This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Division 5.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Revision No. Issue
Date
Additional Information
5.61 Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites
(WithdrawnSee 85 FR 56281)
W 09/2020  
0 06/1980  
5.62 Physical Security Event Notifications, Reports, and Records 2 03/2023  
1 11/1987 Reviewed in 2012 – No issues identified
0 02/1981  
5.63 Physical Protection for Transient Shipments 0 07/1982 Reviewed in 2020 – Issues identified for future consideration
5.65 Vital Area Access Controls, Protection of Physical Security Equipment, and Key and Lock Controls
(WithdrawnSee 82 FR 52337 11/13/2017)
W 11/2017  
0 09/1986  
5.66 Access Authorization Program for Nuclear Power Plants 2 10/2011 Periodic Review July 2017 – No Action
1 04/2009
OUO-SRI
 
5.67 Material Control and Accounting for Uranium Enrichment Facilities Authorized To Produce Special Nuclear Material of Low Strategic Significance
(Withdrawn -- See 83 FR 47648, 9/20/2018)
W 10/2012  
0 12/1993  
5.68 Protection Against Malevolent Use of Vehicles at Nuclear Power Plants
(Withdrawn -- See 77 FR 60482, 10/3/2012)
W 09/2018  
0 08/1994 Reviewed in 2013 – No issues identified
5.69 Guidance for the Application of Radiological Sabotage Design-Basis Threat in the Design, Development and Implementation of a Physical Security Program that Meets 10 CFR 73.55 Requirements (SGI) 1 03/2022
SGI
 
0 09/2007
SGI
Reviewed in 2014 – issues identified
5.70 Guidance for the Application of the Theft and Diversion Design-Basis Treat in the Design Development, and Implementation of a Physical Security Program that Meets CFR 73.45 and 73.46 (Classified) 1 02/2017
Classified
 
0 09/2007
Classified
 
5.71 Cyber Security Programs for Nuclear Power Reactors 1 02/2023  
0 01/2010 Reviewed in 2015 – Revise
5.73 Fatigue Management for Nuclear Power Plant Personnel 0 03/2009 10/2019 – Reviewed with issues identified for future consideration
5.74 Managing the Safety/Security Interface 1 04/2015  
0 06/2009  
5.75 Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities 1 03/2021  
0 07/2009  
5.76 Physical Protection Programs at Nuclear Power Reactors (SGI) 1 11/2020
SGI
 
0 07/2009
SGI
Reviewed in 2014 – N/A
SGI
5.77 Insider Mitigation Program 1 09/2022  
0 03/2009
OUO-SRI
 
5.78 Physical Protection of Mixed Oxide Fuels in Nuclear Power Plants (SGI) 0 07/2010
SGI
Reviewed in 2015 – No issues identified
5.79 Protection of Safeguards Information 0 04/2011 Reviewed in 2020 – No Issues
5.80 Pressure-Sensitive And Tamper-Indicating Device Seals For Material Control And Accounting Of Special Nuclear Material 0 12/2010 Reviewed in 2015 – No issues identified