News Releases - 2001

JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember

 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 

December
Date Document Number Description
12/31/2001 IV-01-054 NRC Cites Energy Northwest for Safety Violation at Columbia Generating Station
12/31/2001 01-138 NRC Announces Availability of License Renewal Application for St. Lucie Units 1 and 2
12/31/2001 01-137 NRC Advisory Committee on Nuclear Waste to Meet January 8 - 9 in Rockville, Maryland
12/27/2001 III-01-057 NRC Staff Proposes $3,000 Fine Against the University of Wisconsin-Madison for Loss of Nuclear Device
12/26/2001 II-01-050 NRC Determines Surry Nuclear Plant Diesel Generator Issue to Be of Low to Moderate Safety Significance
12/26/2001 01-136 NRC Approves Power Uprates for Dresden 2, 3 and Quad Cities 1, 2
12/20/2001 01-135 NRC Offers to Supply Potassium Iodide to States that Request It
12/18/2001 I-01-071 NRC Suspends License of Pennsylvania Medical Firm
12/14/2001 IV-01-053 NRC Staff to Hold Regulatory Conference with Nebraska Public Power District
12/13/2001 01-134 NRC Seeks Public Comment on Use of Alternate Dispute Resolution in its Enforcement Policy
12/12/2001 I-01-070 NRC, Entergy to Discuss Performance Issues at Indian Point 2
12/10/2001 II-01-049 Prehearing Conference Scheduled on McGuire and Catawba Nuclear Plant License Renewal
12/07/2001 I-01-069 NRC Assigns New Resident Inspector at Oyster Creek Nuclear Plant
12/07/2001 III-01-056 NRC Staff to Meet with U.S. Enrichment Corp. on Possible Safety Violations
12/07/2001 II-01-048 NRC to Receive Comments on Draft Decommissioning Document December 12 in Atlanta
12/06/2001 I-01-068 NRC Issues Confirmatory Action Letter to Easton, Pa., Medical Firm
12/04/2001 IV-01-052 NRC Proposes $3,000 Fine for Centennial Engineering & Research, Inc.
12/04/2001 I-01-067 NRC to Receive Comments on Draft Decommissioning Document at Public Meeting Scheduled for December 10 in Boston
12/03/2001 I-01-066 3rd Library to Make Available Peach Bottom License Renewal Information
November
Date Document Number Description
11/30/2001 01-133 NRC Releases Draft Review Plan for Yucca Mountain
11/30/2001 III-01-055 NRC Seeks Comments on Draft Supplement to Environmental Statement on Decommissioning of Nuclear Facilities; Meeting Dec. 6
11/27/2001 IV-01-051 NRC Seeks Comments on Draft Supplement to Environmental Statement on Decommissioning of Nuclear Facilities
11/26/2001 I-01-065 NRC, Company to Discuss Cleanup Plan for Greenville, Pa., Site
11/26/2001 II-01-047 NRC Staff to Hold Regulatory Conference with Virginia Power
11/23/2001 01-132 NRC Advisory Committee on Reactor Safeguards To Meet December 5 - 8 in Rockville, Maryland
11/21/2001 IV-01-050 NRC to Hold Regulatory Conference with Energy Northwest
11/21/2001 III-01-054 NRC Staff to Meet with Nuclear Management Co. Nov. 27 to Discuss Safety Significance of Diesel Problem at Minnesota Plant
11/20/2001 III-01-053 NRC Names New Resident Inspector at Byron Nuclear Power Plant
11/20/2001 01-131 NRC Invites Nominations for Advisory Committee on Medical Uses of Isotopes
11/19/2001 III-01-052 NRC Staff Proposes $3,000 Fine Against a Missouri Company for Loss of Nuclear Gauge
11/16/2001 01-130 NRC Issues Draft Supplement to Final Environmental Statement on Decommissioning of Nuclear Facilities
11/15/2001 II-01-046 NRC Commissioner to Speak on Nuclear Security at University of Florida on November 17
11/14/2001 II-01-045 NRC Commissioner to Visit St. Lucie Nuclear Plant on November 16
11/13/2001 01-129 NRC Submits Comments to DOE on Yucca Mountain Information
11/13/2001 01-128 NRC Advisory Committee on Nuclear Waste to Meet November 27 - 29 in Rockville, Maryland
11/09/2001 III-01-051 NRC Names New Resident Inspector at Perry Nuclear Power Plant
11/09/2001 III-01-050 NRC Staff Proposes $3,000 Fine Against Wisconsin Company for Loss of Nuclear Gauge
11/07/2001 01-127 NRC Approves Power Uprate for Duane Arnold Nuclear Plant
11/06/2001 III-01-049 NRC Staff Proposes $3,000 Fine Against Palmerton & Parrish, Inc. of Missouri for Failing to Control Licensed Material
October
Date Document Number Description
10/29/2001 I-01-063 NRC Sends Special Inspection Team to TMI
10/29/2001 I-01-062 Two Gauges Containing Radioactive Material Reported Stolen in Greater Philadelphia Region
10/29/2001 III-01-048 NRC Cites Nuclear Management Company for Safety Violation at Palisades Nuclear Plant
10/26/2001 I-01-061 NRC Seeks Public Input on Environmental Statement for Proposed Peach Bottom Nuclear Power Plant License Renewal
10/23/2001 01-126 NRC Concurs on Doe's Proposed Final Siting Guidelines for Yucca Mountain
10/23/2001 III-01-047 NRC Staff Proposes $3,000 Fine Against the University of Missouri-Columbia for Violating Regulations
10/22/2001 01-125 NRC Advisory Committee on Reactor Safeguards to Meet November 8 - 10 in Rockville, Maryland
10/18/2001 01-124 Threat to Three Mile Island Nuclear Plant Deemed Non-Credible; NRC Monitoring Continues and Website Restored
10/16/2001 II-01-044 NRC to Hold Public Meetings on Catawba Nuclear Station License Renewal
10/16/2001 II-01-043 NRC to Hold Regulatory Performance Meeting with Duke at Oconee Nuclear Power Plant on October 19
10/16/2001 01-123 NRC Approves Power Uprate for Shearon Harris Nuclear Power Plant
10/16/2001 II-01-042 NRC Staff Proposes $88,000 Civil Penalty Against TVA based upon Department of Labor Finding of Discrimination
10/15/2001 01-122 NRC Approves Power Uprate for Comanche Peak Nuclear Power Plant
10/11/2001 01-121 NRC Seeks Early Public Comment on a Proposal to Permit Entombment for Reactor Decommissioning
10/11/2001 II-01-041 NRC to Hold Public Meetings on North Anna Power Station License Renewal
10/05/2001 I-01-06 NRC to Send Special Inspection to Millstone 1 to Evaluate Investigation into Missing Spent Fuel
10/04/2001 01-120 NRC Issues Final Rule on Storage of Certain "Greater than Class C" Waste in an Independent Spent Fuel Storage Facility
10/04/2001 01-119 29th Annual Nuclear Safety Research Conference to Be Held October 22 - 24 in Washington, D.C.
