Power Reactor Status Report for October 11, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 85   CLEANING MAIN CONDENSER WATER BOXES *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 0 08/31/1999 MAINTENANCE OUTAGE    
INDIAN POINT 3 0 09/10/1999 REFUELING OUTAGE    
LIMERICK 1 100     *  
LIMERICK 2 100     *  
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 0 10/09/1999 MAINTENANCE OUTAGE - REPAIRING RECIRCULATION PUMP SEALS    
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 0 09/29/1999 REFUELING OUTAGE    
PILGRIM 1 100        
SALEM 1 0 09/17/1999 REFUELING OUTAGE    
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 0 09/10/1999 REFUELING OUTAGE    
VERMONT YANKEE 1 97   COASTDOWN TO REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100     *  
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 0 10/01/1999 REFUELING OUTAGE    
FARLEY 1 100        
FARLEY 2 64   COASTDOWN TO REFUELING OUTAGE    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98        
MCGUIRE 1 0 09/17/1999 REFUELING OUTAGE - DEFUELED    
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 30   STARTUP TESTING *  
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 0 09/24/1999 REFUELING OUTAGE - DEFUELED    
SAINT LUCIE 1 0 09/12/1999 REFUELING OUTAGE    
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100     *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 0 10/03/1999 REFUELING OUTAGE    
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 99   COASTDOWN TO REFUELING OUTAGE *  
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 0 10/01/1999 REFUELING OUTAGE    
DRESDEN 3 100        
DUANE ARNOLD 1 94   COASTDOWN TO REFUELING OUTAGE *  
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 53   COASTDOWN TO REFUELING OUTAGE *  
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 79   LOAD FOLLOWING *  
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 38   STARTUP TESTING *  
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 10/02/1999 REFUELING OUTAGE - DEFUELED *  
COMANCHE PEAK 1 0 09/24/1999 REFUELING OUTAGE- DEFUELED    
COMANCHE PEAK 2 99        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 09/25/1999 REFUELING OUTAGE - DEFUELED    
FT CALHOUN 1 0 10/01/1999 REFUELING OUTAGE    
GRAND GULF 1 100        
PALO VERDE 1 0 10/02/1999 REFUELING OUTAGE    
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 87   COASTDOWN TO REFUELING OUTAGE *  
WASHINGTON NUCLEAR 2 0 09/18/1999 REFUELING OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Tuesday, March 09, 2021