Release Date |
SECY
Number |
Description |
SECY Paper |
SRM |
CVR |
Trans-
cript |
12/31/2002 |
SECY-02-0224 |
Weekly Information Report - Week Ending December 20, 2002 |
|
|
|
|
12/23/2002 |
SECY-02-0220 |
Weekly Information Report - Week Ending December 13, 2002 |
|
|
|
|
12/23/2002 |
|
12/18/2002 Commission Meeting: Meeting with the Advisory Committee on Nuclear Waste (ACNW) |
|
|
|
|
12/23/2002 |
|
12/17/2002 Commission Meeting: Briefing on Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues |
|
|
|
|
12/19/2002 |
SECY-02-0218 |
Weekly Information Report - Week Ending December 6, 2002 |
|
|
|
|
12/18/2002 |
CLI-02-29 |
Commission Memorandum and Order Rejecting a claim of the State of Utah that the Commission lacked authority to license an independent spent fuel storage facility. The Commission further denied Utah's petition for rulemaking. |
|
|
|
|
12/18/2002 |
CLI-02-28 |
Commission Memorandum and order clarifying its decision in CLI-02-17 and addressing a certified question of the Atomic Safety and Licensing Board (ASLBP) with respect to the licensee's Severe Accident Mitigation Alternatives analysis. The case was remanded to the ASLBP for further proceedings. |
|
|
|
|
12/18/2002 |
CLI-02-27 |
Commission Memorandum and Order affirming the decision of the Atomic Safety and Licensing Board (ASLBP) in LBP-02-05 that rejected the terrorism contention proposed by intervenors Connecticut Coalition Against Millstone and the Long Island Coalition Against Millstone. |
|
|
|
|
12/18/2002 |
CLI-02-26 |
Commission Memorandum and Order addressing the contentions of the Nuclear Information and Resource Service on terrorism, certified to the Commission by the Atomic Safety and Licensing Board (ASLBP) for this proceeding in LBP-02-04. The Commission declined to consider the contentions on terrorism and directed the ASLBP to reject the contentions. |
|
|
|
|
12/18/2002 |
CLI-02-25 |
Commission Memorandum and Order affirming the decision of the Atomic Safety and Licensing Board (ASLBP) that rejected the late filed contention of the State of Utah on terrorism. |
|
|
|
|
12/18/2002 |
CLI-02-24 |
Commission Memorandum and Order reversing the decision of the Atomic Safety and Licensing Board (ASLBP) to admit a contention of Georgians Against Nuclear Energy on terrorism. |
|
|
|
|
12/18/2002 |
|
12/18/2002 Commission Meeting: Affirmation Session |
|
|
|
|
12/12/2002 |
|
11/21/2002 Commission Meeting: Briefing on Proposed Rulemaking to Add New Section 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
|
|
|
|
12/09/2002 |
SECY-02-0213 |
Weekly Information Report - Week Ending November 29, 2002 |
|
|
|
|
12/09/2002 |
SECY-02-0206 |
Weekly Information Report - Week Ending November 15, 2002 |
|
|
|
|
12/05/2002 |
SECY-02-0204 |
Update of Uranium Recovery Guidance Documents |
|
|
|
|
12/04/2002 |
SECY-02-0179 |
Final Rule: Material Control and Accounting Amendments |
|
|
|
|
12/03/2002 |
SECY-02-0210 |
Weekly Information Report - Week Ending November 22, 2002 |
|
|
|
|
11/26/2002 |
SECY-02-0089 |
Revised Draft Nureg-1633 and Public Information Brochure on Potassium Iodide (KI) For the General Public |
|
|
|
|
11/26/2002 |
SECY-02-0198 |
Changes in Staff Regulatory Oversight of Decommissioning Commercial Nuclear Power Reactor Plants |
|
|
|
|
11/26/2002 |
|
11/21/2002 Commission Meeting: Briefing on Proposed Rulemaking to Add New Section 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
|
|
|
|
11/22/2002 |
SECY-02-0057 |
Commissioner Diaz's Comments on SECY-02-0057 - Update to SECY-01-0133, "Fourth Status Report on Study of Risk-Informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-Informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" |