10/03/2001 01-118 Commissioner Dr. Nils J. Diaz to Be Sworn in for Second Term
10/03/2001 II-01-040 NRC Proposes $2,750 Civil Penalty Against Puerto Rico Laboratory for Violation of NRC Radiological Safety Requirements
10/03/2001 III-01-046 NRC Names New Senior Resident Inspector at Paducah Gaseous Diffusion Plant
10/02/2001 01-117 NRC Amends Regulations to Allow Use of Simulators to Fulfill Portion of Reactor Operator Training Requirements
10/02/2001 01-116 NRC Seeks Public Comment on Proposed Rule Concerning Debt Collection Procedures
September
Date Document Number Description
09/28/2001 IV-01-049 NRC Proposes $3,000 Fine for Construction Engineering Labs, Inc.
09/28/2001 IV-01-048 NRC Names Grant F. Larkin Resident Inspector at Waterford 3
09/28/2001 01-115 NRC Will Hold Public Meeting October 2 in Tennessee to Discuss DOE Tritium Production Program
09/26/2001 I-01-059 NRC Proposes to Fine New Jersey Hospital $3,000 for Violations of NRC Requirements
09/26/2001 III-01-045 NRC Staff Proposes $17,600 Fine Against Ohio Environmental Services Company for Violating Regulations
09/25/2001 01-114 NRC Approves Power Uprate for Beaver Valley Power Station in Pennsylvania
09/24/2001 I-01-058 NRC to Discuss Emergency Preparedness Issues, Improvements Regarding Limerick and Peach Bottom Nuclear Power Plants
09/24/2001 01-113 NRC Advisory Committee on Reactor Safeguards to Meet October 4-6 in Rockville, Maryland
09/21/2001 01-112 NRC Reacts to Terrorist Attacks
09/21/2001 01-111 NRC Receives Application from TVA to Produce Tritium at Watts Bar Nuclear Power Plant in Tennessee
09/20/2001 II-01-039 Atomic Safety and Licensing Board to Hold Prehearing Conference in North Augusta on September 21 on Proposed Fuel Facility
09/20/2001 I-01-057 NRC Issues Finding of Substantial Importance to Safety to Calvert Cliffs Nuclear Power Plant
09/20/2001 01-110 NRC Prohibits a Former Radiation Safety Officer from Participating in NRC-Licensed Activity for Five Years
09/19/2001 III-01-044 NRC Issues Finding of Low to Moderate Safety Significance on Fermi Nuclear Plant Violation
09/14/2001 I-01-056 NRC Issues Finding of Low to Moderate Safety Significance to Susquehanna Nuclear Plan
09/14/2001 III-01-043 NRC Staff Proposes $11,000 Fine for Radiation Overexposure Last Year at Southeast Missouri State University
09/11/2001 01-109 NRC Urges Increased Security
09/07/2001 II-01-038 NRC to Hold Public Meetings on McGuire Nuclear Station License Renewal
09/07/2001 01-108 NRC Revises Regulations for a Possible Licensing Decision on a Potential Radioactive Waste Repository in Nevada
09/05/2001 II-01-037 NRC Staff to Hold Public Meeting at Turkey Point to Discuss Inspection of Plant’s License Renewal Program
August
Date Document Number Description
08/31/2001 IV-01-047 NRC Names Leonard M. Willoughby Resident Inspector at Ft. Calhoun
08/31/2001 01-107 NRC Announces Opportunity for Hearing on License Renewal for Pennsylvania's Peach Bottom Atomic Power Station
08/30/2001 I-01-055 NRC Determines Inspection Finding for Oyster Creek Nuclear Plant to Be of Low to Moderate Safety Significance
08/28/2001 III-01-042 NRC Cites Clinton Plant for Emergency Preparedness Violation of Low to Moderate Safety Significance
08/27/2001 01-106 NRC Staff Approves Transfer of Operating Licenses For Indian Point 1 and 2 to Entergy Corporation
08/24/2001 I-01-054 NRC Proposes $8,800 Civil Penalty for Pittsburgh Medical Facility
08/23/2001 I-01-053 NRC Cites Exelon Nuclear Generation Company for Violation of Low to Moderate Risk Significance at Peach Bottom
08/23/2001 II-01-036 NRC to Hold Public Meetings on Surry Nuclear Station License Renewal
08/23/2001 01-105 NRC Advisory Committee on Reactor Safeguards to Meet September 5 - 8 in Rockville, Maryland
08/22/2001 IV-01-046 Michael S. Peck Named Resident Inspector at Columbia Generating Station
08/22/2001 I-01-052 NRC Issues Notices of Violations Following Investigation of Improper Efforts to Dispose of Waste from New Jersey Center
08/20/2001 II-01-035 NRC Determines Farley Nuclear Plant Security Issue to Be of Low to Moderate Safety Significance
08/17/2001 01-104 NRC Invites Public to Submit Nominations for the Advisory Committee on Nuclear Waste
08/16/2001 IV-01-045 NRC Plans Additional Inspection at Cooper Due to Failure to Correct Exercise Errors
08/15/2001 01-103 NRC Announces Opportunity for Hearing for License Renewal Applications for McGuire, Catawba Nuclear Power Plants
08/13/2001 01-102 NRC Advisory Committee on Nuclear Waste Elects Chairman and Vice Chairman
08/13/2001 II-01-034 NRC Schedules Conference to Discuss Summer Nuclear Plant
08/10/2001 I-01-051 NRC to Hold Public Meeting on Inspection Programs for Steam Generators at Salem Nuclear Plant
