Power Reactor Status Report for April 15, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 84   HOLDING POWER AT THIS LEVEL TO PERFORM FLUX MAPPING AFTER EXITING A REFUELING OUTAGE *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 03/10/2000 REFUELING OUTAGE    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100     *  
GINNA 1 100        
HOPE CREEK 1 97   COASTDOWN TO REFUELING OUTAGE *  
INDIAN POINT 2 0 02/15/2000 MAINTENANCE OUTAGE    
INDIAN POINT 3 100        
LIMERICK 1 0 03/29/2000 REFUELING OUTAGE - LPRM REPLACEMENT IN PROGRESS *  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 0 03/03/2000 REFUELING OUTAGE    
OYSTER CREEK 1 100        
PEACH BOTTOM 2 71   HOLDING POWER AT THIS LEVEL TO PERFORM A ROD PATTERN ADJUSTMENT *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 0 04/12/2000 MANUAL REACTOR TRIP, EVENT #36882    
SALEM 2 46   DECREASING POWER TO 45% TO PERFORM TURBINE VALVE TESTING *  
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/18/2000 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 80   COASTDOWN TO REFUELING OUTAGE *  
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/04/2000 REFUELING OUTAGE - DEFUELED    
FARLEY 2 100        
HARRIS 1 0 04/15/2000 ENTERING REFUELING OUTAGE *  
HATCH 1 100        
HATCH 2 90   HOLDING POWER AT THIS LEVEL TO PERFORM STARTUP TESTING AND EHC TESTING AFTER EXITING A REFUELING OUTAGE *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/12/2000 REFUELING OUTAGE    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 52   DECREASING POWER TO 35% FOR REPLACEMENT OF RCS LOOP FLOW TRANSMITTERS *  
SURRY 1 75   COASTDOWN TO REFUELING OUTAGE    
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - REFUELED - FINISHING CORE ASSEMBLY *  
DAVIS BESSE 1 0 03/31/2000 REFUELING OUTAGE - DEFUELED    
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 0 04/01/2000 REFUELING OUTAGE - FIRST OF TWO FUEL SHUFFLES COMPLETE - CONTROL ROD BLADE SHUFFLE IN PROGRESS *  
KEWAUNEE 1 97        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 71   HOLDING POWER AT THIS LEVEL TO PERFORM FUEL LEAK LOCALIZATION ACTIVITIES *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 REFUELING OUTAGE    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 99     *  
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 99   HOLDING POWER AT THIS LEVEL TO PERFORM HIGH RATE BLOWDOWNS *  
PALO VERDE 3 0 04/14/2000 REFUELING OUTAGE - DEFUELED    
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/01/2000 REFUELING OUTAGE - DEFUELED - REPLACING STEAM GENERATORS    
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 60   LOAD FOLLOWING    
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Tuesday, March 09, 2021