Log No |
Notifier |
Description |
Report Date |
Event No. / Accession No. |
2015-88-03 |
CB&I AREVA MOX Services |
Closure of Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication |
10/25/2016 |
ML16299A386 |
2015-88-02 |
CB&I AREVA MOX Services |
Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication |
07/26/2016 |
ML16208A315 |
2015-88-01 |
CB&I AREVA MOX Services |
Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication |
04/26/2016 |
ML16118A372 |
2015-88-00 |
CB&I AREVA MOX Services |
Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication |
12/16/2015 |
ML15351A054 |
2015-87-03 |
Homewood Products Corporation |
Final Report on Part 21 Issue with Irradiations Performed by Steris Isomedix Services |
05/13/2016 |
ML16145A069 |
2015-87-02 |
Homewood Products Corporation |
Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Updated) |
03/22/2016 |
ML16102A078 |
2015-87-01 |
Homewood Products Corporation |
Part 21 Issue on Irradiations performed by Steris Isomedix Services |
01/08/2016 |
ML16012A502 |
2015-87-00 |
Homewood Products Corporation |
Part 21 Issue on Irradiations performed by Steris Isomedix Services (based upon information provided by National Technical Systems) |
12/21/2015 |
ML16004A029 |
2015-86-02 |
WECTEC LLC (formerly CB&I Power) |
Updated Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects |
03/09/2016 |
ML16076A263 |
2015-86-01 |
WECTEC LLC (formerly CB&I Power) |
Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects |
02/03/2016 |
ML16039A257 |
2015-86-00 |
CB&I |
Interim Report Regarding Wall Penetration Corrosion for Vogtle Unit 4 and V.C. Summer Unit 3 AP1000 Projects |
12/08/2015 |
ML16014A712 |
2015-85-00 |
Three Mile Island Unit 1 |
Part 21 Notification Due To Breaker Defect |
12/28/2015 |
ML15363A009 |
2015-84-01 |
WECTEC LLC (Former CB&I) |
Closure of Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project |
07/05/2016 |
ML16197A150 |
2015-84-00 |
CB&I |
Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project |
12/10/2015 |
ML15357A004 |
2015-83-00 |
MPR Associates, Inc. |
Replacement EDG Timing Module Failure at Hatch Nuclear Plant |
12/23/2015 |
ML16004A030 |
2015-82-00 |
Nutherm International, Inc. |
Potential Part 21 Report Involving Moore Industries RTD Transmitter |
12/18/2015 |
ML15357A041 |
2015-81-00 |
Curtiss-Wright QualTech NP |
Eaton/Cutler Hammer A200 series Starters and Contactors |
12/18/2015 |
ML15357A042 |
2015-80-00 |
Howden North America, Inc. |
Two Fan Motors Were Not Properly Prepared before Small Steel Shot Blasting |
12/08/2015 |
ML15345A390 |
2015-79-00 |
United Controls International |
Improper Silver Plating During Refurbishment of AK-25 Type Circuit Breakers |
12/01/2015 |
ML15341A328 |
2015-78-02 |
WECTEC LLC (formerly CB&I Power) |
Closure of Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project |
07/05/2016 |
ML16197A150 |
2015-78-01 |
WECTEC LLC (formerly CB&I Power) |
Updated Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project |
01/21/2016 |
ML16053A285 |
2015-78-00 |
CB&I Power |
Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project |
11/12/2015 |
ML15331A003 |
2015-77-00 |
CB&I Power |
Closure of Interim Report Regarding Deviations of Packing Material for Stainless Steel Pipe Spools for Vogtle 3 & 4 and V. C. Summer Units 2 & 3 AP1000 Projects |
11/12/2015 |
ML15331A002 |
2015-76-01 |
WECTEC LLC (Former CB&I) |
Closure of Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project |
07/05/2016 |
ML16197A150 |
2015-76-00 |
CB&I |
Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project |
10/29/2015 |
ML15324A107 |
2015-75-06 |
WECTEC LLC |
Closure of Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
12/19/2016 |
ML17013A024 |