08/10/2001 01-101 NRC Advisory Committee on Nuclear Waste to Meet August 28 - 30 in Rockville, Maryland
08/10/2001 01-100 NRC Introduces New Version of ADAMS Based on Public Comment, Operational Experience
08/09/2001 01-099 NRC Comments on GAO Report on Indian Point 2 Emergency Preparedness
08/08/2001 01-098 NRC Seeks Public Comment on Proposed Rule Allowing Parts of Reactor Sites to Be Released for Unrestricted Use
08/08/2001 IV-01-044 NRC Appoints Jeffrey Cruz Resident Inspector at Wolf Creek
08/08/2001 IV-01-043 Richard W. Deese Named NRC Resident Inspector at Grand Gulf Nuclear Station
08/08/2001 I-01-050 NRC Discrimination Task Group to Hold Meeting in Waterford, Conn.
08/07/2001 01-097 NRC Names Stephen L. Rosen to Advisory Committee on Reactor Safeguards
08/03/2001 01-096 NRC Asks for Information from Certain Nuclear Plant Licensees on Reactor Vessels
08/02/2001 IV-01-042 NRC Discrimination Task Group to Hold Meeting in San Luis Obispo
08/01/2001 I-01-049 NRC Assigns New Resident Inspector to Calvert Cliffs Nuclear Plant
July
Date Document Number Description
07/31/2001 IV-01-041 Donald B. Allen Named NRC Senior Resident Inspector at Comanche Peak
07/31/2001 01-095 NRC Approves Power Uprate for Hope Creek Nuclear Power Plant in New Jersey
07/31/2001 01-094 NRC Licensing Support Network Advisory Review Panel to Meet August 8 in Las Vegas
07/30/2001 II-01-033 NRC Holds Public Meetings at Global Nuclear Fuel Plant August 7 to Discuss Plant Performance and Revised NRC Oversight Program
07/24/2001 IV-01-040 NRC Plans Additional Inspection at Callaway Nuclear Power Plant Due to Performance Deficiency
07/24/2001 III-01-041 NRC Staff Proposes $3,000 Fine Against Midwest Testing, Inc. of Missouri for Failing to Control Licensed Material
07/24/2001 III-01-040 NRC Names New Senior Resident Inspector at Quad Cities Nuclear Power Plant
07/23/2001 01-093 NRC Announces Opportunity for Hearing for License Renewal Applications for North Anna, Surry
07/23/2001 01-092 NRC Announces Availability of License Renewal Application for Peach Bottom Atomic Power Station
07/23/2001 01-091 NRC to Meet with Public on July 31 to Discuss Use of Risk Information in Regulating Nuclear Waste and Materials
07/20/2001 II-01-032 NRC Plans Additional Inspection at Oconee Nuclear Power Plant Due to Multiple Performance Deficiencies
07/19/2001 01-090 NRC to Meet with Proposed Mixed Oxide Fuel Facility Applicant to Discuss NRC Requests for Additional Information
07/16/2001 IV-01-039 NRC Monitors Ammonia Leak Near Waterford 3 Nuclear Plant
07/16/2001 01-088 NRC Approves Guidance Documents for License Renewal
07/16/2001 01-087 NRC Announces Availability of License Renewal Applications for Catawba, McGuire
07/13/2001 III-01-039 NRC To Meet with Exelon Company to Discuss Safety Performance at the Quad Cities Nuclear Station
07/13/2001 I-01-048 NRC to Meet with Dominion Nuclear Connecticut to Discuss Performance at Millstone Units 2 and 3 Nuclear Power Plants
07/13/2001 01-086 NRC Approves Power Uprate for Susquehanna Facility in Pennsylvania
07/12/2001 IV-01-038 NRC to Meet with Ameren/UE To Discuss Safety Performance at Callaway Nuclear Station
07/10/2001 III-01-038 NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Monticello Nuclear Power Plant
07/09/2001 01-085 NRC Schedules Public Workshop on Possible New Reactor Applications
07/09/2001 01-084 NRC Proposes Amending Skin Dose Limit for Workers at Nuclear Facilities
07/09/2001 II-01-031 NRC to Meet with SCE&G Officials to Discuss Safety Performance at Summer Nuclear Power Plant
07/09/2001 II-01-030 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Vogtle Nuclear Power Plant
07/09/2001 II-01-029 NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Watts Bar Nuclear Power Plant
07/06/2001 III-01-037 NRC to Meet with Exelon Generation Company to Discuss Safety Performance at the Clinton Nuclear Plant
07/06/2001 01-083 NRC Approves Power Uprate for San Onofre Nuclear Facility in California
07/06/2001 01-082 NRC to Begin One-Year Evaluation of a Revised Program to Assess Physical Security at Nuclear Power Plants
07/06/2001 01-081 NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on July 17 - 19
07/05/2001 III-01-036 NRC to Meet with Exelon Generation Co. to Discuss Safety Performance at the Braidwood Nuclear Power Plant
07/05/2001 III-01-035 NRC to Meet with Exelon Generation Co. to Discuss Safety Performance at the Dresden Nuclear Plant
07/05/2001 III-01-034 NRC to Meet with FirstEnergy Company to Discuss Safety Performance at the Perry Nuclear Plant
07/05/2001 III-01-033 NRC to Meet with Exelon Generation Company to Discuss Safety Performance at the LaSalle Nuclear Plant
07/05/2001 I-01-047 NRC to Meet with FirstEnergy Nuclear Operating Company to Discuss Performance at Beaver Valley Nuclear Power Plant
