |
Size 4 Pressure Class 600 Normally Open In-Line Check Valves Missing Jam Nuts |
05/02/2014 |
ML14125A270 |
2014-30-01 |
CB&I Nuclear |
Closure of Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 |
05/20/2014 |
ML14160A719 |
2014-30-00 |
CB&I Nuclear |
Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 Project |
04/23/2014 |
ML14121A058 |
2014-29-01 |
North Anna 1 & 2 |
Retraction of Interim Report - Basler Motor Operated Control (Potentiometer) Not Functioning Properly |
06/16/2014 |
ML14174A936 |
2014-29-00 |
North Anna 1 & 2 |
Basler Motor Operated Control (Potentiometer) Not Functioning Properly |
04/21/2014 |
ML14113A588 |
2014-28-06 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (See related 50.55(e) reports at 2014-63-00 and 2014-64-00) |
06/09/2015 |
ML15173A096 |
2014-28-05 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects |
11/05/2014 |
ML14325A688 |
2014-28-04 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects |
05/02/2014 |
ML14129A471 |
2014-28-03 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects |
04/30/2014 |
ML14136A039 |
2014-28-02 |
CB&I Nuclear |
Interim Part 21 Report Regarding Sub-Module Coupler Welding Qualification. Nonconformance for AP1000. |
04/28/2014 |
ML14127A098 |
2014-28-01 |
CB&I Nuclear |
Updated Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 |
04/22/2014 |
ML14121A057 |
2014-28-00 |
CB&I Nuclear |
Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 |
02/21/2014 |
ML14112A085 |
2014-27-00 |
QualTech NP |
QualTech NP Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911 (See Part 21 Reports 2014-12-00 and 2014-12-01) |
04/09/2014 |
ML14107A161 |
2014-26-01 |
Cameron Measurement Systems |
Barton Model 288A and 289A Differential Pressure Switch Defect (Supplementary Information and Closure) |
06/09/2014 |
ML14170A013 |
2014-26-00 |
Cameron Measurement Systems |
Barton Model 288A and 289A Differential Pressure Switch Defect |
04/10/2014 |
ML14105A039 |
2014-25-00 |
Rosemount Nuclear Instruments |
Certain Model 1154HP Transmitters Shipped to Point Beach May Exhibit Degraded Functional Reliability |
04/10/2014 |
ML14105A018 |
2014-24-01 |
Baldor Electric Co. |
Potential Defect in Motors Shipped to DTE Electric Company |
04/15/2014 |
ML14112A481 |
2014-24-00 |
Baldor Electric Co. |
Potential Defect in Motors Shipped to DTE Electric Company |
04/09/2014 |
ML14101A344 |
2014-23-02 |
QualTech NP |
Revision to Final Notification Related to Potential Defect in General Electric Type CR120AD Control Relays |
02/05/2015 |
ML15040A083 |
2014-23-01 |
QualTech NP |
Potential Defect in General Electric Type CR120AD Control Relays (Update / Closure) |
05/09/2014 |
ML14134A121 |
2014-23-00 |
QualTech NP |
Potential Defect in General Electric Type CR120AD Control Relays |
04/09/2014 |
ML14101A343 |
2014-22-00 |
United Controls International |
Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SB1 Switches and HEA Relays |
04/09/2014 |
ML14101A342 |
2014-21-00 |
Pentair Valves and Controls |
Interim Report – Evaluation regarding potential deficiencies in justification of use of prorate spring in PV-62 (CAR 674) |
03/27/2014 |
ML14090A433 |
2014-20-00 |
Pentair Valves and Controls |
Interim Report - Evaluation regarding potential deficiencies in testing of PV-62 (CAR 675) |
03/27/2014 |
ML14090A431 |
2014-19-02 |
Pentair Valves and Controls |
Closure of Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) |
08/27/2014 |
ML14241A038 |
2014-19-01 |
Pentair Valves and Controls |
Updated Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) |
06/15/2014 |
ML14169A030 |
2014-19-00 |
Pentair Valves and Controls |
Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) |
03/27/2014 |
ML14090A430 |
2014-18-02 |
GE Hitachi Nuclear Energy |
Closure of Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design |
08/29/2014 |
ML14241A306 |
2014-18-01 |
GE Hitachi Nuclear Energy |
Updated Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design |
06/26/2014 |
