Power Reactor Status Report for April 16, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 04/12/1999 MAINTENANCE OUTAGE    
BEAVER VALLEY 2 72   INCREASING POWER *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 REFUELING OUTAGE - DEFUELED    
FITZPATRICK 1 100        
GINNA 1 0 03/01/1999 REFUELING OUTAGE    
HOPE CREEK 1 100        
INDIAN POINT 2 99   MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 80   COASTDOWN TO REFUELING OUTAGE *  
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 0 04/11/1999 REFUELING OUTAGE    
NINE MILE POINT 2 100        
OYSTER CREEK 1 85   PERFORMING MAINTENANCE ON RECIRC MOTOR GENERATOR SET *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 80   INOPERABLE MAIN STEAM ISOLATION VALVE    
SALEM 1 100        
SALEM 2 0 04/03/1999 REFUELING OUTAGE    
SEABROOK 1 0 03/27/1999 REFUELING OUTAGE - DEFUELED    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/12/1999 REFUELING OUTAGE    
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 0 04/11/1999 REFUELING OUTAGE    
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 92   COASTDOWN TO REFUELING OUTAGE *  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 50   REPAIRING A LEAK IN A FEEDWATER VENT LINE *  
FARLEY 1 100        
FARLEY 2 50   OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD    
HARRIS 1 100        
HATCH 1 0 03/01/1999 REFUELING OUTAGE    
HATCH 2 98   MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION AFTER PERFORMA    
MCGUIRE 1 100        
MCGUIRE 2 36   STARTUP TESTING *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 62   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 0 04/03/1999 REFUELING OUTAGE    
SURRY 1 100        
SURRY 2 67   COASTDOWN TO REFUELING OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 21   STARTUP TESTING *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 04/15/1999 PLANT SHUTDOWN FROM 12% POWER WHILE STARTING UP ON 04/15/99 DUE TO CONTROL B *  
BYRON 1 0 03/27/1999 REFUELING OUTAGE    
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 100     *  
DRESDEN 3 99        
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 98        
LASALLE 1 100        
LASALLE 2 75   INCREASING POWER *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 0 03/26/1999 REFUELING OUTAGE    
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 04/09/1999 MAINTENANCE OUTAGE    
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 03/20/1999 REFUELING OUTAGE    
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 0 03/26/1999 REFUELING OUTAGE - DEFUELED    
PALO VERDE 3 100        
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE    
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 03/27/1999 REFUELING OUTAGE - DEFUELED    
SOUTH TEXAS 1 0 03/26/1999 REFUELING OUTAGE - DEFUELED    
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 85   LOAD FOLLOWING    
WATERFORD 3 100        
WOLF CREEK 1 0 04/03/1999 REFUELING OUTAGE - DEFUELED *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Tuesday, March 09, 2021