Assessment Study of RELAP5/MOD2 Cycle 36.05 Based on the Tihange-2 Reactor Trip of January 11, 1983 (NUREG/IA-0044)

On this page:

Download complete document

Publication Information

Date Published: March 1992

Prepared by:
G.P. Rouel, E.J. Stubbe

TRACTEBEL
Nuclear Department
Avenue Ariane
B-1200 Brussels
Belgium

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Published by:
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555

Availability Notice

Abstract

This report presents a code assessment study for RELAP-5 Hod-2/CYCLE 36.05 based on a plant transient ( TIHANGE 2 power plant following reactor trip ).

The plant trip from full power was performed as part of a commissioning test series on January 11th, 1983, and most important plant parameters were recorded on a Data Acquisition System ( DAS ).

The analysis by means of the frozen version of the RELAP-5/HOD-2/CYCLE 36.05 code was performed to qualify the plant input data deck for this plant and assess the code potential for simulating such transient.

This work is performed by TRACTEBEL, which is the Architect-Engineer for all Belgian nuclear power plants and a member of ICAP.