Log No Notifier Description Report Date Event No. / Accession No.
2015-88-03 CB&I AREVA MOX Services Closure of Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 10/25/2016 ML16299A386
2015-88-02 CB&I AREVA MOX Services Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 07/26/2016 ML16208A315
2015-88-01 CB&I AREVA MOX Services Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 04/26/2016 ML16118A372
2015-88-00 CB&I AREVA MOX Services Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 12/16/2015 ML15351A054
2015-87-03 Homewood Products Corporation Final Report on Part 21 Issue with Irradiations Performed by Steris Isomedix Services 05/13/2016 ML16145A069
2015-87-02 Homewood Products Corporation Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Updated) 03/22/2016 ML16102A078
2015-87-01 Homewood Products Corporation Part 21 Issue on Irradiations performed by Steris Isomedix Services 01/08/2016 ML16012A502
2015-87-00 Homewood Products Corporation Part 21 Issue on Irradiations performed by Steris Isomedix Services (based upon information provided by National Technical Systems) 12/21/2015 ML16004A029
2015-86-02 WECTEC LLC (formerly CB&I Power) Updated Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 03/09/2016 ML16076A263
2015-86-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 02/03/2016 ML16039A257
2015-86-00 CB&I Interim Report Regarding Wall Penetration Corrosion for Vogtle Unit 4 and V.C. Summer Unit 3 AP1000 Projects 12/08/2015 ML16014A712
2015-85-00 Three Mile Island Unit 1 Part 21 Notification Due To Breaker Defect 12/28/2015 ML15363A009
2015-84-01 WECTEC LLC (Former CB&I) Closure of Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-84-00 CB&I Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project 12/10/2015 ML15357A004
2015-83-00 MPR  Associates, Inc. Replacement EDG Timing Module Failure at Hatch Nuclear Plant 12/23/2015 ML16004A030
2015-82-00 Nutherm International, Inc. Potential Part 21 Report Involving Moore Industries RTD Transmitter 12/18/2015 ML15357A041
2015-81-00 Curtiss-Wright QualTech NP Eaton/Cutler Hammer A200 series Starters and Contactors 12/18/2015 ML15357A042
2015-80-00 Howden North America, Inc. Two Fan Motors Were Not Properly Prepared before Small Steel Shot Blasting 12/08/2015 ML15345A390
2015-79-00 United Controls International Improper Silver Plating During Refurbishment of AK-25 Type Circuit Breakers 12/01/2015 ML15341A328
2015-78-02 WECTEC LLC (formerly CB&I Power) Closure of Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-78-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 01/21/2016 ML16053A285
2015-78-00 CB&I Power Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A003
2015-77-00 CB&I Power Closure of Interim Report Regarding Deviations of Packing Material for Stainless Steel Pipe Spools for Vogtle 3 & 4 and V. C. Summer Units 2 & 3 AP1000 Projects 11/12/2015 ML15331A002
2015-76-01 WECTEC LLC (Former CB&I) Closure of Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-76-00 CB&I Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project 10/29/2015 ML15324A107
2015-75-06 WECTEC LLC Closure of Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 12/19/2016 ML17013A024
2015-75-05 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 10/20/2016 ML16302A014
2015-75-04 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 08/30/2016 ML16252A321
2015-75-03 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 06/27/2016 ML16197A151
2015-75-02 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 04/12/2016 ML16110A262
2015-75-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 01/21/2016 ML16053A286
2015-75-00 CB&I Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 10/29/2015 ML15313A496
2015-74-00 Crane Nuclear, Inc. Notification of Pressure Seal Valve Segment Ring Material Compliance 10/23/2015 ML15303A014
2015-73-00 Engine Systems, Inc. Emergency Diesel Generator Speed Switch Capacitor Failure 10/23/2015 ML15314A031
2015-72-01 Emerson Process Management Safety Related TopWorx Switch Misalignment (Updated) 11/05/2015 ML16258A456
2015-72-00 Emerson Process Management Safety Related TopWorx Switch Misalignment 10/23/2015 ML15303A006
2015-71-01 Waterford 3 Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report Supplement) 12/06/2016 ML16341C141
2015-71-00 Waterford 3 Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report) 10/23/2015 ML15303A004
2015-70-01 Crane Nuclear, Inc. Final Report: Pressure Retaining Rings Used in Pressure Seal Valves 09/30/2015 ML15274A062
2015-70-00 Crane Nuclear, Inc. Interim Report: Notification of Retaining Ring Material Compliance 08/10/2015 ML15224A543
2015-69-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Pipe Spools for AP1000 Projects 02/01/2016 ML16039A256
2015-69-00 CB&I Power Interim Part 21 Report Regarding Deviations of Pipe Spools for V. C. Summer Units 2 & 3 AP1000 Project 09/24/2015 ML15279A183
2015-68-00 Dresden Nuclear Power Station Electromagnetic Relief Valve (EMRV) Cutout Switch 10/07/2015 ML15280A387
2015-67-00 AZZ / Nuclear Logistics, Inc. Electronic Position Controller Failed Internal Component 10/05/2015 ML15280A352