2015-75-05 |
WECTEC LLC |
Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
10/20/2016 |
ML16302A014 |
2015-75-04 |
WECTEC LLC |
Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
08/30/2016 |
ML16252A321 |
2015-75-03 |
WECTEC LLC |
Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
06/27/2016 |
ML16197A151 |
2015-75-02 |
WECTEC LLC |
Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
04/12/2016 |
ML16110A262 |
2015-75-01 |
WECTEC LLC (formerly CB&I Power) |
Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
01/21/2016 |
ML16053A286 |
2015-75-00 |
CB&I |
Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 |
10/29/2015 |
ML15313A496 |
2015-74-00 |
Crane Nuclear, Inc. |
Notification of Pressure Seal Valve Segment Ring Material Compliance |
10/23/2015 |
ML15303A014 |
2015-73-00 |
Engine Systems, Inc. |
Emergency Diesel Generator Speed Switch Capacitor Failure |
10/23/2015 |
ML15314A031 |
2015-72-01 |
Emerson Process Management |
Safety Related TopWorx Switch Misalignment (Updated) |
11/05/2015 |
ML16258A456 |
2015-72-00 |
Emerson Process Management |
Safety Related TopWorx Switch Misalignment |
10/23/2015 |
ML15303A006 |
2015-71-01 |
Waterford 3 |
Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report Supplement) |
12/06/2016 |
ML16341C141 |
2015-71-00 |
Waterford 3 |
Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report) |
10/23/2015 |
ML15303A004 |
2015-70-01 |
Crane Nuclear, Inc. |
Final Report: Pressure Retaining Rings Used in Pressure Seal Valves |
09/30/2015 |
ML15274A062 |
2015-70-00 |
Crane Nuclear, Inc. |
Interim Report: Notification of Retaining Ring Material Compliance |
08/10/2015 |
ML15224A543 |
2015-69-01 |
WECTEC LLC (formerly CB&I Power) |
Part 21 Report Regarding Deviations of Pipe Spools for AP1000 Projects |
02/01/2016 |
ML16039A256 |
2015-69-00 |
CB&I Power |
Interim Part 21 Report Regarding Deviations of Pipe Spools for V. C. Summer Units 2 & 3 AP1000 Project |
09/24/2015 |
ML15279A183 |
2015-68-00 |
Dresden Nuclear Power Station |
Electromagnetic Relief Valve (EMRV) Cutout Switch |
10/07/2015 |
ML15280A387 |
2015-67-00 |
AZZ / Nuclear Logistics, Inc. |
Electronic Position Controller Failed Internal Component |
10/05/2015 |
ML15280A352 |
2015-66-00 |
Westinghouse Electric Company |
Potentially Affected Coils Used in Freedom Size 1 and Size 2 Starters and Contactors |
09/15/2015 |
ML15259A524 |
2015-65-01 |
Emerson Process Management |
Actuator Fail Mode Deviation and Potential Non-Conservative Actuator |
10/30/2015 |
ML15308A582 |
2015-65-00 |
Emerson Process Management |
Interim Report - Actuator Fail Mode Deviation and Potential Non-Conservative Actuator |
09/14/2015 |
ML15259A526 |
2015-64-01 |
SOR Inc. |
Updated Initial Notification of Potential Issue - Irradiation Qualification Testing |
09/21/2015 |
ML15265A418 |
2015-64-00 |
SOR Inc. |
Initial Notification of Potential Issue - Irradiation Qualification Testing |
09/02/2015 |
ML15251A212 |
2015-63-01 |
Furmanite |
Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits |
07/13/2016 |
ML16209A050 |
2015-63-00 |
Furmanite |
Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits |
08/25/2015 |
ML15243A174 |
2015-62-01 |
AREVA TN |
Follow Up Notification of Non-Reportable Condition Regarding NUHOMS® 61 BTH Type 1 Dry Shielded Canister |
11/05/2015 |
ML15317A386 |
2015-62-00 |
AREVA |
Report Regarding Weld Indications Identified on a NUHOMS® 61 BTH Type 1 Dry Shielded Canister |
08/14/2015 |
ML15230A034 |
2015-61-01 |
ATC Nuclear |
Final Report on a Potential Defect on P/N 535-601 Moore Industries Milliamp Modules |
10/09/2015 |
ML15288A199 |
2015-61-00 |
ATC Nuclear |
Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules |
08/10/2015 |
