MOX Fuel Fabrication Facility Inspection Program Construction Phase- Quality Assurance (QA) Inspection Procedures

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

The procedures list was obtained from Inspection Manual Chapter 2630, "Mixed Oxide Fuel Fabrication Facility Construction Inspection Program"

Quality Assurance (QA) Inspection Procedures

IP Number Description
IP 88106 Quality Assurance: Program Development and Implementation
IP 88107 Quality Assurance: Design and Documentation Control
IP 88108 Quality Assurance: Control of Materials, Equipment, and Services
IP 88109 Quality Assurance: Inspection, Test Control, and Control of Measuring and Test Equipment
IP 88110 Quality Assurance: Problem Identification, Resolution, and Corrective Action
IP 88111 10 CFR 21 Inspection-Facility Construction
IP 88112 Software validation (under development)
IP 88113 Control of the Electronic Management of Data
IP 88114 Quality Affecting Item Procurement (10 CFR 21) and Commercial Grade Item Dedication Process (Reactive)
IP 88115 Supplier/Vendor Inspection
IP 88116 Inspection of Quality Assurance Interfaces

Page Last Reviewed/Updated Thursday, August 27, 2020