|
|
|
|
11/21/2002 |
SECY-02-0179 |
Final Rule: Material Control and Accounting Amendments |
|
|
|
|
11/21/2002 |
CLI-02-23 |
Commission Memorandum and Order denying the petitioners' request that the Commission suspend the proceeding on this docket pending the Commission's comprehensive review of measures to protect against terrorist attack. |
|
|
|
|
11/21/2002 |
CLI-02-22 |
Commission Memorandum and Order affirming LBP-02-16, which denied the request of the intervenors Connecticut Coalition Against Millstone and Long Island Coalition Against Millstone for an evidentiary hearing on reopened Contention 4 and terminated the proceeding. |
|
|
|
|
11/21/2002 |
SECY-02-0084 |
Final Rule on Decommissioning Trust Provisions |
|
|
|
|
11/20/2002 |
COMEXM-01-0001 |
D.C. Cook Potential Red Finding, and the Implementation of the Significance Determination Process Within the Reactor Oversight Program |
|
|
|
|
11/19/2002 |
SECY-02-0201 |
Weekly Information Report - Week Ending November 8, 2002 |
|
|
|
|
11/19/2002 |
SECY-02-0194 |
Options for Addressing Part 35 Training and Experience Issues Associated With Recognition of Speciality Boards by NRC |
|
|
|
|
11/13/2002 |
SECY-02-0197 |
Weekly Information Report - Week Ending November 1, 2002 |
|
|
|
|
11/07/2002 |
SECY-02-0182 |
Equal Employment Opportunity (EEO) Briefing |
|
|
|
|
11/04/2002 |
|
10/31/2002 Commission Meeting: Briefing on the EEO Program |
|
|
|
|
10/31/2002 |
SECY-02-0193 |
Weekly Information Report - Week Ending October 25, 2002 |
|
|
|
|
10/31/2002 |
SECY-02-0186 |
Status Report on Performance-Based Approaches to Regulation |
|
|
|
|
10/28/2002 |
SECY-02-0189 |
Weekly Information Report - Week Ending October 18, 2002 |
|
|
|
|
10/28/2002 |
SECY-02-0133 |
Control of Solid Materials: Options and Recommendations for Proceeding |
|
|
|
|
10/28/2002 |
SECY-02-0182 |
Equal Employment Opportunity (EEO) Briefing |
|
|
|
|
10/21/2002 |
SECY-02-0187 |
Weekly Information Report - Week Ending October 11, 2002 |
|
|
|
|
10/18/2002 |
SECY-02-0176 |
Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components" (WITS 199900061) |
|
|
|
|
10/16/2002 |
SECY-02-0169 |
2002 Annual Update - Status of Decommissioning Program |
|
|
|
|
10/16/2002 |
SECY-02-0177 |
Initial Analysis and Plan for Addressing License Termination Rule Issues |
|
|
|
|
10/15/2002 |
SECY-02-0181 |
Weekly Information Report - Week Ending October 4, 2002 |
|
|
|
|
10/15/2002 |
SECY-02-0174 |
Litigation Report - 2002 - 3 |
|
|
|
|
10/09/2002 |
SECY-02-0173 |
Advisory Committee on the Medical Uses of Isotopes -- Update on Committee Activites |
|
|
|
|
10/08/2002 |
SECY-02-0171 |
Licensing Support Network Program Administration - Semiannual Report |
|
|
|
|
10/04/2002 |
SECY-02-0023A |
Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort |
|
|
|
|
10/04/2002 |
SECY-02-0023 |
Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort |
|
|
|
|
10/04/2002 |
SECY-02-0132 |
Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) |
|
|
|
|
10/04/2002 |
SECY-02-0178 |
Weekly Information Report - Week Ending September 27, 2002 |
|
|
|
|
10/04/2002 |
SECY-02-0166 |
Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues |
|
|
|
|
10/03/2002 |
|
10/01/2002 Commission Meeting: Briefing on Decommissioning Activities and Status |
|
|
|
|
10/02/2002 |
|
10/01/2002 Commission Meeting: Affirmation Session |
|
|
|
|
10/01/2002 |
CLI-02-21 |
Commission Memorandum and Order affirming LBP-02-12, the decision of the Presiding Officer finding that petitioner Glen Canyon Group of the Sierra Club lacked standing to challenge the license amendment and terminating the proceeding. |
|
|
|
|
10/01/2002 |
CLI-02-20 |