ML15223B263 |
2015-60-01 |
Sequoyah Unit 1 |
Contractor Deviation from Procurement Specifications During Relocation of Reactor Pressure Vessel Material Surveillance Capsules |
09/08/2015 |
ML15254A277 |
2015-60-00 |
Sequoyah |
Damaged Surveillance Capsules |
08/07/2015 |
ML15223B268 |
2015-59-01 |
Xcel Energy/Prairie Island |
Written Notification Related to the Failure of an ABB 50H Instantaneous Over Current Protection Relay |
09/03/2015 |
ML15246A639 |
2015-59-00 |
Xcel Energy/Prairie Island |
ABB 50H Instantaneous Over Current Protection Relay Failure |
08/06/2015 |
ML15223B265 |
2015-58-00 |
ABB Inc. |
Notification of Deviation Regarding HK Circuit Breaker Pivot Pin |
08/06/2015 |
ML15223B264 |
2015-57-03 |
Alpha-Omega Services, Inc |
Final Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H. |
03/16/2016 |
EN 51291 |
2015-57-02 |
Alpha-Omega Services, Inc |
Update to the Interim Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H |
09/02/2015 |
ML15258A352 |
2015-57-01 |
Alpha-Omega Services, Inc |
Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 |
08/07/2015 |
ML15223B267 |
2015-57-00 |
Alpha-Omega Services, Inc |
Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 |
08/05/2015 |
ML15224A541 |
2015-56-00 |
United Controls International |
Ferraz Shawmut / Mersen Fuses P/N AJT25 and AJT60 |
08/04/2015 |
ML15217A303 |
2015-55-00 |
Namco Controls |
Notification of Product Anomaly Related to Namco EA180 & EA170 Limit Switches Manufactured in a Specific Date Range |
07/31/2015 |
ML15217A309 |
2015-54-01 |
Rotork Controls, Inc. |
Updated Interim Report Related to a Safety Related Micro Switch |
09/10/2015 |
ML15259A522 |
2015-54-00 |
Rotork Controls, Inc. |
Interim Report Related to a Safety Related Micro Switch |
07/28/2015 |
ML15226A452 |
2015-53-01 |
CB&I AREVA MOX Services |
Closure of Interim Report Notification: Flanders Filter Housings |
09/09/2015 |
ML15252A090 |
2015-53-00 |
CB&I AREVA MOX Services |
Interim Report Notification: Flanders Filter Housings |
07/23/2015 |
ML15205A290 |
2015-52-00 |
Flowserve |
Mounting Bracket Seismic Qualification |
07/24/2015 |
ML15211A497 |
2015-51-00 |
Flowserve |
Replacement Actuator Shafts for Anchor/Darling 6-900 Swing Check Valves Do Not Meet Dimensional Requirements |
07/24/2015 |
ML15211A496 |
2015-50-02 |
CB&I Power |
Part 21 Report Regarding a Structural Module Piping Penetration for the Vogtle Unit 3 AP1000 Project |
10/29/2015 |
ML15309A008 |
2015-50-01 |
CB&I Power |
Updated Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project |
09/02/2015 |
ML15254A043 |
2015-50-00 |
CB&I Power |
Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project |
07/01/2015 |
ML15201A130 |
2015-49-00 |
United Controls International |
Report of Potential Part 21 on Allen Bradley Time Delay Relay 700-RT |
07/20/2015 |
ML15205A293 |
2015-48-01 |
CB&I Power |
Closure of Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-48-00 |
CB&I Power |
Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project |
06/23/2015 |
ML15197A022 |
2015-47-00 |
CB&I AREVA MOX Services |
Inadequate Welds Affecting Structural Capacity of Embed Plates |
07/15/2015 |
ML15197A039 |
2015-46-02 |
Crane Nuclear, Inc. |
Final Report: Integral Yoke Pressure Retaining Rings Used in Pressure Seal Valves |
09/30/2015 |
ML15274A064 |
2015-46-01 |
Crane Nuclear, Inc. |
Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance |
08/06/2015 |
ML15223B266 |
2015-46-00 |
Crane Nuclear, Inc. |
Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance |
07/08/2015 |
ML15201A287 |
2015-45-00 |
ABB Inc. |
Notification of Deviation Regarding COM-5 Protective Relay - Defective Frame Assembly |
06/29/2015 |
ML15187A029 |
2015-44-02 |
CB&I Power |
