MOX Fuel Fabrication Facility Inspection Program Construction Phase- Quality Assurance (QA) Inspection Procedures
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
The procedures list was obtained from Inspection Manual Chapter 2630, "Mixed Oxide Fuel Fabrication Facility Construction Inspection Program"
Quality Assurance (QA) Inspection Procedures
IP Number |
Description |
IP 88106 |
Quality Assurance: Program Development and Implementation |
IP 88107 |
Quality Assurance: Design and Documentation Control |
IP 88108 |
Quality Assurance: Control of Materials, Equipment, and Services |
IP 88109 |
Quality Assurance: Inspection, Test Control, and Control of Measuring and Test Equipment |
IP 88110 |
Quality Assurance: Problem Identification, Resolution, and Corrective Action |
IP 88111 |
10 CFR 21 Inspection-Facility Construction |
IP 88112 |
Software validation (under development) |
IP 88113 |
Control of the Electronic Management of Data |
IP 88114 |
Quality Affecting Item Procurement (10 CFR 21) and Commercial Grade Item Dedication Process (Reactive) |
IP 88115 |
Supplier/Vendor Inspection |
IP 88116 |
Inspection of Quality Assurance Interfaces |
Page Last Reviewed/Updated Thursday, August 27, 2020