Change Notice 99-003

Issue Date: 03/09/1999

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 99-003.zip

 


 

  DELETED:   TRANSMITTED:  
  Number Date Number Date
1. IMC 2515 09/28/98 IMC 2515 03/09/99
2. IP 57050 06/20/83 IP 57050 03/09/99
3. IP 57060 06/20/83 IP 57060 03/09/99
4. IP 57070 06/20/83 IP 57070 03/09/99
5. IP 57080 06/20/83 IP 57080 03/09/99
TRAINING: No special training requirements have been identified for any documents issued with this change notice.
 
REMARKS: IMC 2515 (Reactor Inspection Program - Operations Phase) has been revised to redefine the backshift coverage policy. This change was prompted by the adoption of a flexible work schedule by many licensees. The manual chapter was also revised to reflect the suspension of SALP, which occurred September 15, 1998.
IP 57050 (Visual Testing Examination)
IP 57060 (Liquid Penetrant Testing Examination)
IP 57070 (Magnetic Particle Testing Examination)
IP 57080 (Ultrasonic Testing Examination)
 
These inspection procedures have been revised as part of the triennial review process for inspection program documents. As a result of this review the documents have been revised to change the emphasis from new plant construction to inservice inspection in addition to a general update of content and references.
   
DISTRIBUTION: Standard

END

Page Last Reviewed/Updated Friday, April 17, 2020