2015-66-00 Westinghouse Electric Company Potentially Affected Coils Used in Freedom Size 1 and Size 2 Starters and Contactors 09/15/2015 ML15259A524
2015-65-01 Emerson Process Management Actuator Fail Mode Deviation and Potential Non-Conservative Actuator 10/30/2015 ML15308A582
2015-65-00 Emerson Process Management Interim Report - Actuator Fail Mode Deviation and Potential Non-Conservative Actuator 09/14/2015 ML15259A526
2015-64-01 SOR Inc. Updated Initial Notification of Potential Issue - Irradiation Qualification Testing 09/21/2015 ML15265A418
2015-64-00 SOR Inc. Initial Notification of Potential Issue - Irradiation Qualification Testing 09/02/2015 ML15251A212
2015-63-01 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits 07/13/2016 ML16209A050
2015-63-00 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits 08/25/2015 ML15243A174
2015-62-01 AREVA TN Follow Up Notification of Non-Reportable Condition Regarding NUHOMS® 61 BTH Type 1 Dry Shielded Canister 11/05/2015 ML15317A386
2015-62-00 AREVA Report Regarding Weld Indications Identified on a NUHOMS® 61 BTH Type 1 Dry Shielded Canister 08/14/2015 ML15230A034
2015-61-01 ATC Nuclear Final Report on a Potential Defect on P/N 535-601 Moore Industries Milliamp Modules 10/09/2015 ML15288A199
2015-61-00 ATC Nuclear Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules 08/10/2015 ML15223B263
2015-60-01 Sequoyah Unit 1 Contractor Deviation from Procurement Specifications During Relocation of Reactor Pressure Vessel Material Surveillance Capsules 09/08/2015 ML15254A277
2015-60-00 Sequoyah Damaged Surveillance Capsules 08/07/2015 ML15223B268
2015-59-01 Xcel Energy/Prairie Island Written Notification Related to the Failure of an ABB 50H Instantaneous Over Current Protection Relay 09/03/2015 ML15246A639
2015-59-00 Xcel Energy/Prairie Island ABB 50H Instantaneous Over Current Protection Relay Failure 08/06/2015 ML15223B265
2015-58-00 ABB Inc. Notification of Deviation Regarding HK Circuit Breaker Pivot Pin 08/06/2015 ML15223B264
2015-57-03 Alpha-Omega Services, Inc Final Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H. 03/16/2016 EN 51291
2015-57-02 Alpha-Omega Services, Inc Update to the Interim Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H 09/02/2015 ML15258A352
2015-57-01 Alpha-Omega Services, Inc Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 08/07/2015 ML15223B267
2015-57-00 Alpha-Omega Services, Inc Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 08/05/2015 ML15224A541
2015-56-00 United Controls International Ferraz Shawmut / Mersen Fuses P/N AJT25 and AJT60 08/04/2015 ML15217A303
2015-55-00 Namco Controls Notification of Product Anomaly Related to Namco EA180 & EA170 Limit Switches Manufactured in a Specific Date Range 07/31/2015 ML15217A309
2015-54-01 Rotork Controls, Inc. Updated Interim Report Related to a Safety Related Micro Switch 09/10/2015 ML15259A522
2015-54-00 Rotork Controls, Inc. Interim Report Related to a Safety Related Micro Switch 07/28/2015 ML15226A452
2015-53-01 CB&I AREVA MOX Services Closure of Interim Report Notification: Flanders Filter Housings 09/09/2015 ML15252A090
2015-53-00 CB&I AREVA MOX Services Interim Report Notification: Flanders Filter Housings 07/23/2015 ML15205A290
2015-52-00 Flowserve Mounting Bracket Seismic Qualification 07/24/2015 ML15211A497
2015-51-00 Flowserve Replacement Actuator Shafts for Anchor/Darling 6-900 Swing Check Valves Do Not Meet Dimensional Requirements 07/24/2015 ML15211A496
2015-50-02 CB&I Power Part 21 Report Regarding a Structural Module Piping Penetration for the Vogtle Unit 3 AP1000 Project 10/29/2015 ML15309A008
2015-50-01 CB&I Power Updated Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project 09/02/2015 ML15254A043
2015-50-00 CB&I Power Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project 07/01/2015 ML15201A130
2015-49-00 United Controls International Report of Potential Part 21 on Allen Bradley Time Delay Relay 700-RT 07/20/2015 ML15205A293
2015-48-01 CB&I Power Closure of Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-48-00 CB&I Power Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project 06/23/2015 ML15197A022
2015-47-00 CB&I AREVA MOX Services Inadequate Welds Affecting Structural Capacity of Embed Plates 07/15/2015 ML15197A039
2015-46-02 Crane Nuclear, Inc. Final Report: Integral Yoke Pressure Retaining Rings Used in Pressure Seal Valves 09/30/2015 ML15274A064
2015-46-01 Crane Nuclear, Inc. Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance 08/06/2015 ML15223B266
2015-46-00 Crane Nuclear, Inc. Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance 07/08/2015 ML15201A287
2015-45-00 ABB Inc. Notification of Deviation Regarding COM-5 Protective Relay - Defective Frame Assembly 06/29/2015 ML15187A029
2015-44-02 CB&I Power Closure of Updated Interim Part 21 Report Regarding Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 11/12/2015 ML15331A002
2015-44-01 CB&I Updated Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 06/18/2015 ML15177A080
2015-44-00