ML14177A498 |
2014-18-00 |
GE Hitachi Nuclear Energy |
Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design |
03/31/2014 |
ML14090A068 |
2014-17-03 |
C&D Technologies, Inc. |
Revision 1 to Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries |
10/27/2014 |
ML14310A186 |
2014-17-02 |
C&D Technologies, Inc. |
Updated Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries - Includes List of Affected Utilities |
09/22/2014 |
ML14274A052 |
2014-17-01 |
C&D Technologies, Inc. |
Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries |
09/16/2014 |
ML14266A509 |
2014-17-00 |
C&D Technologies, Inc. |
Interim Report - Inability to Complete Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries |
03/28/2014 |
ML14094A012 |
2014-16-00 |
United Controls International |
Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SBM Switches |
03/19/2014 |
ML14085A012 |
2014-15-01 |
ASCO Valve Incorporated |
Final Report - Scram Solenoid Valve Not Exhausting Properly |
06/16/2014 |
ML14169A258 |
2014-15-00 |
ASCO Valve Incorporated |
Scram Solenoid Pilot Valve Not Exhausting Properly |
03/11/2014 |
ML14079A026 |
2014-14-01 |
United Controls International |
Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards (Final Report) |
04/17/2014 |
ML14113A370 |
2014-14-00 |
United Controls International |
Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards |
03/19/2014 |
ML14085A013 |
2014-13-01 |
Dresser-Rand Company |
PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert (Final Report) |
04/17/2014 |
ML14113A398 |
2014-13-00 |
Dresser-Rand Company |
PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert |
03/17/2014 |
ML14079A353 |
2014-12-01 |
Waterford 3 |
Allen Bradley Type 700RTC Relay Spurious De-Energizing
|
04/11/2014 |
ML14101A467 |
2014-12-00 |
Waterford 3 |
Allen Bradley Type 700RTC Relay Spurious De-Energizing
|
03/13/2014 |
ML14079A028 |
2014-11-01 |
GE Hitachi Nuclear Energy |
Closure of Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve |
07/23/2014 |
ML14204A706 |
2014-11-00 |
GE Hitachi Nuclear Energy |
Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve |
03/13/2014 |
ML14072A324 |
2014-10-01 |
Valcor Engineering Corporation |
Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing (Update) |
08/15/2014 |
ML14237A120 |
2014-10-00 |
Valcor Engineering Corporation |
Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing |
03/12/2014 |
ML14079A551 |
2014-09-00 |
Nuclear Logistics, Inc. |
Potential Manufacturing Defect in Replacement Masterpact Cradles |
02/26/2014 |
ML14069A467 |
2014-08-00 |
Engine Systems, Inc. |
Emergency Diesel Generator Staring Air Pressure Regulator Supplied to Brunswick Nuclear Plant |
02/14/2014 |
ML14057A806 |
2014-07-00 |
ABB Inc. |
Instruction Leaflet for CVX & CVX-1 Relays May be Deficient |
02/10/2014 |
ML14055A352 |
2014-06-00 |
Weir Valves & Controls USA |
Interim Report Regarding TRICENTRIC Triple Offset Butterfly Valves |
02/07/2014 |
ML14055A394 |
2014-05-00 |
Hilti |
Notification of a Potentially Safety Relevant Non-Conformance for HSL-3 M24 Carbon Steel Expansion Anchors |
01/09/2014 |
ML14030A179 |
2014-04-01 |
Westinghouse Electric Co. |
Part 21/50.55(e) Closure of Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation |
09/08/2014 |
ML14255A018 |
2014-04-00 |
Westinghouse Electric Co. |
Part 21/50.55(e) Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation |
01/29/2014 |
ML14042A215 |
2014-03-01 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly |
04/09/2014 |
ML14112A086 |
2014-03-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly |
01/21/2014 |
ML14029A197 |
2014-02-01 |
CCI Thermal Technologies, Inc. |
Closure of Nonconformance of an Electrical Tubular Water Heater |
02/12/2016 |
ML16048A250 |
2014-02-00 |
CCI Thermal Technologies, Inc. |
Nonconformance of an Electrical Tubular Water Heater |
01/21/2014 |
ML14034A188 |
2014-01-00 |
C&D Technologies, Inc. |
Loose Battery Vent Assemblies |
01/21/2014 |
ML14034A189 |