List of Construction Inspection Reports

The U.S. Nuclear Regulatory Commission (NRC) regulates the construction and operation of new commercial nuclear power facilities. The NRC performs inspections and audits to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and applicants, and their contractors. The staff conducts inspections to review activities associated with early site permits and combined license (COL) applications, and conducts Pre-Design Certification and Pre-COL audits. The results of these inspections and audits can be found on the QA Inspections for New Reactor Licensing web page.

The NRC also implements a Construction Inspection Program (CIP) at sites that are under construction. The core of the CIP is carried out by construction resident (on-site) inspectors (CRIs) assigned to the site by Region II. The number of CRIs at a site will be dependent on the projected workload at the site. The CRIs will be supplemented with additional personnel from Region II, other regional offices, and Headquarters technical staff, as needed, to provide reasonable assurance that the as-built facility conforms to the conditions of the COL. NRC resources are carefully managed to ensure that construction inspection activities do not in any way detract from the ongoing oversight of operating reactors.

Construction inspection reports are listed below. This page may not contain the latest cROP inspection reports that are currently available in ADAMS. This page is updated on a quarterly basis and as needed to support the basis for a plant's Action Matrix column designation. Only the cover letters of security-related inspection reports are publicly available.

On this page:

Virgil C. Summer Nuclear Station, Units 2 and 3

On July 31, 2017, South Carolina Electric & Gas Company (SCE&G) announced that it had stopped construction of V.C. Summer Units 2 and 3, as documented in a letter dated August 17, 2017.

The NRC ceased inspection and Construction Reactor Oversight Process activities for V.C. Summer Units 2 and 3 after the July 31 announcement. This page contains information related to V.C. Summer Units 2 and 3 inspection and Construction Reactor Oversight Process activities completed prior to July 31, 2017.