CB&I

Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 03/20/2015 ML15180A133
2015-43-01 Electric Power Research Institute (EPRI) Final Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections 07/24/2015 ML15205A289
2015-43-00 Electric Power Research Institute (EPRI) Interim Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections 06/25/2015 ML15188A066
2015-42-00

Summer Units 2 & 3

Quality Assurance Programmatic Issues (a 50.55(e) Initial Notification) 06/16/2015 EN 51158
2015-41-01 GE Hitachi Nuclear Energy Closure of Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch 09/10/2015 ML15253A859
2015-41-00 GE Hitachi Nuclear Energy Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch 06/17/2015 ML15169A006
2015-40-01 CB&I Power Closure of Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-40-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project 05/28/2015 ML15159B265
2015-39-01 Thermo Fisher Scientific Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector 07/01/2015 ML15187A031
2015-39-00 Thermo Fisher Scientific Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector 06/05/2015 ML15162A027
2015-38-00 Engine Systems, Inc. Incorrect Part Number Relay Shipped to and Installed in EDG Governor Control Panel at Brunswick Nuclear Plant 06/05/2015 ML15162A023
2015-37-01 CB&I Power Closure of Interim Report Regarding Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects 11/12/2015 ML15331A002
2015-37-00 Chicago Bridge & Iron Interim Report Regardng Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects 05/28/2015 ML15159A312
2015-36-00 Nutherm International, Inc.