07/05/2001 I-01-046 NRC to Meet with Entergy Nuclear Northeast To Discuss Performance at Indian Point 3 Nuclear Power Plant
07/05/2001 01-080 ACRS Subcommittees on Materials and Metallurgy and Plant Operations to Meet in Rockville, Maryland, on July 10
07/05/2001 01-079 NRC Order Halts Shipment of Large Radioactive Sources by JL Shepherd & Associates
07/03/2001 III-01-032 NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Kewaunee Nuclear Plant
07/03/2001 III-01-031 NRC to Meet with FirstEnergy Company to Discuss Safety Performance at the Davis-Besse Nuclear Power Station
07/03/2001 III-01-030 NRC to Meet with Exelon Nuclear to Discuss Safety Performance at the Byron Nuclear Power Plant
07/03/2001 I-01-045 NRC Assigns New Sr. Resident Inspector to Seabrook Station
07/03/2001 01-078 NRC Extends Comment Period to September 6 for Turkey Point License Renewal Draft Environmental Impact Statement
07/02/2001 III-01-029 NRC to Meet with Nuclear Management Company Officials to Discuss Safety Performance at the Point Beach Nuclear Plant
07/02/2001 III-01-028 NRC to Meet with American Electric Power to Discuss Safety Performance at the D.C. Cook Nuclear Power Station
07/02/2001 I-01-044 NRC to Meet with PSEG Nuclear to Discuss Performance at Salem and Hope Creek Nuclear Plants
07/02/2001 II-01-028 NRC to Meet with FP&L Nuclear Officials to Discuss Safety Performance at Turkey Point Nuclear Power Plant
07/02/2001 II-01-027 NRC to Meet with FP&L Nuclear Officials to Discuss Safety Performance at St. Lucie Nuclear Power Plant
07/02/2001 II-01-026 NRC to Meet with TVA Nuclear Officials to Discuss Safety Performance at Sequoyah Nuclear Power Plant
07/02/2001 II-01-025 NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Robinson Nuclear Power Plant
07/02/2001 II-01-024 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Farley Nuclear Power Plant
07/02/2001 II-01-023 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at McGuire Nuclear Power Plant
07/02/2001 II-01-022 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Catawba Nuclear Power Plant
June
Date Document Number Description
06/29/2001 III-01-027 NRC Staff Proposes $55,000 Fine Against Michigan Nuclear Plant for Failure to Provide Complete and Accurate Information
06/29/2001 01-077 NRC Announces Availability of License Renewal Applications for North Anna, Surry
06/27/2001 I-01-043 NRC Assigns New Sr. Resident Inspector to TMI Nuclear Plant
06/27/2001 01-076 NRC Seeks Members of Public to Join an ADAMS User Group to Enhance Communications with Agency
06/27/2001 01-075 NRC Seeks Comments on Preliminary Assessment of Nuclear Industry Consolidation on Agency's Regulatory Oversight
06/25/2001 IV-01-037 NRC Monitoring Events at Cooper Nuclear Station
06/25/2001 III-01-026 NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Duane Arnold Nuclear Plant
06/25/2001 I-01-042 NRC to Meet with Vermont Yankee Nuclear Power Corporation to Discuss Performance at Vermont Yankee Nuclear Power Plant
06/25/2001 01-074 NRC Approves Transfer of Operating Licenses for Nine Mile Point Nuclear Plant
06/22/2001 IV-01-036 NRC to Meet with Arizona Public Service to Discuss Safety Performance at Palo Verde
06/22/2001 III-01-025 NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Prairie Island Nuclear Power Station
06/21/2001 01-073 NRC Renews License for Arkansas Nuclear One, Unit 1 for an Additional 20 Years
06/21/2001 II-01-021 NRC Proposes $3,000 Fine Against Puerto Rico Company for Violation of Radioactive Material Safety Requirements
06/20/2001 I-01-041 NRC to Meet with PPL Susquehanna to Discuss Performance at Susquehanna Nuclear Power Plant
06/20/2001 I-01-040 NRC to Meet with Amergen Energy Company to Discuss Performance at Three Mile Island 1 Nuclear Power Plant
06/20/2001 I-01-039 NRC to Meet with Exelon Generation Company to Discuss Performance at Limerick Nuclear Power Plant
06/20/2001 II-01-020 NRC to Meet with Southern Nuclear Officials to Discuss Safety Performance at Hatch Nuclear Power Plant
06/20/2001 II-01-019 NRC to Meet with Duke Energy Officials to Discuss Safety Performance at Oconee Nuclear Power Plant
06/20/2001 II-01-018 NRC to Meet with Virginia Power Officials to Discuss Safety Performance at Surry Nuclear Power Plant
06/20/2001 II-01-017 NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Harris Nuclear Power Plant
06/20/2001 II-01-016 NRC to Meet with Virginia Power Officials to Discuss Safety Performance at North Anna Nuclear Power Plant
06/20/2001 II-01-015 NRC to Meet with Progress Energy/CP&L Officials to Discuss Safety Performance at Brunswick Nuclear Power Plant
06/19/2001 IV-01-035 NRC to Meet with Entergy to Discuss Safety Performance at Arkansas Nuclear One