Commission Memorandum and Order reversing the decision of the Atomic Safety and Licensing Board to partially deny applicant's motion for summary disposition on the environmental justice contention, OGD O. |
|
|
|
|
10/01/2002 |
|
Staff Requirements Memorandum: Affirmation Session |
|
|
|
|
10/01/2002 |
SECY-02-0169 |
2002 Annual Update - Status of Decommissioning Program |
|
|
|
|
09/30/2002 |
SECY-02-0172 |
Weekly Information Report - Week Ending September 20, 2002 |
|
|
|
|
09/23/2002 |
SECY-02-0168 |
Weekly Information Report - Week Ending September 13, 2002 |
|
|
|
|
09/20/2002 |
SECY-02-0138 |
Denial of Petition for Rulemaking on Mandatory Submittal of Performance Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) |
|
|
|
|
09/19/2002 |
SECY-02-0127 |
Proposed Response to State of Ohio on Its Assured Isolation Storage Facility Draft Rules |
|
|
|
|
09/16/2002 |
SECY-02-0165 |
Weekly Information Report - Week Ending September 6, 2002 |
|
|
|
|
09/13/2002 |
SECY-02-0158 |
Litigation Report - 2002 - 02 |
|
|
|
|
09/11/2002 |
SECY-02-0067 |
Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC) |
|
|
|
|
09/10/2002 |
SECY-02-0122 |
Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership or Control |
|
|
|
|
09/06/2002 |
SECY-02-0162 |
Weekly Information Report - Week Ending August 30, 2002 |
|
|
|
|
09/04/2002 |
CLI-02-019 |
Commission Memorandum and Order responding to Licensing Board's certified question and accepting the Board's recommendations regarding procedures for dealing with restricted data and/or national security information in this adjudication. |
|
|
|
|
09/04/2002 |
SECY-02-0135 |
Final Rule: 10 CFR Part 63: Specification of a Probability for Unlikely Features, Events, and Processes |
|
|
|
|
09/04/2002 |
|
09/04/2002 Commission Meeting: Affirmation Session |
|
|
|
|
08/29/2002 |
SECY-02-0159 |
Weekly Information Report - Week Ending August 23, 2002 |
|
|
|
|
08/29/2002 |
|
Staff Requirements Memorandum: Briefing on Special Review Group Response to the Differing Professional Opinion/Differing Professional View Review |
|
|
|
|
08/28/2002 |
|
Staff Requirements Memorandum: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
|
08/27/2002 |
SECY-02-0116 |
Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance Amendments for Materials Licensees |
|
|
|
|
08/27/2002 |
SECY-02-0111 |
Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5 REM) From a Patient Released Under 10 CFR 35.75 |
|
|
|
|
08/27/2002 |
|
Staff Requirements Memorandum: Briefing on NRC International Activities |
|
|
|
|
08/27/2002 |
|
08/21/2002 Commission Meeting: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
|
08/26/2002 |
|
08/21/2002 Commission Meeting: Briefing on NRC International Activities |
|
|
|
|
08/26/2002 |
SECY-02-0156 |
Weekly Information Report - Week Ending August 16, 2002 |
|
|
|
|
08/21/2002 |
SECY-02-0155 |
Weekly Information Report - Week Ending August 9, 2002 |
|
|
|
|
08/20/2002 |
SECY-02-0107 |
Addendum to SECY-02-0074: "National Materials Program: Pilot Projects" |
|
|
|
|
08/20/2002 |
SECY-01-0112 |
National Materials Program: Transmittal of the Final Working Group Report Presenting Options for a National Materials Program |
|
|
|
|
08/16/2002 |
SECY-02-0149 |
Proposed Bulletin, "Reactor Pressure Vessel Head And Vessel Head Penetrations Inspection Programs" |
|
|
|
|
08/16/2002 |
SECY-02-0148 |
Summary of Activities Related to Generic Safety Issues |
|
|
|
|
08/14/2002 |
|
08/13/2002 Commission Meeting: Briefing on Special Review Group Response to the Differing Professional Opinion/Differing Professional View (DPO/DPV) Review |
|
|
|
|
08/12/2002 |
SECY-02-0144 |