Date Subject Other Correspondence
09/14/17 Virgil C. Summer Nuclear Station Units 2 And 3 - NRC Integrated Inspection Reports 05200027/2017003, 05200028/2017003 N/A
08/10/17 Virgil C. Summer Nuclear Station Units 2 and 3, NRC Integrated Inspection Reports 05200027/2017002, 05200028/2017002 N/A
08/10/17 Virgil C. Summer Nuclear Station Unit 2 - NRC Security Inspection Report 05200027/2017402 (OUO REMOVED) N/A
05/12/17 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2017001, 05200028/2017001 N/A
04/05/17 Errata for Virgil C Summer Nuclear Station Units 2 and 3 - NRC Inspection of the Preoperational Initial Test Program, Reports 05200027/2017006, 05200028/2017006 N/A
03/21/17 Virgil C Summer Nuclear Station Units 2 and 3 - NRC Inspection of the Preoperational Initial Test Program, Reports, 05200025/2017006, 05200026/201700 N/A
02/14/17 Virgil C Summer Nuclear Station Units 2 and 3 - NRC Security Inspection Report 05200027/2016404 N/A
02/13/17 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection, Reports 05200027/2016004, 05200028/2016004 N/A
12/15/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Security Baseline Inspection Report 05200027/2016403 and 05200028/2016403 N/A
11/21/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Periodic Inspection of Quality Assurance Program Reports 05200027/2016008, 05200028/2016008 N/A
11/10/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2016003, 05200028/2016003 N/A
10/18/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Program Inspection For Corrective Action Program Implementation Inspection, Reports 05200027/2016007 and 05200028/2016007 N/A
08/08/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2016002, 05200028/2016002 N/A
05/12/16 Virgil C. Summer, Units 2 and 3, NRC Integrated Inspection Report 05200027/2016001 and 05200028/2016001, January 1, 2016 through March 31, 2016 N/A
02/04/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2015004, 05200028/2015004 N/A
01/20/16 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Periodic Inspection Of Quality Assurance Program Reports, 05200027/2015008 and 05200028/2015008 N/A
11/05/15 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2015003 and 05200028/2015003 N/A
08/11/15 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2015002, 05200028/2015002 N/A
07/31/15 V. C. Summer Nuclear Power Plant - NRC Operator License Examination Interim Report 05200027/2015302 N/A
06/10/15 VC Summer Nuclear Station Unit 2 - US NRC Special Inspection Report 05200027/2015009 N/A
05/28/15 V.C. Summer Units 2 & 3, Program Inspection for Management of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) and Corrective Action Program Implementation Inspection - Inspection Reports 05200027/2015007, 05200028/2015007 N/A
05/21/15 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Simulation Facility Inspection Report 05200027/2015301, 05200028/2015301 N/A
04/30/15 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2015001, 5200028/2015001 N/A
02/06/15 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 5200027/2014005, 05200028/2014005 N/A
11/10/14 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2014004 and 05200028/2014004 N/A
10/20/14 Virgil C. Summer Nuclear Station Units 2 and 3 - Routine Program Inspection for Quality Assurance Program Implementation During Construction Activities, Inspection Report 05200027/2014014 and 05200028/2014014 N/A
09/05/14 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Program Inspection For Management Of Inspections, Tests, Analyses, and Acceptance Criteria and Corrective Action Program Implementation Inspection, Reports 05200027/2014-012 and 05200028/2014-012 N/A
08/06/14 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2014003 and 05200028/2014003 N/A
04/29/14 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2014002 and 05200028/2014002 N/A
01/17/14 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2013005 and 05200028/2013005 N/A
11/06/13 Virgil C. Summer Nuclear Station Units 2, and 3; Periodic Quality Assurance Inspection Report, IR 05200027-13-011, 05200028-13-011; on 09/30/2013 through 10/04/2013 N/A
10/30/13 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2013004 and 05200028/2013004 N/A
08/21/13 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Corrective Action Program Implementation Inspection Reports 05200027/2013007 and 05200028/2013007 N/A
07/29/13 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2013003 and 05200028/2013003 N/A
05/20/13 Virgil C. Summer Nuclear Station Units 2 And 3 - NRC Periodic Quality Assurance Inspection Reports 05200027/2013009 and 05200028/2013009 N/A
04/26/13 Virgil C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2013002 and 05200028/2013002 N/A
03/26/13 South Carolina Electric and Gas (SCE&G), V.C. Summer Nuclear Station Unit 2 - U.S. Nuclear Regulatory Commission ITAAC Inspection, Inspection Report No. 05200027/2013008; Preliminary White Finding. Regulatory Conference Summary
Final Significance Determination Letter
02/14/13 South Carolina Electric and Gas V.C. Summer Nuclear Station, Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2012-005, 05200028/2012-005, and Notice of Violation. Licensee Response
NRC Acknowledgement
11/14/12 South Carolina Electric and Gas V.C. Summer Nuclear Station, Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2012-004, 05200028/2012-004, and Notice of Violation. Licensee Response
NRC Acknowledgement
05/13/14



08/06/12
Errata - South Carolina Electric and Gas V.C. Summer Nuclear Station Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2012-003, 05200028/2012-003 and Notice of Violation

South Carolina Electric and Gas V.C. Summer Nuclear Station, Units 2 and 3 - NRC Integrated Inspection Reports 05200027/2012-003, 05200028/2012-003 and Notice of Violation; Quality Assurance Program Implementation During Construction and Pre-Construction Activities.
Licensee Response
Licensee Response
NRC Acknowledgement
12/09/11 South Carolina Electric and Gas V.C. Summer Nuclear Station, Units 2 and 3 - NRC Inspection Reports 05200027/2011-001, AND 05200028/2011-001; The intent of this inspection was to conduct a pre-combined operating license programmatic review of the welding program being implemented by Chicago Bridge and Iron for the welding of the Units 2 and 3 containment vessels, and observe production welding activities as available. N/A