06/19/2001 I-01-038 NRC to Meet with Entergy Nuclear Generation Company to Discuss Performance at Pilgrim Nuclear Power Plant
06/19/2001 I-01-037 NRC to Meet with Constellation Nuclear to Discuss Performance at Calvert Cliffs Nuclear Power Plant
06/19/2001 I-01-036 NRC to Discuss Preliminary "White" Finding on TMI 1 Corrective Actions
06/14/2001 IV-01-034 NRC to Meet with Entergy to Discuss Safety Performance at River Bend
06/14/2001 IV-01-033 NRC to Meet with TXU Electric to Discuss Safety Performance at Comanche Peak
06/14/2001 IV-01-032 NRC to Meet with Energy Northwest to Discuss Safety Performance at Columbia Generating Station
06/14/2001 IV-01-031 NRC to Meet with OPPD to Discuss Safety Performance at Fort Calhoun Station
06/14/2001 IV-01-030 NRC to Meet with Entergy to Discuss Safety Performance at Waterford 3 Nuclear Power Plant
06/14/2001 III-01-024 NRC to Meet with Detroit Edison Company to Discuss Safety Performance at the Fermi 2 Nuclear Power Station
06/14/2001 I-01-035 NRC to Meet with Amergen Energy Company to Discuss Performance at Oyster Creek Nuclear Power Plant
06/14/2001 I-01-034 NRC to Meet with Rochester Gas & Electric Corporation to Discuss Performance at R.E. Ginna Nuclear Power Plant
06/14/2001 I-01-033 NRC Assigns New Senior Resident Inspector to Salem Nuclear Plant
06/14/2001 I-01-032 NRC Sr. Resident Inspector at Peach Bottom Receives Meritorious Service Award for Inspector Excellence
06/14/2001 II-01-014 NRC Staff Seeks Input on Draft Turkey Point Environmental Impact Statement; Meetings Scheduled for July 17
06/13/2001 IV-01-029 Peter J. Alter Assigned NRC Senior Resident Inspector for River Bend Station
06/13/2001 I-01-031 NRC to Meet with Niagara Mohawk Power Corporation to Discuss Performance at Nine Mile Point Nuclear Power Plants
06/12/2001 01-072 NRC to Hold Public Meetings on Discrimination Task Group Draft Report Recommendations
06/12/2001 01-071 NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on June 19 - 21
06/12/2001 I-01-030 NRC to Meet with Entergy Nuclear Northeast to Discuss Performance at FitzPatrick Nuclear Power Plant
06/12/2001 IV-01-028 Clyde C. Osterholtz Named NRC Senior Resident Inspector at San Onofre Nuclear Generating Station
06/08/2001 01-070 NRC Amends Licensing, Inspection and Annual Fees Rule
06/07/2001 I-01-029 NRC to Meet with North Atlantic Energy Service Corporation to Discuss Performance at Seabrook Nuclear Power Plant
06/07/2001 IV-01-027 NRC to Meet with PG&E to Discuss Safety Performance at Diablo Canyon Nuclear Power Plant
06/07/2001 IV-01-026 NRC to Meet with Entergy To Discuss Safety Performance at Grand Gulf Nuclear Power Plant
06/06/2001 01-069 NRC to Meet with Public on June 13 fo Discuss Use of Risk Information in Regulating Nuclear Waste and Materials
06/06/2001 I-01-028 NRC to Meet with Consolidated Edison Company of New York to Discuss Safety Performance at Indian Point 2 Nuclear Plant
06/06/2001 III-01-022 NRC Staff to Meet with University Officials on Apparent Violations at Southeast Missouri State University
06/06/2001 II-01-013 NRC to Meet with TVA Officials to Discuss Safety Performance at Browns Ferry Nuclear Power Plant
06/06/2001 II-01-012 NRC to Meet with Florida Power Officials to Discuss Safety Performance at Crystal River Nuclear Power Plant
06/05/2001 01-068 ACRS Subcommittee to Meet on Reactor Power Uprates on June 12
06/05/2001 III-01-021 NRC Names New Senior Resident Inspector at Byron Nuclear Power Plant
06/05/2001 I-01-027 NRC to Meet with Exelon Generation Company to Discuss Performance at Peach Bottom Nuclear Power Plant
06/05/2001 IV-01-025 NRC to Meet with SONGS To Discuss Safety Performance at Nuclear Power Plant
06/01/2001 01-067 NRC Issues Annual Assessments for All Nuclear Plants
06/01/2001 IV-01-024 NRC to Meet with Wolf Creek to Discuss Safety Performance at Nuclear Power Plant
06/01/2001 IV-01-023 NRC to Meet with South Texas Project to Discuss Safety Performance at STP Nuclear Power Plant
06/01/2001 III-01-020 NRC to Meet with Nuclear Management Company to Discuss Safety Performance at the Palisades Nuclear Power Plant
May
Date Document Number Description
05/31/2001 II-01-011 NRC Staff to Hold Public Meeting with FP&L June 8 to Discuss Initial Plant License Renewal Inspection at Turkey Point
05/30/2001 01-066 NRC Seeks Comments on Proposed Agenda for Annual Nuclear Safety Research Conference in October
05/30/2001 IV-01-022 NRC to Meet with NPPD to Discuss Safety Performance at Cooper Nuclear Station
05/29/2001 01-065 NRC Seeks Comments on Proposed Changes to Material Control and Accounting Regulations
05/25/2001 01-064 NRC Sends Special Inspection Team to Westinghouse Fuel Fabrication Facility in Columbia, S.C.