Closure of Updated Interim Part 21 Report Regarding Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-44-01 |
CB&I |
Updated Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project |
06/18/2015 |
ML15177A080 |
2015-44-00 |
CB&I
|
Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project |
03/20/2015 |
ML15180A133 |
2015-43-01 |
Electric Power Research Institute (EPRI) |
Final Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections |
07/24/2015 |
ML15205A289 |
2015-43-00 |
Electric Power Research Institute (EPRI) |
Interim Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections |
06/25/2015 |
ML15188A066 |
2015-42-00 |
Summer Units 2 & 3
|
Quality Assurance Programmatic Issues (a 50.55(e) Initial Notification) |
06/16/2015 |
EN 51158 |
2015-41-01 |
GE Hitachi Nuclear Energy |
Closure of Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch |
09/10/2015 |
ML15253A859 |
2015-41-00 |
GE Hitachi Nuclear Energy |
Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch |
06/17/2015 |
ML15169A006 |
2015-40-01 |
CB&I Power |
Closure of Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-40-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project |
05/28/2015 |
ML15159B265 |
2015-39-01 |
Thermo Fisher Scientific |
Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector |
07/01/2015 |
ML15187A031 |
2015-39-00 |
Thermo Fisher Scientific |
Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector |
06/05/2015 |
ML15162A027 |
2015-38-00 |
Engine Systems, Inc. |
Incorrect Part Number Relay Shipped to and Installed in EDG Governor Control Panel at Brunswick Nuclear Plant |
06/05/2015 |
ML15162A023 |
2015-37-01 |
CB&I Power |
Closure of Interim Report Regarding Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects |
11/12/2015 |
ML15331A002 |
2015-37-00 |
Chicago Bridge & Iron |
Interim Report Regardng Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects |
05/28/2015 |
ML15159A312 |
2015-36-00 |
Nutherm International, Inc. |
Report of Potential Part 21 Related to Allen Bradley Time Relay Model 700RTC (See related Part 21 Nos. 2015-33-00 and 2015-26-00).
|
06/04/2015 |
ML15161A230 |
2015-35-00 |
ABB Inc. |
Part 21 Notification of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch |
06/01/2015 |
ML15155A579 |
2015-34-01 |
C&D Technologies, Inc. |
Retraction of Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars |
10/23/2017 |
ML17311A906 |
2015-34-00 |
C&D Technologies, Inc. |
Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars |
05/29/2015 |
ML15155A575 |
2015-33-01 |
Brunswick |
Written Part 21 Notification Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No.'s. 2015-26-00 and 2015-36-00). |
06/25/2015 |
ML15196A034 |
2015-33-00 |
Brunswick |
Part 21 Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No. 2015-26-00). |
05/28/2015 |
ML15155A577 |
2015-32-01 |
CB&I Power |
Closure of Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-32-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project |
05/14/2015 |
ML15146A094 |
2015-31-01 |
AECOM Inc |
30 Day Report Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Supplied Calculations |
06/17/2015 |
ML15168B075 |
2015-31-00 |
AECOM Inc |
Interim Part 21 Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Safety Related Calculations |
05/18/2015 |
ML15147A547 |
2015-30-01 |
Chicago Bridge & Iron
|
Closure of Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects |
06/26/2015 |
ML15188A067 |
2015-30-00 |
Chicago Bridge & Iron
|
Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects |
05/17/2015 |
ML15147A512 |
2015-29-03 |
CB&I Laurens |
Closure of Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects |
09/25/2015 |
ML15279A182 |
2015-29-02 |
CB&I Laurens |
Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects |
07/25/2015 |
ML15217A437 |
2015-29-01 |
CB&I Laurens |
Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects |
06/26/2015 |
ML15188A070 |
2015-29-00 |
CB&I Laurens |
Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects |
04/25/2015 |
ML15132A334 |
2015-28-00 |
BNL Industries, Inc. |
Defect Identified in 6 inch Gear Operated Ball Valves |
05/11/2015 |
ML15140A218 |
2015-27-00 |
QualTech NP |
Potential Part 21 Involving Struthers Dunn Relays With Contact Resistance Greater Than One Ohm |
05/07/2015 |
ML15134A018 |
2015-26-04 |
AZZ/Nuclear Logistics Inc. |
Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Updated) |
08/26/2016 |
ML16243A474 |
2015-26-03 |
AZZ/Nuclear Logistics Inc. |
Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC |
08/15/2016 |
ML16238A186 |
2015-26-02 |
AZZ/Nuclear Logistics Inc. |
Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays |
05/26/2016 |
ML16154A207 |
2015-26-01 |
AZZ / Nuclear Logistics |
Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Update) |
04/08/2016 |
ML16109A177 |
2015-26-00 |
AZZ / Nuclear Logistics |
Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays |
05/01/2015 |
ML15134A016 |
2015-25-01 |
CB&I Power |
Closure of Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Projects |
11/12/2015 |
ML15331A002 |
2015-25-00 |
CB&I Nuclear |
Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Project |
04/24/2015 |
ML15121A186 |
2015-24-00 |
CB&I AREVA MOX Services |
60-Day Interim Report Notification: SMCI Embed Plates |
04/21/2015 |
ML15112A131 |
2015-23-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project (See related 50.55(e) Report No. 2015-0042-00) |
06/16/2015 |
EN 51158 |
2015-23-00 |
CB&I Nuclear |
Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project |
04/16/2015 |
ML15117A100 |
2015-22-01 |
CB&I Nuclear |
Closure of Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 |
06/09/2015 |
ML15173A096 |
2015-22-00 |
CB&I Nuclear |
Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 Project |
03/27/2015 |
ML15097A043 |
2015-21-01 |
CB&I Nuclear |
Closure of Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project |
06/09/2015 |
ML15173A096 |
2015-21-00 |
CB&I Nuclear |
Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project |
03/27/2015 |
ML15097A042 |
2015-20-01 |
United Controls International |
Follow Up to Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module |
03/22/2016 |
ML16098A445 |
2015-20-00 |
United Controls International |
Interim Report - Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module |
03/27/2015 |
ML15089A435 |
2015-19-00 |
Emerson Process Management |
Fisher Type 461 Valve Plug Machining Defect |
03/20/2015 |
ML15089A436 |
2015-18-03 |
Curtiss-Wright Flow Control Corp. |
Update to Notification of a Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves |
02/03/2017 |
ML17039A569 |
2015-18-02 |
Curtiss-Wright Flow Control Corp. |
Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve |
06/30/2015 |
ML15187A172 |
2015-18-01 |
Curtiss-Wright Flow Control Corp. |
Updated Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve |
05/01/2015 |
ML15134A017 |
2015-18-00 |
Curtiss-Wright Flow Control Corp. |
Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve |
03/16/2015 |
ML15077A422 |
2015-17-00 |
Weir Valves & Controls USA Inc. |
Improper Weld Used on Replacement Gate Valve Cover |
03/13/2015 |
ML15077A379 |
2015-16-00 |
CB&I Nuclear |
Interim Report Regarding Overlay Plate Mechanical Coupler Welds for V.C. Summer Unit 2 AP1000 Project |
02/10/2015 |
ML15065A255 |
2015-15-03 |
CB&I Power |
Closure of Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-15-02 |
CB&I Nuclear |
Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project
|
05/19/2015 |
ML15148A573 |
2015-15-01 |
CB&I Nuclear |
Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project
|
03/25/2015 |
ML15092A163 |
2015-15-00 |
CB&I Nuclear |
Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project |
02/19/2015 |
ML15062A595 |
2015-14-01 |
Dominion Power Connecticut (Millstone Unit 3) |
Written Notification Related to Binding in ABB K-Line Secondary Closing Latches (Part Number 716610K01) |
03/13/2015 |
ML15079A398 |
2015-14-00 |
Dominion Power Connecticut |
Defect in ABB K-Line Breaker Replacement (New) Secondary Close Latches |
02/25/2015 |
ML15058A717 |
2015-13-01 |
QualTech NP |
Closure of Potential Defect in a Socket Used Separately on in a Connector Kit |
11/23/2015 |
ML15341A327 |
2015-13-00 |
QualTech NP |
Potential Defect in a Socket Used Separately on in a Connector Kit |
02/23/2015 |
ML15058A716 |
2015-12-02 |
CB&I Nuclear |
Closure of Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project |
06/09/2015 |
ML15173A096 |
2015-12-01 |
CB&I Nuclear |
Updated Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project |
03/30/2015 |
ML15099A504 |
2015-12-00 |
CB&I Nuclear |
Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project |
01/29/2015 |
ML15043A187 |
2015-11-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
06/09/2015 |
ML15173A096 |
2015-11-00 |
CB&I Nuclear |
Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
01/22/2015 |
ML15043A189 |
2015-10-04 |
CB&I Power |
Closure of Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project |
11/12/2015 |
ML15331A002 |
2015-10-03 |
CB&I Nuclear |
Third Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project. |
08/27/2015 |
ML15251A211 |
2015-10-02 |
CB&I Nuclear |
Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project |
06/30/2015 |
ML15190A329 |
2015-10-01 |
CB&I Nuclear |
Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project |
03/20/2015 |
ML15091A345 |
2015-10-00 |
CB&I Nuclear |
Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project |
01/20/2015 |
ML15043A188 |
2015-09-00 |
Summer Units 2 & 3 |
Significant Breakdown in the Quality Assurance (QA) Program of an Agent of the Licensee (a 10CFR 50.55(e) Report) |
02/12/2015 |
ML15054A012 |
2015-08-00 |
Weir Valves and Controls, USA |
TRICENTRIC(r) Triple Offset Valve Spline Adapter Vibrated Loose |
02/10/2015 |
ML15049A456 |
2015-07-00 |
Valcor Engineering Corporation |
Possible NEMA 4 Enclosure Assembly Error In Some Solenoid Valve Models |
02/09/2015 |
ML15049A457 |
2015-06-01 |
Vogtle Units 3 & 4 |
A Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Program (a10 CFR 50.55(e) Written Report) |
02/23/2015 |
ML15055A525 |
2015-06-00 |
Vogtle Units 3 & 4 |
Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Project (a10 CFR 50.55(e) Report) |
02/09/2015 |
EN 50798 |
2015-05-00 |
Thermo Gamma-Metrics LLC |
Shutdown Margin Monitor Environmental Qualification Noncompliance |
02/06/2015 |
ML15049A458 |
2015-04-00 |
Operation Technology, Inc. / ETAP |
Error Report Related to ETAP Power System Analysis Software |
02/03/2015 |
EN 50784 |
2015-03-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
06/09/2015 |
ML15173A096 |
2015-03-00 |
CB&I Nuclear |
Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project |
01/09/2015 |
ML15029A542 |
2015-02-01 |
CB&I Nuclear |
Closure of Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project |
06/09/2015 |
ML15173A096 |
2015-02-00 |
CB&I Nuclear |
Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project. |
01/08/2015 |
ML15022A200 |
2015-01-00 |
AZZ / Nuclear Logistics Inc. |
Report of Potential Failure of GE Hitachi (GEH) SBM Type Switches. |
01/08/2015 |
ML15014A061 |