Process Used to Determine When Further Research on A Particular Item Should be Closed or Terminated |
|
|
|
|
08/09/2002 |
SECY-02-0150 |
Weekly Information Report - Week Ending August 2, 2002 |
|
|
|
|
08/09/2002 |
SECY-02-0143 |
Assessment of the Possible Effects of Nuclear Industry Consolidation on NRC Oversight |
|
|
|
|
08/09/2002 |
SECY-02-0112 |
NRC Review of Idaho National Engineering and Environmental Laboratory Draft Incidental Waste (Waste Incidental to Reprocessing) Determination for Sodium-bearing Waste |
|
|
|
|
08/08/2002 |
COMSECY-02-0040 |
Proposed Rule - Part 170 Fees for Contested Hearings Related to National Security Initiatives |
|
|
|
|
08/08/2002 |
SECY-02-0142 |
Status of the General License Program |
|
|
|
|
08/07/2002 |
SECY-02-0139 |
Plan for Resolving Policy Issues Related to Licensing Non-Light Water Reactor Designs |
|
|
|
|
08/05/2002 |
SECY-02-0147 |
Weekly Information Report - Week Ending July 26, 2002 |
|
|
|
|
08/01/2002 |
CLI-02-018 |
Commission Memorandum and Order requesting briefs from the petitioners and the applicant on the question of whether the Commission has the statutory authority to retain or impose antitrust conditions for nuclear power plants licensed under Section 104.b of the Atomic Energy Act. |
|
|
|
|
08/01/2002 |
|
08/01/2002 Commission Meeting: Affirmation Session |
|
|
|
|
07/29/2002 |
SECY-02-0131 |
Update of the Risk-Informed Regulation Implementation Plan |
|
|
|
|
07/29/2002 |
SECY-02-0130 |
Status of Proposed Amendments to Emergency Preparedness Regulations in 10 CFR 50 Appendix E |
|
|
|
|
07/26/2002 |
SECY-02-0141 |
Weekly Information Report - Week Ending July 19, 2002 |
|
|
|
|
07/25/2002 |
SECY-02-0095 |
Applicability of Section 11e.(2) of the Atomic Energy Act to Material at the Sequoyah Fuels Corporation Uranium Conversion Facility |
|
|
|
|
07/24/2002 |
SECY-02-0134 |
Weekly Information Report - Week Ending July 12, 2002 |
|
|
|
|
07/23/2002 |
CLI-02-17 |
Commission Memorandum and Order affirming in part and reversing in part the decision of the Atomic Safety and Licensing Board in LBP-02-04 on the admissibility of petitioners' contention on the adequacy of the licensee's Server Accident Mitigation Alternatives analysis. |
|
|
|
|
07/23/2002 |
SECY-02-0096 |
Direct Final Rule on Electronic Maintenance and Submission of Information |
|
|
|
|
07/23/2002 |
|
07/23/2002 Commission Meeting: Affirmation Session |
|
|
|
|
07/23/2002 |
SECY-02-0125 |
Advisory Committee on the Medical Uses of Isotopes -- Results of the October 29, 2001, and the February 20, 2002 Meetings |
|
|
|
|
07/22/2002 |
SECY-02-0132 |
Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) |
|
|
|
|
07/17/2002 |
|
07/10/2002 Commission Meeting: Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
|
07/16/2002 |
SECY-02-0126 |
Weekly Information Report - Week Ending July 5, 2002 |
|
|
|
|
07/15/2002 |
|
07/10/2002 Commission Meeting: Briefing on License Renewal Program and Power Uprate Review Activities |
|
|
|
|
07/11/2002 |
|
06/26/2002 Commission Meeting: All Employees Meeting |
|
|
|
|
07/12/2002 |
|
07/10/2002 Commission Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
|
07/09/2002 |
SECY-02-0115 |
Effectiveness and Efficiency Plan for Power Uprates |
|
|
|
|
07/09/2002 |
SECY-02-0123 |
Weekly Information Report - Week Ending June 28, 2002 |
|
|
|
|
07/05/2002 |
SECY-02-0114 |
Weekly Information Report - Week Ending June 21, 2002 |
|
|
|
|
07/01/2002 |
|
05/01/2002 Commission Meeting: Briefing on the Results of Agency Action Review Meeting - Reactors |
|
|
|
|
07/01/2002 |
SECY-02-0106 |
Review of ACRS Recommendations for the Staff to Develop a Standard Review Plan for Power Uprate Reviews |
|
|
|
|
06/28/2002 |