05/25/2001 01-063 NRC Invites Public to Submit Nominations for the Advisory Committee on Reactor Safeguards
05/25/2001 01-062 NRC Seeks Public Comments on Draft of Discrimination Task Group Report
05/25/2001 01-061 ACRS Subcommittee on Reliability and Probabilistic Risk Assessment to Meet in Rockville, Maryland, on June 22
05/25/2001 II-01-010 NRC Staff to Hold Predecisional Enforcement Conference in Atlanta on June 6 with Turabo Corporation of Caguas, Puerto Rico
05/23/2001 01-060 NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on June 6-8
05/22/2001 IV-01-021 NRC Proposes to Fine the Texas A&M University System $2,400 for Errors in Shipping Radioactive Material
05/21/2001 IV-01-020 NRC Chairman to Hold News Briefing Following Visit to Arkansas Nuclear One
05/16/2001 01-059 NRC Schedules Meetings in Pahrump, Las Vegas to Explain Hearing Process for Considering Possible Waste Repository
05/16/2001 I-01-026 NRC Dominion Nuclear to Discuss Millstone 2 Performance Issues
05/15/2001 IV-01-019 NRC Fines Callaway $55,000 for Retaliation Against Security Personnel
05/14/2001 01-058 Advisory Panel Issues Report Assessing First Year of NRC's Reactor Oversight Process
05/11/2001 I-01-025 NRC to Conduct Special Inspection at IP3 to Look into Loss of Spent Fuel Cooling
05/10/2001 01-057 NRC Schedules May 24 Meeting in Mesquite, Nevada, on Possible Yucca Mountain Waste Repository
05/10/2001 I-01-024 NRC to Discuss Changes in Emergency Plans for Three Pa. Plant Sites
05/10/2001 III-01-019 NRC to Hold Public Meetings in Illinois and Kentucky on May 16 and 17 to Discuss Plant Performance and Oversight Program Changes
05/10/2001 IV-01-018 NRC Inspections Find ANO-1 Managing Aging Equipment Effectively
05/10/2001 IV-01-017 NRC Finds No Environmental Impact from Extended Operation of ANO
05/09/2001 01-056 NRC's Office of Inspector General Schedules Conference May 21
05/09/2001 I-01-023 NRC Chairman To Hold News Briefing After Visit to N.Y. Nuclear Plants
05/08/2001 01-055 NRC Advisory Committee on Reactor Safeguards Revises May Meeting Agenda
05/08/2001 01-054 NRC Advisory Subcommittee on Advanced Reactors to Hold Workshop in Rockville, Maryland, on June 4-5
05/04/2001 III-01-018 NRC Staff to Meet with Consumers Energy on Apparent Violation at Palisades Nuclear Plant
05/03/2001 01-053 NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on May 15-17
05/02/2001 01-052 NRC Names Dr. F. Peter Ford to the Advisory Committee on Reactor Safeguards
05/02/2001 IV-01-016 NRC to Discuss Inspection Program with Radiography Industry at Public Forum in Lafayette
05/01/2001 01-051 NRC Seeks Public Comment on Proposed Rule on Decommissioning Trust Provisions and Draft Regulatory Guide
05/01/2001 III-01-017 Kewaunee Nuclear Plant May 3 Regulatory Conference Postponed
April
Date Document Number Description
04/30/2001 01-050 NRC Makes Available Report on Direction of Nuclear Regulatory Research
04/27/2001 01-049 NRC to Meet with Public on May 8 in Rockville, Maryland, to Discuss Fuel Facility Oversight
04/27/2001 III-01-016 NRC to Meet with Nuclear Management Co. May 3 to Discuss Inspection Finding at Kewaunee Nuclear Plant
04/26/2001 01-048 NRC Changes Regulations on Electronic Documents for Possible High-level Waste Repository Hearing
04/24/2001 01-047 Commissioner Dicus Honored by Texas Woman's University
04/24/2001 01-046 NRC Will Hold Public Meeting in Charlotte on Environmental Review for Proposed Mixed Oxide Fuel Facility
04/24/2001 01-045 NRC to Meet with Public on May 11 to Discuss Use of Risk Information in Regulating Nuclear Waste and Materials
04/24/2001 I-01-022 NRC, Con Ed to Discuss Response to Team Inspection at Indian Point 2
04/21/2001 I-01-021 NRC Prehearing Conference Scheduled for Haddam Neck Nuclear Power Plant
04/20/2001 I-01-020 NRC to Discuss Performance Indicator on Unplanned Power Changes at James A. FitzPatrick Nuclear Power Plant
04/20/2001 III-01-015 NRC Approves Transfer of Operating Authority for Palisades Plant
04/19/2001 01-044 Chairman Meserve to Hold Press Conference
04/19/2001 01-043 NRC's Potassium Iodide Web Site Available
04/19/2001 III-01-014 NRC Names New Resident Inspector at Paducah Gaseous Diffusion Plant
04/19/2001 III-01-013 NRC to Meet with USEC Officials April 26 to Discuss Shutdown of Enrichment Operations at the Portsmouth Plant
04/18/2001 01-042 NRC Advisory Committee on Reactor Safeguard To Meet in Rockville, Maryland, May 10 - 12
04/18/2001 01-041 NRC Announces Opportunity for Hearing on Proposed Mixed Oxide Fuel Facility
04/16/2001 I-01-019 Millstone 1 Owner to Update NRC on Search for Missing Spent Fuel Rods
04/10/2001 I-01-018 NRC Issues Report on Inspection Team's Findings for Indian Point 2
04/09/2001 01-040 NRC 2002 Budget Request Available
04/09/2001 IV-01-015 NRC Regional Administrator to Hold Press Conference at San Luis Obispo
04/06/2001 01-039 NRC Reassures Governor of California
04/06/2001 01-038 NRC Proposes Revising Rules Governing Conduct of Hearings
04/06/2001 III-01-012 NRC Prohibits a Former Michigan Nuclear Medicine Technician from Participating in NRC-Licensed Activities
04/03/2001 IV-01-014 NRC Staff Proposes $5,500 Fine for Bayou Inspection Services, Inc.
