Power Reactor Status Report for January 11, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 97   INCREASING POWER FOLLOWING SCRAM TIME TESTING *  
GINNA 1 100        
HOPE CREEK 1 98   ROD PATTERN ADJUSTMENT *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 98     *  
LIMERICK 2 4   HOLDING FOR GROUND TROUBLESHOOTING *  
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 0 01/06/2000 PREPARATION FOR GOING TO MODE 3 *  
SALEM 2 100        
SEABROOK 1 17   INCREASING POWER *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100     *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 95   HOLDING FOR XENON TO BUILD *  
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 01/05/2000 REFUELING OUTAGE    
PALISADES 1 75   CHEMISTRY HOLD    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 88   COASTDOWN TO REFUELING OUTAGE *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 0 01/07/2000 SHUTDOWN TO REPLACE THE ANTI-ROTATION DEVICE ON THE "D" RCP    
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 01/08/2000 AUX COOLING SYSTEM LEAK INTO THE DRYWELL ISOLATED AND PLANT PREPARING FOR STARTUP *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 0 01/05/2000 MAINTENANCE OUTAGE    
PALO VERDE 3 100        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Tuesday, March 09, 2021