SECY-02-0090 |
Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear Regulatory Commission Regulation of Nuclear Safety at the U.S. Department of Energy's Non-Defense Science Laboratories |
|
|
|
|
06/28/2002 |
SECY-02-0080 |
Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) |
|
|
|
|
06/27/2002 |
|
06/26/2002 Commission Meeting: All Employees Meeting - P.M. Session |
|
|
|
|
06/27/2002 |
|
06/26/2002 Commission Meeting: All Employees Meeting - A.M. Session |
|
|
|
|
06/26/2002 |
SECY-02-0098 |
Status of the Staff's Evaluation of the Possible Use of Alternative Dispute Resolution in the Agency's Enforcement Program |
|
|
|
|
06/26/2002 |
SECY-02-0081 |
Staff Activities Related to the NRC Goal of Reducing Unnecessary Regulatory Burden on Power Reactor Licensees |
|
|
|
|
06/26/2002 |
SECY-02-0108 |
Weekly Information Report - Week Ending June 14, 2002 |
|
|
|
|
06/26/2002 |
|
06/25/2002 Commission Meeting: Affirmation Session |
|
|
|
|
06/25/2002 |
CLI-02-16 |
Commission Memorandum and Order denying the petitions to intervene of the California Public Utilities Commission (CPUC), the County of San Luis Obispo (County) and the Official Committee of Unsecured Creditors of PG&E. |
|
|
|
|
06/19/2002 |
COMSECY-
02-0022 |
Response to Letter from American Ecology Regarding Classification of FUSRAP Material at Maywood, New Jersey |
|
|
|
|
06/19/2002 |
SECY-02-0099 |
Litigation Report - 2002 - 1 |
|
|
|
|
06/18/2002 |
SECY-02-0043 |
Proposed Rule: Geological and Seismological Characteristics for the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations and Monitored Retrievable Storage Installations - 10 CFR Part 72 |
|
|
|
|
06/14/2002 |
SECY-02-0102 |
Weekly Information Report - Week Ending June 7, 2002 |
|
|
|
|
06/14/2002 |
SECY-02-0092 |
Status Report: Risk Metrics and Criteria for Pressurized Thermal Shock |
|
|
|
|
06/07/2002 |
SECY-02-0097 |
Weekly Information Report - Week Ending May 31, 2002S |
|
|
|
|
06/05/2002 |
SECY-02-0088 |
Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power Operating Licenses |
|
|
|
|
06/05/2002 |
SECY-02-0077 |
Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants" |
|
|
|
|
06/04/2002 |
SECY-02-0091 |
Weekly Information Report - Week Ending May 24, 2002 |
|
|
|
|
05/31/2002 |
|
05/29/2002 Commission Meeting: Briefing on the Status of New Reactor Licensing Activities |
|
|
|
|
05/30/2002 |
COMSECY-
02-0024 |
Renewal of Advisory Committee on Nuclear Waste Charter |
|
|
|
|
|
05/29/2002 |
COMSECY
-02-0015 |
Withholding Sensitive Homeland Security Information From the Public |
|
|
|
|
05/24/2002 |
SECY-02-0087 |
Weekly Information Report - Week Ending May 17, 2002 |
|
|
|
|
05/21/2002 |
SECY-02-0074 |
National Materials Program: Pilot Projects |
|
|
|
|
05/20/2002 |
SECY-02-0086 |
Weekly Information Report - Week Ending May 10, 2002 |
|
|
|
|
05/20/2002 |
SECY-02-0080 |
Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) |
|
|
|
|
05/20/2002 |
SECY-02-0070 |
Publication of Revisions 1 to Regulatory Guide 1.174 and SRP Chapter 19 and Notice of a Staff Plan for Endorsing Consensus Probabilistic Risk Assessment Standards and Industry Peer Review Programs |
|
|
|
|
05/20/2002 |
|
05/16/2002 Commission Meeting: Meeting With World Association of Nuclear Operators (WANO) |
|
|
|
|
05/13/2002 |
SECY-02-0078 |
Weekly Information Report - Week Ending May 3, 2002 |
|
|
|
|
05/10/2002 |
SECY-02-0076 |
Semi-Annual Update of the Future Licensing and Inspection Readiness Assessment (FLIRA) |
|
|
|
|
05/10/2002 |
SECY-02-0068 |
Proposed Rule on Financial Information Requirements for Applications to Renew or Extend the Term of an Operating License for a Power Reactor |
|
|
|
|
05/09/2002 |
