StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Design of Structures, Components, Equipment, andSystems (NUREG-0800, Chapter 3)

This NUREG publication has been issued for public comment. Comments will be accepted until May 1, 2013. To submit comments, please see Docket ID Number NRC-2013-0041.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
3.2.1 Seismic Classification Rev. 3 08/2016
Draft Rev. 3 08/2015
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.2.2 System Quality Group Classification Rev. 3 08/2016
Draft Rev. 3 08/2015
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.3.1 Wind Loadings Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
3.3.2 Tornado Loadings Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
3.4.1 Internal Flood Protection for Onsite Equipment Failures Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 03/1978
Rev. 0 11/1975
3.4.2 Analysis Procedures Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 NONE
Rev. 0 11/1975
3.5.1.1 Internally Generated Missiles (Outside Containment) Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
3.5.1.2 Internally-Generated Missiles (Inside Containment) Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
3.5.1.3 Turbine Missiles Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
3.5.1.4 Missiles Generated by Tornadoes and Extreme Winds Rev. 4 03/2015
Draft Rev. 4 07/2013
Rev. 3 03/2007
Draft Rev. 3 01/2006
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
3.5.1.5 Site Proximity Missiles (Except Aircraft) Rev. 4 03/2007
Rev. 3 06/1996
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.5.1.6 Aircraft Hazards Rev. 4 03/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 NONE
Rev. 0 11/1975
3.5.2 Structures, Systems, and Components to be Protected from Externally-Generated Missiles Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 03/1978
Rev. 0 11/1975
3.5.3 Barrier Design Procedures Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.6.1 Plant Design for Protection Against Postulated Piping Failures in Fluid Systems Outside Containment Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 10/1990
Rev. 1 07/1981
Rev. 0 11/1975
3.6.2 Determination of Rupture Locations and Dynamic Effects Associated with the Postulated Rupture of Piping Rev. 3 12/2016
Draft Rev. 3 08/2015
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.6.3 Leak-Before-Break Evaluation Procedures Rev. 1 03/2007
Rev. 0 03/1987
3.7.1 Seismic Design Parameters Rev. 4 12/2014
Draft Rev. 4 03/2013
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 08/1989
Rev. 1 07/1981
Rev. 0 11/1975
3.7.2 Seismic System Analysis Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 08/1989
Rev. 1 07/1981
Rev. 0 11/1975
3.7.3 Seismic Subsystem Analysis Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 08/1989
Rev. 1 07/1981
Rev. 0 11/1975
3.7.4 Seismic Instrumentation Rev. 3 07/2014
Draft Rev. 3 08/2013
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.8.1 Concrete Containment Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.8.2 Steel Containment Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.8.3 Concrete and Steel Internal Structures of Steel or Concrete Containments Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.8.4 Other Seismic Category I Structures Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.8.5 Foundations Rev. 4 09/2013
Draft Rev. 4 03/2013
Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.9.1 Special Topics for Mechanical Components Rev. 4 12/2016
Draft Rev. 4 08/2015
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
3.9.2 Dynamic Testing and Analysis of Systems, Structures, and Components Rev. 4 03/2017
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
3.9.3 ASME Code Class 1, 2, and 3 Components, and Component Supports, and Core Support Structures Rev. 3 04/2014
Draft Rev. 3 06/2013
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
3.9.4 Control Rod Drive Systems Rev. 4 03/2017
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 04/1984
Rev. 1 07/1981
Rev. 0 11/1975
3.9.5 Reactor Pressure Vessel Internals Rev. 4 03/2017
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
3.9.6 Functional Design, Qualification, and Inservice Testing Programs for Pumps, Valves, and Dynamic Restraints Rev. 4 03/2017
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
3.9.7 Risk-Informed Inservice Testing Rev. 0 08/1998
3.9.8 Risk-Informed Inservice Inspection of Piping Rev. 0 09/2003
3.10 Seismic and Dynamic Qualification of Mechanical and Electrical Equipment Rev. 4 12/2016
Draft Rev. 4 08/2015
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
3.11 Environmental Qualification of Mechanical and Electrical Equipment Draft Rev. 4 12/2017
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
3.12 ASME Code Class 1, 2, and 3 Piping Systems, Piping Components and their Associated Supports Rev. 1 04/2014
Draft Rev. 1 06/2013
Initial Issuance 03/2007
3.13 Threaded Fasteners - ASME Code Class 1, 2, and 3 Initial Issuance 03/2007
Draft Rev. 0 06/1996
  Branch Technical Positions (BTPs)    
BTP 3-1 Classification of Main Steam Components Other than the Reactor Coolant Pressure Boundary for BWR Plants (Former Section 3.2.2, Appendix A, BTP has been separated into an individual section.) Rev. 2 03/2007
BTP 3-2 Classification of BWR/6 Main Steam and Feedwater Components Other than the Reactor Coolant Pressure Boundary (Former Section 3.2.2, Appendix B, BTP has been separated into an individual section.) Rev. 2 03/2007
BTP 3-3 Protection Against Postulated Piping Failures in Fluid Systems Outside Containment (Former Section 3.6.1 BTP has been separated into an individual section.) Rev. 3 03/2007
BTP 3-4 Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment (Former Section 3.6.3 BTP has been separated into an individual section.) Rev. 3 12/2016
Draft Rev. 3 08/2015
Rev. 2 03/2007