Vogtle Electric Generating Plant, Units 3 and 4

Date Subject Other Correspondence
08/22/22 Vogtle Electric Generating Plant, Unit 3 - NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006 N/A
07/13/22 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2022003, 05200026/2022003 and Second Quarter Assessment Follow-Up Letter N/A
07/12/22 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2022004, 05200026/2022004 N/A
05/11/22 Vogtle Electric Generating Plant, Units 3 & 4 - Integrated Inspection Reports 05200025/2022001, 05200026/2022001 N/A
04/19/22 Vogtle Electric Generating Plant, Unit 3 – Supplemental Inspection Report 05200025/2022010 and Assessment Follow-Up Letter N/A
04/01/22 Vogtle Electric Generating Plant, Units 3 And 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2022002, 05200026/2022002 N/A
02/11/22 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021007, 05200026/2021007 N/A
02/10/22 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 N/A
11/17/21 Vogtle Electric Generating Plant, Units 3 Final Significance Determination of a Preliminary White Finding, A Preliminary Greater Than Green Finding, Notice of Violation, and Assessment Follow-Up Letter; NRC Special Inspection Report 05200025/2021011 N/A
11/12/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021005, 05200026/2021005 N/A
11/10/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021006, 05200026/2021006 N/A
08/26/21 Vogtle Electric Generating Plant, Units 3 And 4 - NRC Special Inspection Reports 05200025/2021010, 05200026/2021010 And – Preliminary White And Greater Than Green Findings For Unit 3 N/A
08/12/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021004, 05200026/2021004 N/A
08/06/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021003, 05200026/2021003 N/A
05/13/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021002, 05200026/2021002 N/A
05/13/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2021001, and 05200026/2021001 N/A
02/10/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020010, 05200026/2020010 N/A
02/10/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020004, and 05200026/2020004 N/A
01/25/21 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Confirmatory Follow-Up and Safety Conscious Work Environment Inspection Reports 05200025/20200012, and 05200026/2020012 N/A
12/10/20 Vogtle Electric Generating Plant, Unit 3 – Withdrawal of Non-Cited Violation 05200025/2016004-02, Failure to Qualify WPS in Accordance with Applicable Code N/A
11/18/20 Vogtle Electric Generating Plant, Unit 3 – NRC Initial Cyber Security Inspection for Construction 05200025/2020401 N/A
11/10/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020003, and 05200026/2020003 N/A
11/10/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020009, 05200026/2020009 N/A
08/12/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020002, and 05200026/2020002 N/A
08/11/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2020008, 05200026/2020008 N/A
07/15/20 Vogtle Electric Generating Plant, Unit 3 – NRC Integrated Inspection Report 05200025/2019010 N/A
05/07/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2020001, and 05200026/2020001 N/A
04/23/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Initial Test Program And Operational Programs Integrated Inspection Reports 05200025/2020007, and 05200026/2020007 N/A
02/11/20 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2019004, and 05200026/2019004 N/A
11/13/19 Vogtle Electric Generating Plant Units 3 and 4 U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2019402 and 05200026/2019402 N/A
11/04/19 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2019003 and 05200026/2019003 N/A
08/08/19 Vogtle Electric Generating Plant, Units 3 & 4, NRC Security Baseline Inspection Report 05200025/2019401 and 05200026/2019401 N/A
08/07/19 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Report 05200025/2019002, and 05200026/2019002 N/A
05/15/19 Vogtle Electric Generating Plant, Units 3 and 4 – NRC integrated Inspection Reports 05200025/2019001, 05200026/2019001 N/A
02/14/19 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2018004, 05200026/2018004 N/A
01/31/19 Southern Nuclear Operating Company Vogtle Electric Generating Plant, Units 3 and 4 – U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2018413 and 05200026/2018413 (OUO Removed) N/A
11/13/18 Vogtle, Units 3 and 4; NRC Integrated Inspection Reports 05200025/2018003, 05200026/2018003 N/A
10/26/18 Southern Nuclear Operating Company Vogtle Electric Generating Plant, Units 3 ∓ 4 – U.S. Nuclear Regulatory Commission Security Integrated Inspection Report 05200025/2018412 and 05200026/2018412 (OUO Removed) N/A
10/03/18 NRC Program Inspection for Corrective Action Program Implementation Inspection N/A
08/14/18 Vogtle Electric Generating Plant, Units 3 and 4 – NRC Integrated Inspection Reports 05200025/2018002 N/A
08/13/18 Vogtle Electric Generating Plant Units 3 and 4 – U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2018411 and 05200026/2018411 (OUO Removed) N/A
05/14/18 Vogtle Electric Generating Plant, Units 3 And 4 – NRC Integrated Inspection Reports 05200025/2018001, 05200026/2018001 N/A
05/09/18 Vogtle Electric Generating Plant Units 3 and 4 - NRC Security Inspection Reports 05200025/2018410, 05200026/2018410 (OUO REMOVED) N/A
03/21/18 Vogtle Electric Generating Plant, Units 3 And 4 - NRC Inspection of Preoperational Factory Acceptance Testing, Reports 05200025/2017010, 05200026/2017010 N/A
04/04/18 Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025/2017004, 05200026/2017004 N/A
02/14/18 Vogtle Electric Generating Plant, Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2017004, 05200026/2017004 N/A
02/08/18 Vogtle Electric Generating Plant Units 3 and 4 - NRC Security Inspection Reports 05200025/2017404, 05200026/2017404 (OUO REMOVED) N/A
11/09/17 Vogtle Electric Generating Plant Units 3 And 4 - NRC Security Inspection Reports 05200025/2017403, 05200026/2017403 (OUO Removed) N/A