SECY-02-0073 |
Weekly Information Report - Week Ending April 26, 2002 |
|
|
|
|
05/08/2002 |
SECY-02-0060 |
Proposed Policy on Enhancing Public Participation in NRC Meeting |
|
|
|
|
05/06/2002 |
|
05/01/2002 Commission Meeting: Briefing on the Results of Agency Action Review Meeting - Reactors |
|
|
|
|
05/02/2002 |
SECY-02-0071 |
Weekly Information Report - Week Ending April 19, 2002 |
|
|
|
|
04/23/2002 |
SECY-02-0069 |
Weekly Information Report - Week Ending April 12, 2002 |
|
|
|
|
04/23/2002 |
SECY-02-0032 |
Report to Congress on Abnormal Occurrences for Fiscal Year 2001 |
|
|
|
|
04/22/2002 |
SECY-02-0067 |
Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC) |
|
|
|
|
04/22/2002 |
SECY-02-0064 |
Results from Pilot Program for NMSS Initiative on Streamlining Inspection and Enforcement |
|
|
|
|
04/06/2002 |
SECY-02-0066 |
Weekly Information Report - Week Ending April 5, 2002 |
|
|
|
|
04/16/2002 |
|
04/12/2002 Commission Meeting: Affirmation Session |
|
|
|
|
|
04/15/2002 |
SECY-02-0062 |
Calendar Year 2001 Reactor Oversight Process Self Assessment |
|
|
|
|
04/15/2002 |
SECY-02-0059 |
Use of Design Acceptance Criteria for the AP1000 Standard Plant Design |
|
|
|
|
04/15/2002 |
SECY-02-0058 |
Results of the Industry Trends Program for Operating Power Reactors and Status of Ongoing Development |
|
|
|
|
04/12/2002 |
COMSECY
-02-0014 |
Re-affirmation of the Final Rule on Part 35 -- Medical Use of Byproduct Material |
|
|
|
|
|
04/12/2002 |
CLI-02-15 |
Private Fuel Storage -- Order granting an April 5, 2002 motion filed by Intervenor Skull Valley Band of Goshute Indians for a Commission Protective Order. |
|
|
|
|
04/12/2002 |
CLI-02-14 |
McGuire and Catawba -- Reversing the decision of the Atomic Safety and Licensing Board in LBP-02-04 to admit a contention from the intervenors on the possible use of mixed oxide fuel at the McGuire and Catawba plants. |
|
|
|
|
04/12/2002 |
CLI-02-13 |
International Uranium (USA) Corporation -- Commission Memorandum and Order vacating LBP-02-03 and an unpublished Memorandum and Order of January 2, 2002, and remanding the proceeding to the Presiding Officer for reconsideration of a rejected filing and, if appropriate, the issue of standing for petitioner Sierra Club. |
|
|
|
|
04/12/2002 |
CLI-02-12 |
Diablo Canyon -- Commission Memorandum and Order requiring briefs from the parties on two issues prior to considering the petitions to intervene. |
|
|
|
|
04/09/2002 |
SECY-02-0057 |
Update to Secy-01-0133, "Fourth Status Report on Study of Risk-Informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-Informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" |
|
|
|
|
04/08/2002 |
SECY-02-0061 |
Weekly Information Report - Week Ending March 29, 2002 |
|
|
|
|
04/05/2002 |
SECY-02-0051 |
Annual Paper - NRC Staff Participation in IAEA and NEA Activities |
|
|
|
|
04/04/2002 |
SECY-02-0044 |
Annual Status Report for FY 2001 on the Administration of the NRC's Requalification Program and the Results of Initial Operator Licensing Examinations (WITS 198800098) |
|
|
|
|
04/04/2002 |
SECY-02-0046 |
Proposed Bulletin: "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity" |
|
|
|
|
04/04/2002 |
|
04/03/2002 Commission Meeting: Affirmation Session |
|
|
|
|
04/03/2002 |
CLI-02-11 |
Private Fuel Storage -- Commission Memorandum and Order denying a request for a stay submitted by the state of Utah. The order further invites responses by May 15, 2002, on the issue of whether NRC has authority under the federal law to issue a license for the proposed privately-owned, away-from-reactor spent fuel storage facility. The order specifically invites interested persons to file amicus curiae briefs by the May 15 response deadline. |