04/02/2001 01-037 ACRS Subcommittee on Reliability and Probabilistic Risk Assessment to Meet in Rockville, Maryland, on April 17
04/02/2001 01-036 NRC Considers Construction Application, Announces Opportunity for Hearing on Proposed Mixed Oxide Fuel Facility
March
Date Document Number Description
03/30/2001 01-035 NRC Organizes Future Licensing Project Organization
03/28/2001 IV-01-013 NRC Staff Proposes $5,500 Fine for Gulf Coast International Inspection, Inc.
03/26/2001 01-034 NRC to Hold Workshop April 4 on Public Participation Issues
03/23/2001 IV-01-012 NRC, NPPD to Meet for Regulatory Conference on Potential Yellow Findings at Cooper Nuclear Station
03/22/2001 01-033 NRC Seeks Comment on Proposal to Amend Licensing, Inspection and Annual Fees
03/21/2001 01-032 NRC to Discuss Apparent Violations with Texas A&M University in Rockville, Maryland, on March 29
03/21/2001 III-01-011 NRC to Hold Public Meeting to Discuss Its Authorization of Uranium Enrichment Activities at Paducah, Kentucky, Plant
03/19/2001 01-031 NRC Authorizes USEC to Increase Uranium Enrichment at Paducah, Kentucky, Plant
03/15/2001 01-030 NRC Advisory Committee on the Medical Uses of Isotopes to Meet in Rockville, Maryland, on April 18
03/15/2001 01-029 Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on April 5 - 7
03/15/2001 I-01-017 NRC to Meet with New Jersey Company to Discuss Site Remediation Plans
03/14/2001 01-028 NRC Advisory Committee on Reactor Safeguards' Subcommittee on Reactor Fuels to Meet in Maryland on April 4
03/14/2001 I-01-016 NRC Special Inspection Team at Seabrook Station to Look into Last Week's "Unusual Event"
03/14/2001 IV-01-011 NRC to Meet with SONGS Officials to Discuss Results of Special Inspection
03/13/2001 01-027 Public Invited to Open House in Las Vegas with Local NRC Representatives
03/13/2001 IV-01-010 NRC to Meet with Public to Discuss Storage of Spent Nuclear Fuel at Diablo Canyon
03/09/2001 IV-01-009 NRC Staff Proposes $5,500 Fine for Global X-Ray & Testing Corp.
03/09/2001 01-026 NRC Approves Transfer of Operating Licenses for Millstone Units 1, 2 and 3
03/09/2001 01-025 NRC's ACRS Plant License Renewal Subcommittee Meets March 27, 28; Revises Agenda for March 16 Joint Subcommittee Meeting
03/09/2001 I-01-015 NRC Reschedules Meeting with Washington, D.C. Hospital
03/09/2001 III-01-010 NRC Staff Completes Review of Safety Significance of Issues at Kewaunee Nuclear Power Plant
03/09/2001 II-01-007 NRC Staff to Hold Public Meeting March 16 at Plant Hatch to Discuss Inspection of Plant's License Renewal Program
03/07/2001 I-01-014 Note to Editors: New Time for NRC Chairman's Press Briefing at Indian Point 2
03/06/2001 01-024 NRC Announces Environmental Review, Public Meetings on Proposed Mixed Oxide Fuel Facility
03/06/2001 I-01-013 Oral Hearing to Be Held March 13 on FitzPatrick/Indian Point 3 Petition
03/06/2001 IV-01-008 NRC to Discuss Results of ANO Unit 1 License Renewal Inspection March 9
03/05/2001 01-023 NRC Receives Construction Application for Proposed Mixed Oxide Fuel Fabrication Facility
03/05/2001 I-01-012 NRC Postpones Meeting with Washington, D.C. Hospital
03/02/2001 01-022 NRC Names William F. Kane Deputy for Reactor Programs; Announces Related Management Changes
03/02/2001 I-01-011 NRC Chairman to Hold News Briefing Following Visit to Indian Point 2
03/01/2001 01-021 NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland, on March 21 - 23
03/01/2001 III-01-009 NRC Staff Completes Safety Review of Radiation Protection Planning at Quad Cities Nuclear Power Station
February
Date Document Number Description
02/28/2001 01-020 NRC Advisory Committee on Reactor Safeguards Subcommittees to Hold Meetings in Rockville, Maryland, on March 15 and 16
02/28/2001 III-01-008 NRC Staff Completes Safety Review of Design Issue at Prairie Island Nuclear Power Station
02/27/2001 I-01-010 NRC to Discuss Apparent Violation at Washington, D.C., Hospital
02/27/2001 III-01-007 NRC Staff Proposes $8,800 Fine Against St. Louis Medical Service for Deliberate Violation of Regulations
02/26/2001 01-019 NRC Issues Safety Evaluation Concluding Summer Plant Can Safely Resume Operation