11/09/17 Vogtle Electric Generating Plant, Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2017003, 05200026/2017003 N/A
09/20/17 Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License - NRC Integrated Inspection Reports 05200025/2017007, 05200026/2017007 N/A
08/10/17 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2017002, 05200026/2017002 N/A
05/12/17 Vogtle Electric Generating Units 3 and 4 - NRC Integrated Inspection Reports 5200025/2017001, 05200026/2017001 N/A
05/12/17 Vogtle Electric Generating Units 3 and 4 - NRC Security Inspection Reports 05200025/2017401, 05200026/2017401 and Notice of Violation (OUO REMOVED) N/A
03/14/17 Vogtle Electric Generating Units 3 and 4 - NRC Inspection of the Preoperational Initial Test Program, Reports 05200025/2017006, 05200026/201700 N/A
02/14/17 Vogtle Electric Generating Units 3 and 4 - NRC Security Inspection, Reports 05200025/2016404, 05200026/2016404 N/A
01/31/18 Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025/2016004, 05200026/2016004 N/A
02/13/17 Vogtle Electric Generating Plant, Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2016004, 05200026/2016004 N/A
12/20/16 Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2016008, 05200026/2016008 N/A
11/07/16 Vogtle Electric Generating Plant Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2016003, 05200026/2016003 N/A
10/26/16 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 And 4 - U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2016403 and 05200026/2016403 N/A
09/01/16 Vogtle, Unit 3 & 4 Combined License - NRC Program Inspection for Corrective Action Program Implementation Inspection, Reports 05200025/2016007, 05200026/2016007, July 18, 2016 through July 22, 2016 N/A
07/28/16 Vogtle, Units 3 & 4 Combined License, NRC Integrated Inspection Report 05200025/2016002 and 05200026/2016002, April 1, 2016 through June 30, 2016 N/A
12/19/17 Errata For Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License NRC Integrated Reports 05200025-2016001, 05200026-2016001 N/A
05/10/16 Vogtle Electric Generating Plant, Units 3 and 4 NRC Integrated Inspection Reports 05200025/2016001, 05200026/2016001, January 1, 2016 through March 31, 2016 N/A
01/29/16 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015004, and 05200026/2015004 N/A
12/30/15 Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program Reports 05200025/2015008 and 05200026/2015008; 11/16/2015 - 11/19/2015 N/A
10/28/15 Vogtle Electric Generating Plant Units 3 And 4 - NRC Integrated Inspection Reports 05200025/2015003, and 05200026/2015003 N/A
08/11/15 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015002, and 05200026/2015002 N/A
06/22/15 Vogtle Electric Generating Plant Units 3 and 4 - NRC Program Inspection for Management of Inspections, Tests, Analyses, and Acceptance Criteria and Corrective Action Program Implementation Inspection, Reports 05200025/2015007 and 05200026/2015007 N/A
04/30/15 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2015001 and 05200026/2015001 N/A
04/25/15 Vogtle Electric Generating Plant Units 3 AND 4 - NRC Simulator Inspection Reports 05200025/2015301 and 05200026/2015301 N/A
02/06/15 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014005 and 05200026/2014005 N/A
11/07/14 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014004, 05200026/2014004; on 07/01/2014 through 09/30/2014 N/A
10/30/14 Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, Periodic Quality Assurance Inspection Reports 05200025/2014014, 05200026/2014014; on 10/06/2014 Through 10/10/2014 N/A
08/06/14 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014-003, and 05200026/2014-003 N/A
04/22/14 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2014-002, and 05200026/2014-002 N/A
03/28/14 Vogtle Electric Generating Plant Units 3 and 4 - NRC Program Inspection for Management of Inspections, Tests, Analyses, and Acceptance Criteria and Corrective Action Program, Reports 05200025/2014-008 and 05200026/2014-008 N/A
01/24/14 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-005 and 05200026/2013-005 N/A
12/10/13 Southern Nuclear Operating Company, Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2013-009 and 05200026/2013-009 N/A
11/07/13 Vogtle, Unit 3 & 4, Routine Integrated Inspection Report, IR 05200025-13-004, 05200026-13-004; 07/01/2013 through 09/30/2013 N/A
07/26/13 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-003 and 05200026/2013-003 N/A
07/23/13 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Periodic Inspection of Quality Assurance Program, Reports 05200025/2013-008 and 05200026/2013-008 N/A
05/07/13 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2013-002 and 05200026/2013-002 N/A
09/20/16 Errata For Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Of Corrective Action Program, Report 05200025/2013-007, 05200026/2013-007 and Notice of Violation N/A
03/12/13 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection of Corrective Action Program, Reports 05200025/2013-007, 05200026/2013-007 and Notice of Violation Licensee Response
NRC Acknowledgement
01/30/13 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-005 and 05200026/2012-005 (EA-12-230) N/A
11/14/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-004, 05200026/2012-004, and Notice of Violation Licensee Response
NRC Acknowledgement
08/07/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-003, 05200026/2012-003 N/A
06/19/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC ITAAC Inspection - Inspection Reports 05200025/2012-009, 05200026/2012-009, and Notice of Violation Licensee Response
NRC Acknowledgement
06/19/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection of Corrective Action Program, Reports 05200025/2012-006, 05200026/2012-006, and Notice of Violation Licensee Response
Licensee Response
NRC Acknowledgement
05/18/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 - NRC ITAAC Inspection Report No. 05200025/2012-008 and Notice of Violation Licensee Response
NRC Acknowledgement
Licensee Response
NRC Acknowledgement
08/14/13