|
|
|
|
04/03/2002 |
CLI-02-10 |
International Uranium (USA) Corporation -- Commission Memorandum and Order affirming LBP-02-06 which granted standing to the petitioners herein, denying their motion for a stay of the effectiveness of the licensing amendment and denying the motion of the licensee that the brief of petitioner Sierra Club be stricken as untimely. Other motions of the parties are declared moot by this order. |
|
|
|
|
04/03/2002 |
CLI-02-09 |
Duke, Cogema, Stone & Webster -- Commission Memorandum and Order denying the petition of Duke, Cogema, Stone & Webster for interlocutory review of a Licensing Board order admitting intervenors' contentions. |
|
|
|
|
04/02/2002 |
SECY-02-0056 |
Weekly Information Report - Week Ending March 22, 2002 |
|
|
|
|
03/26/2002 |
|
03/20/2002 Commission Meeting with the Advisory Committee on Nuclear Waste |
|
|
|
|
03/25/2002 |
SECY-02-0049 |
Weekly Information Report - Week Ending March 15, 2002 |
|
|
|
|
03/25/2002 |
SECY-02-0041 |
Status of Accident Sequence Precursor and Spar Model Development Programs |
|
|
|
|
03/25/2002 |
|
03/19/2002 Commission Meeting: Briefing on RES Programs, Performance, and Plans |
|
|
|
|
03/22/2002 |
SECY-02-0040 |
Status of USNRC Research Conducted by the Russian Research Center (I.V. Kurchatov Institute) and the Russian Academy of Sciences and Proposed Agreements |
|
|
|
|
03/21/2002 |
SECY-02-0021 |
Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 |
|
|
|
|
03/20/2002 |
|
03/20/2002 Commission Meeting: Affirmation Session |
|
|
|
|
03/18/2002 |
SECY-02-0042 |
Weekly Information Report - Week Ending March 8, 2002 |
|
|
|
|
03/15/2002 |
SECY-02-0033 |
Amergen's Request to Consolidate the Clinton Power Station Emergency Operations Facility (EOF) into the Centralized EOF Operated by Exelon Generation Co. |
|
|
|
|
03/12/2002 |
SECY-02-0009 |
Denial of Petition for Rulemaking (PRM-60-2/60-2a) - the States of Nevada and Minnesota |
|
|
|
|
03/11/2002 |
SECY-02-0039 |
Weekly Information Report - Week Ending March 1, 2002 |
|
|
|
|
03/07/2002 |
|
03/07/2002 Commission Meeting: Affirmation Session |
|
|
|
|
03/07/2002 |
CLI-02-08 |
Private Fuel Storage - Commission Memorandum and Order granting review of LBP-02-08. The Order also establishes a briefing schedule for the parties and stays all proceedings concerning environmental justice issues. |
|
|
|
|
03/07/2002 |
CLI-02-07 |
Duke, Cogema, Stone & Webster -- Commission Memorandum and Order granting the Petition for Interlocutory Review filed by intervenor Georgians Against Nuclear Energy (GANE). GANE sought interlocutory review of the decision of the Licensing Board dated December 20, 2001, that denied a motion by GANE to dismiss the proceeding or hold it in abeyance. The Commission upheld the decision of the Licensing Board. It further denied as moot GANE's motion to stay the proceedings during Commission review. |
|
|
|
|
03/06/2002 |
|
03/04/2002 Commission Meeting: Briefing on Status of Nuclear Waste Safety |
|
|
|
|
03/05/2002 |
SECY-02-0034 |
Weekly Information Report - Week Ending February 22, 2002 |
|
|
|
|
03/05/2002 |
SECY-02-0030 |
Summary Report on NRC's Historical Efforts to Develop and Use Performance Indicators |
|
|
|
|
03/05/2002 |
|
03/01/2002 Commission Meeting: Briefing on Status of OCFO Programs, Performance and Plans |
|
|
|
|
02/26/2002 |
SECY-02-0031 |
Weekly Information Report - Week Ending February 15, 2002 |
|
|
|
|
02/26/2002 |
SECY-02-0025 |
Submission of the Annual Freedom of Information Act Report |
|
|
|
|
02/21/2002 |
SECY-02-0002 |
Revision of Gaseous Diffusion Plant Recertification Standard Review Plan Chapter on Foreign Ownership and Financial Requirements |