Report of Potential Part 21 Related to Allen Bradley Time Relay Model 700RTC (See related Part 21 Nos. 2015-33-00 and 2015-26-00).

06/04/2015 ML15161A230
2015-35-00 ABB Inc. Part 21 Notification of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 06/01/2015 ML15155A579
2015-34-01 C&D Technologies, Inc. Retraction of Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars 10/23/2017 ML17311A906
2015-34-00 C&D Technologies, Inc. Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars 05/29/2015 ML15155A575
2015-33-01 Brunswick Written Part 21 Notification Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No.'s. 2015-26-00 and 2015-36-00). 06/25/2015 ML15196A034
2015-33-00 Brunswick Part 21 Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No. 2015-26-00). 05/28/2015 ML15155A577
2015-32-01 CB&I Power Closure of Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-32-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project 05/14/2015 ML15146A094
2015-31-01 AECOM Inc 30 Day Report Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Supplied Calculations 06/17/2015 ML15168B075
2015-31-00 AECOM Inc Interim Part 21 Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Safety Related Calculations 05/18/2015 ML15147A547
2015-30-01

Chicago Bridge & Iron

Closure of Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects 06/26/2015 ML15188A067
2015-30-00

Chicago Bridge & Iron

Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects 05/17/2015 ML15147A512
2015-29-03 CB&I Laurens Closure of Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 09/25/2015 ML15279A182
2015-29-02 CB&I Laurens Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 07/25/2015 ML15217A437
2015-29-01 CB&I Laurens Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 06/26/2015 ML15188A070
2015-29-00 CB&I Laurens Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 04/25/2015 ML15132A334
2015-28-00 BNL Industries, Inc. Defect Identified in 6 inch Gear Operated Ball Valves 05/11/2015 ML15140A218
2015-27-00 QualTech NP Potential Part 21 Involving Struthers Dunn Relays With Contact Resistance Greater Than One Ohm 05/07/2015 ML15134A018
2015-26-04 AZZ/Nuclear Logistics Inc. Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Updated) 08/26/2016 ML16243A474
2015-26-03 AZZ/Nuclear Logistics Inc. Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC 08/15/2016 ML16238A186
2015-26-02 AZZ/Nuclear Logistics Inc. Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays 05/26/2016 ML16154A207
2015-26-01 AZZ / Nuclear Logistics Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Update) 04/08/2016 ML16109A177
2015-26-00 AZZ / Nuclear Logistics Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays 05/01/2015 ML15134A016
2015-25-01 CB&I Power Closure of Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Projects 11/12/2015 ML15331A002
2015-25-00 CB&I Nuclear Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Project 04/24/2015 ML15121A186
2015-24-00 CB&I AREVA MOX Services 60-Day Interim Report Notification: SMCI Embed Plates 04/21/2015 ML15112A131
2015-23-01 CB&I Nuclear Closure of Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project (See related 50.55(e) Report No. 2015-0042-00) 06/16/2015 EN 51158
2015-23-00 CB&I Nuclear Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project 04/16/2015 ML15117A100
2015-22-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 06/09/2015 ML15173A096
2015-22-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 Project 03/27/2015 ML15097A043
2015-21-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project 06/09/2015 ML15173A096
2015-21-00 CB&I Nuclear Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project 03/27/2015 ML15097A042
2015-20-01 United Controls International Follow Up to Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module 03/22/2016 ML16098A445
2015-20-00 United Controls International Interim Report - Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module 03/27/2015 ML15089A435
2015-19-00 Emerson Process Management Fisher Type 461 Valve Plug Machining Defect 03/20/2015 ML15089A436
2015-18-03 Curtiss-Wright Flow Control Corp. Update to Notification of a Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves 02/03/2017 ML17039A569
2015-18-02 Curtiss-Wright Flow Control Corp. Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 06/30/2015 ML15187A172
2015-18-01 Curtiss-Wright Flow Control Corp. Updated Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 05/01/2015 ML15134A017
2015-18-00 Curtiss-Wright Flow Control Corp. Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 03/16/2015 ML15077A422
2015-17-00 Weir Valves & Controls USA Inc. Improper Weld Used on Replacement Gate Valve Cover 03/13/2015 ML15077A379
2015-16-00 CB&I Nuclear Interim Report Regarding Overlay Plate Mechanical Coupler Welds for V.C. Summer Unit 2 AP1000 Project 02/10/2015 ML15065A255
2015-15-03 CB&I Power Closure of Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-15-02 CB&I Nuclear

Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project

05/19/2015 ML15148A573
2015-15-01 CB&I Nuclear

Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project

03/25/2015 ML15092A163
2015-15-00 CB&I Nuclear Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project 02/19/2015 ML15062A595
2015-14-01 Dominion Power Connecticut (Millstone Unit 3) Written Notification Related to Binding in ABB K-Line Secondary Closing Latches (Part Number 716610K01) 03/13/2015 ML15079A398
2015-14-00 Dominion Power Connecticut Defect in ABB K-Line Breaker Replacement (New) Secondary Close Latches 02/25/2015 ML15058A717
2015-13-01 QualTech NP Closure of Potential Defect in a Socket Used Separately on in a Connector Kit 11/23/2015 ML15341A327
2015-13-00 QualTech NP Potential Defect in a Socket Used Separately on in a Connector Kit 02/23/2015 ML15058A716
2015-12-02 CB&I Nuclear Closure of Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-12-01 CB&I Nuclear Updated Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 03/30/2015 ML15099A504
2015-12-00 CB&I Nuclear Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 01/29/2015 ML15043A187
2015-11-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-11-00 CB&I Nuclear Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project 01/22/2015 ML15043A189
2015-10-04 CB&I Power Closure of Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 11/12/2015 ML15331A002
2015-10-03 CB&I Nuclear Third Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project. 08/27/2015 ML15251A211
2015-10-02 CB&I Nuclear Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 06/30/2015 ML15190A329
2015-10-01 CB&I Nuclear Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 03/20/2015 ML15091A345
2015-10-00 CB&I Nuclear Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 01/20/2015 ML15043A188
2015-09-00 Summer Units 2 & 3 Significant Breakdown in the Quality Assurance (QA) Program of an Agent of the Licensee (a 10CFR 50.55(e) Report) 02/12/2015 ML15054A012
2015-08-00 Weir Valves and Controls, USA TRICENTRIC(r) Triple Offset Valve Spline Adapter Vibrated Loose 02/10/2015 ML15049A456
2015-07-00 Valcor Engineering Corporation Possible NEMA 4 Enclosure Assembly Error In Some Solenoid Valve Models 02/09/2015 ML15049A457
2015-06-01 Vogtle Units 3 & 4 A Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Program (a10 CFR 50.55(e) Written Report) 02/23/2015 ML15055A525
2015-06-00 Vogtle Units 3 & 4 Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Project (a10 CFR 50.55(e) Report) 02/09/2015 EN 50798
2015-05-00 Thermo Gamma-Metrics LLC Shutdown Margin Monitor Environmental Qualification Noncompliance 02/06/2015 ML15049A458
2015-04-00 Operation Technology, Inc. / ETAP Error Report Related to ETAP Power System Analysis Software 02/03/2015 EN 50784
2015-03-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-03-00 CB&I Nuclear Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project 01/09/2015 ML15029A542
2015-02-01 CB&I Nuclear Closure of Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project 06/09/2015 ML15173A096
2015-02-00 CB&I Nuclear Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project. 01/08/2015 ML15022A200
2015-01-00 AZZ / Nuclear Logistics Inc. Report of Potential Failure of GE Hitachi (GEH) SBM Type Switches. 01/08/2015 ML15014A061