05/11/12
Errata - Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-002 and 05200026/2012-002

Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200025/2012-002, 05200026/2012-002
N/A
02/14/12 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-004, 05200025/2011-006, 05200026/2011-004 N/A
11/09/11 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-003, 05200025/2011-005, 05200026/2011-003 N/A
09/16/11 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2011-009 and Notice of Violation Applicant Response
NRC Acknowledgement
08/24/11 Vogtle Electric Generating Plant Unit 3 - NRC Inspection Report No. 05200025/2011-007; Equipment qualification activities at Wyle Laboratories' testing facility N/A
08/11/11 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Reports 05200011/2011-002, 05200025/2011-004, 05200026/2011-002 N/A
08/03/11 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2011-007; Quality Assurance program N/A
05/09/11 Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Report 05200011/2011001, 05200025/2011002, 05200026/2011001 N/A
02/14/11 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Integrated Inspection Report 05200011/2010-008; 05200025/2010-002; 05200026/2010-001 and Notice Of Violation Applicant Response
NRC Acknowledgment
12/22/10 Vogtle Electric Generating Plant ESP Site - NRC Inspection Report 05200011/2010004; Quality Assurance Program N/A
10/08/10 Southern Nuclear Operating Company Vogtle Electric Generating Plant ESP Site - NRC Integrated Inspection Report 05200011/2010-007 N/A
10/07/10 Southern Nuclear Operating Company Vogtle Electric Generating Plant ESP Site - NRC Security Baseline Inspection Report 05200011/2010003 and Notice of Violation Non-Public
06/17/10 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 - NRC Inspection Report 05200011/2010-002 N/A
05/04/10 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 - NRC Inspection Report 05200011/2010-001 N/A
04/16/10 NRC Inspection Report Nos. 05200025/2009-201 and 05200026/2009-201 and Notice of Violation Applicant Response
NRC Acknowledgment
12/16/09 Vogtle Electric Generating Plant - Security Inspection Report 05200011/2009001 N/A

Page Last Reviewed/Updated Tuesday, September 06, 2022