02/26/2001 IV-01-007 Tim Hoeg Named Senior Resident Inspector at Grand Gulf Nuclear Plant
02/23/2001 I-01-009 NRC to Meet with PPL March 1 to Discuss Susquehanna Inspection Finding
02/23/2001 I-01-008 NRC Schedules Two Meetings on IP2 on March 2
02/20/2001 01-018 NRC to Hold Workshop March 26-28 on Initial Implementation of the Reactor Oversight Process
02/20/2001 01-017 NRC Approves License Termination Plan for Trojan Nuclear Power Plant
02/20/2001 I-01-007 NRC to Discuss Apparent Violations with Toms River, N.J., Hospital
02/16/2001 01-016 NRC Directs CP&L Not to Store Spent Fuel in Additional Storage Pools Pending Further Order
02/16/2001 01-015 NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, March 1 - 3
02/15/2001 IV-01-006 NRC Chairman to Hold News Briefing Following Visit to Palo Verde
02/15/2001 III-01-006 NRC Names New Resident Inspector at Point Beach Nuclear Power Plant
02/15/2001 IV-01-004 NRC to Meet with Public to Discuss Storage of Spent Nuclear Fuel at San Onofre
02/14/2001 01-014 NRC to Hold Public Meeting on Nuclear Research In Washington, D.C., on February 21
02/14/2001 I-01-006 NRC to Discuss Apparent Violation with Washington, D.C., Hospital
02/09/2001 II-01-006 NRC Special Inspection Team to Discuss Findings with Summer Plant Officials
02/08/2001 01-013 NRC Refines Process for Assessing Results of Security Exercises at Nuclear Power Plants
02/07/2001 III-01-005 NRC to Meet with Exelon February 13 to Discuss Radiation Protection Findings at Quad Cities Nuclear Plant
02/06/2001 IV-01-005 NRC Special Inspection Team Sent to SONGS
02/05/2001 I-01-005 NRC to Discuss Apparent Violations with Pa. Civil Engineering Firm
02/02/2001 01-012 NRC's Advisory Committee on Reactor Safeguards Subcommittee on Thermal-Hydraulic Phenomena to Meet on Feb. 20
02/02/2001 I-01-004 NRC to Discuss Apparent Violations with Philadelphia Medical Facility
02/01/2001 01-011 NRC Schedules Workshop on Fuel Facility Oversight
January
Date Document Number Description
01/31/2001 01-010 Subcommittees of Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on February 21 - 22
01/31/2001 01-009 NRC Advisory Committee on Nuclear Waste Working Group, to Meet in Rockville, Maryland, on February 21 - 22
01/30/2001 III-01-004 NRC Names New Resident Inspector at Lasalle Nuclear Power Plant
01/29/2001 01-008 NRC Allows Reactor Licensees to Submit Documents Electronically
01/25/2001 01-007 NRC Staff to Hold Meeting on Former Atlas Mill Tailings Site in Moab, Utah
01/25/2001 01-006 NRC Advisory Committee on Reactor Safeguards Elects Chairman, Vice-Chairman and Member-at-Large
01/24/2001 III-01-003 NRC Staff to Meet with Nuclear Management Co. Jan. 30 to Discuss Inspection Findings at Kewaunee Nuclear Plant
01/17/2001 01-005 NRC Report Rates Risk of Fire at Decommissioning Nuclear Power Plant Spent Fuel Pool as Low
01/17/2001 III-01-002 NRC Staff to Discuss Portsmouth Gaseous Diffusion Plant Performance January 23
01/16/2001 01-004 NRC to Hold Public Meeting on Nuclear Research in Maryland on January 24 - 25
01/16/2001 I-01-003 NRC Withdraws Civil Penalties Against Pennsylvania Man
01/12/2001 I-01-002 NRC to Begin Inspection at IP2
01/11/2001 II-01-005 NRC Meeting to Discuss Harris Nuclear Plant Concerns with CP&L Rescheduled
01/10/2001 II-01-004 NRC Staff to Meet with Law Engineering to Discuss Apparent Violations of NRC Requirements
01/10/2001 IV-01-001 Note to Editors: Decision Issued on Calloway
01/09/2001 III-01-001 NRC Names New Resident Inspector at Quad Cities Nuclear Power Plant
01/08/2001 II-01-003 Prehearing Conference Scheduled on Turkey Point Nuclear Plant License Renewal
01/08/2001 01-003 NRC Amends Regulations to Add FuelSolutions Storage Cask Design to Approved List
01/08/2001 01-001 NRC Names Christopher Cahill Resident Inspector at the Hope Creek Nuclear Plant
01/05/2001 II-01-002 NRC Staff to Discuss Harris Nuclear Plant Concerns with CP&L
01/02/2001 01-002 NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, February
01/02/2001 01-001 Joint Subcommittee to Meet January 19 in Rockville, Maryland
01/02/2001 II-01-001 NRC Staff to Meet with Summer Plant Officials to Discuss Pipe Repair Prior to Plant Restart

To top of page