Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
RIS-05-31 |
Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the Use of Source, Byproduct, and Special Nuclear Material |
1 |
12/26/2017 |
-- |
-- |
12/22/2005 |
-- |
RIS-05-30 |
Clarification of Post-Fire Safe-Shutdown Circuit Regulatory Requirements |
-- |
12/20/2005 |
-- |
RIS-05-29 |
Anticipated Transients That Could Develop into More Serious Events |
-- |
12/14/2005 |
-- |
RIS-05-28 |
Scope of For-Cause Fitness-for-Duty Testing Required by 10 CFR 26.24(a)(3) |
-- |
11/22/2005 |
-- |
RIS-05-27 |
NRC Timeliness Goals, Prioritization of Incoming License Applications and Voluntary Submittal of Schedule for Future Actions for NRC Review |
1 |
01/13/2006 |
-- |
-- |
-- |
-- |
RIS-05-26 |
Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors |
-- |
11/07/2005 |
-- |
RIS-05-25 |
Clarification of NRC Guidelines for Control of Heavy Loads |
1 |
05/29/2007 |
-- |
-- |
10/31/2005 |
-- |
RIS-05-24 |
Control of Radiation Dose to Visitors of Hospital Patients |
-- |
11/23/2005 |
-- |
RIS-05-23 |
Clarification of the Physical Presence Requirement During Gamma Stereotactic Radiosurgery Treatments |
-- |
10/07/2005 |
-- |
RIS-05-22 |
Requirements for the Physical Protection During Transportation of Special Nuclear Material of Moderate and Low Strategic Significance: 10 CFR Part 73 Vs. Regulatory Guide 5.59 (1983) |
-- |
10/28/2005 |
-- |
RIS-05-21 |
Clarification of the Reporting Requirements in 10 CFR 20.2201 |
-- |
11/14/2005 |
-- |
RIS-05-20 |
Revision to NRC Inspection Manual Part 9900 Technical Guidance, "Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety". Attachment |
2 |
06/05/2015 |
-- |
1 |
04/16/2008 |
-- |
-- |
-- |
-- |
RIS-05-19 |
Preparation and Scheduling of Operator Licensing Examinations |
W |
81 FR 31969
05/20/2016 |
-- |
|
08/24/2005 |
RIS-05-18 |
Guidance for Establishing and Maintaining a Safety Conscious Work Environment |
-- |
08/25/2005 |
-- |
RIS-05-17 |
Clarification of Requirements for Application of the ASME Code Symbol Stamp on Safety-Related Components |
-- |
08/08/2005 |
-- |
RIS-05-16 |
Issuance of NRC Management Directive 8.17, Licensee Complaints Against NRC Employees |
-- |
08/10/2005 |
-- |
RIS-05-15 |
Reporting Requirements for Damaged Industrial Radiographic Equipment |
-- |
08/03/2005 |
-- |
RIS-05-14 |
Clarification of Implementing Guidance for Compensatory Measures Related to Access Authorization Orders |
-- |
07/21/2005 |
-- |
RIS-05-13 |
NRC Incident Response and the National Response Plan |
-- |
07/13/2005 |
-- |
RIS-05-12 |
Transportation of Radioactive Material Quantities of Concern NRC Threat Advisory and Protective Measures System |
W |
Superseded by RIS 2018-03 |
06/18 |
1 |
08/24/2011 |
-- |
W |
Superseded by RIS 2002-12I, Rev. 2 |
10/17 |
-- |
07/11/2005 |
-- |
RIS-05-11 |
Requirements for Power Reactor Licensees in Possession of Devices Subject to the General License Requirements of 10 CFR 31.5 |
-- |
07/11/2005 |
-- |
RIS-05-10 |
Performance-Based Approach for Associated Equipment in 10 CFR 34.20 |
-- |
06/10/2005 |
-- |
RIS-05-09 |
|
-- |
Not Issued |
-- |
RIS-05-08 |
Endorsement of Nuclear Energy Institute (NEI) Guidance "Range of Protective Actions for Nuclear Power Plant Incidents" |
-- |
06/06/2005 |
-- |
RIS-05-07 |
Compensatory Measures to Satisfy the Fire Protection Program Requirements |
-- |
04/19/2005 |
-- |
RIS-05-06 |
Reporting Requirements for Gauges Damaged at Temporary Job Sites |
-- |
04/18/2005 |
-- |
RIS-05-05 |
Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations |
-- |
03/23/2005 |
-- |
RIS-05-04 |
Guidance on the Protection of Unattended Openings that Intersect a Security Boundary or Area |
-- |
04/14/2005 |
-- |
RIS-05-03 |
10 CFR Part 40 Exemptions for Uranium Contained in Aircraft Counterweights - Storage and Repair |
-- |
02/28/2005 |
-- |
RIS-05-02 |
Clarifying the Process for Making Emergency Plan Changes |
1 |
04/19/2011 |
-- |
W |
Superseded by RIS 2005-02, Rev. 1 |
10/17 |
-- |
02/14/2005 |
-- |
RIS-05-01 |
Changes To Notice Of Enforcement Discretion Process And Staff Guidance |
1 |
03/13/2013 |
-- |
-- |
02/07/2005 |
-- |