Generic Letters – 1989

Document Number Title Revision Publish Date Reviewed Date
GL-89-23 NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 -- 10/23/1989 --
GL-89-22 Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service -- 10/19/1989 --
GL-89-21 Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements -- 10/19/1989 --
GL-89-20 Protected Area Long-Term Housekeeping -- 09/26/1989 --
GL-89-19 Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) -- 09/20/1989 --
GL-89-18 Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" -- 09/06/1989 --
GL-89-17 Planned Administrative Changes to the NRC Operator Licensing Written Examination Process W 81 FR 73448
10/25/16
--
09/06/1989
GL-89-16 Installation of a Hardened Wetwell Vent -- 09/01/1989 --
GL-89-15 Emergency Response Data System -- 08/21/1989 --
GL-89-14 Line-Item Improvements in Technical Specifications - Removal of 3.25 Limit on Extending Surveillance Intervals -- 08/21/1989 --
GL-89-13 Service Water System Problems Affecting Safety-Related Equipment S1 04/04/1990 --
-- 07/18/1989 --
GL-89-12 Operator Licensing Examination -- 07/06/1989 --
GL-89-11 Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" -- 06/30/1989 --
GL-89-10 Safety-Related Motor-Operated Valve Testing and Surveillance S7 01/24/1996 --
S6 03/08/1994 --
S5 06/28/1993 --
S4 02/12/1992 --
S3 10/25/1990 --
S2 08/03/1990 --
S1 06/13/1990 --
-- 06/28/1989 --
GL-89-09 ASME Section III Component Replacements -- 05/08/1989 --
GL-89-08 Erosion/Corrosion-Induced Pipe Wall Thinning -- 05/02/1989 --
GL-89-07 Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs S1 08/21/1989 --
-- 04/28/1989 --
GL-89-06 Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) -- 04/12/1989 --
GL-89-05 Pilot Testing of the Fundamentals Examination -- 04/04/1989 --
GL-89-04 Guidance on Developing Acceptable Inservice Testing Programs S1 04/04/1995 --
-- 04/03/1989 --
GL-89-03 Operator Licensing Examination Schedule   81 FR 31969
05/20/2016
--
  03/24/1989
GL-89-02 Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products -- 03/21/1989 --
GL-89-01 Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications S1 11/14/1990 --
-- 01/31/1989 --