|
|
|
|
02/21/2002 |
|
02/19/2002 Commission Meeting with the Advisory Committee on The Medical Uses of Isotopes |
|
|
|
|
02/14/2002 |
SECY-02-0019 |
Annual Report on Court Litigation (Calendar Year 2001) |
|
|
|
|
02/13/2002 |
SECY-02-0028 |
Weekly Information Report - Week Ending February 8, 2002 |
|
|
|
|
02/08/2002 |
SECY-02-0026 |
Weekly Information Report - Week Ending February 1, 2002 |
|
|
|
|
02/07/2002 |
|
02/06/2002 Commission Meeting: Briefing on Equal Employment Opportunity Program |
|
|
|
|
02/06/2002 |
|
02/06/2002 Commission Meeting: Affirmation Session |
|
|
|
|
02/06/2002 |
CLI-02-06 |
McGuire and Catawba - Commission Memorandum and Order accepting for review an issue on terrorism certified to the Commission by the ASLB for this proceeding in LBP-02-04. The Commission's Order also establishes a briefing schedule. |
|
|
|
|
02/06/2002 |
CLI-02-05 |
Millstone - Commission Memorandum and Order accepting a referral from the ASLB for this proceeding of its ruling in LBP-02-05 with respect to issues on terrorism. The Commission's Order further establishes a briefing schedule. |
|
|
|
|
02/06/2002 |
CLI-02-04 |
Duke, Cogema, Stone & Webster - Commission Memorandum and Order accepting the applicant's petition for interlocutory review of the decision in LBP-01-35. The Commission's review will be limited to the ruling by the ASLB on petitioner GANE's contention related to the terrorist events of September 11, 2001. A briefing schedule of the issues is also established by this Order |
|
|
|
|
02/06/2002 |
CLI-02-03 |
Private Fuel Storage - Commission Memorandum and Order accepting for review matters addressed in LBP-01-37, referred to the Commission by that decision. This Order also establishes a briefing schedule for the issues the parties are to address. |
|
|
|
|
02/05/2002 |
SECY-02-0022 |
Weekly Information Report - Week Ending January 25, 2002 |
|
|
|
|
02/04/2002 |
|
01/30/2002 Commission Meeting: Briefing on Status of OCIO Programs, Performance and Plans |
|
|
|
|
01/31/2002 |
SECY-02-0011 |
Equal Employment Opportunity (EEO) Briefing |
|
|
|
|
01/31/2002 |
SECY-02-0008 |
Status Report on Developing a Memorandum of Understanding with the U.S. Department of Energy for a Decision Process Regarding Potential Site Transfers under Section 151(b) of the Nuclear Waste Policy Act |
|
|
|
|
01/31/2002 |
|
01/30/2002 Commission Meeting: Affirmation Session |
|
|
|
|
01/31/2002 |
|
01/29/2002 Commission Meeting: Briefing on Status of Nuclear Reactor Safety |
|
|
|
|
01/30/2002 |
CLI-02-02 |
Duke, Cogema, Stone & Webster -- Commission Memorandum and Order denying the motion of the Georgians Against Nuclear Energy for reconsideration of the Commission's decision in CLI-01-28. |
|
|
|
|
01/30/2002 |
CLI-02-01 |
Millstone -- Commission Memorandum and Order denying the petition of the Connecticut Coalition Against Millstone and the STAR Foundation for reconsideration of the Commission's decision in CLI-01-24. |
|
|
|
|
01/30/2002 |
COMNJD-02-0001 |
Assessment of Impact of NRC's Activities on Licensees' Operations |
|
|
|
|
01/29/2002 |
SECY-02-0015 |
Weekly Information Report - Week Ending January 18, 2002 |
|
|
|
|
01/24/2002 |
SECY-02-0012 |
Weekly Information Report - Week Ending January 11, 2002 |
|
|
|
|
01/23/2002 |
SECY-02-0003 |
Annual Report on Commission Adjudication |
|
|
|
|
01/22/2002 |
|
01/15/2002 Commission Meeting: Briefing on Status of Nuclear Materials Safety |
|
|
|
|
01/17/2002 |
|
01/17/2002 - "Nuclear Security in the Post-September 11 Environment," presented by Chairman Richard Meserve at the National Press Club |
|
|
|
|
01/10/2002 |
SECY-02-0004 |
Weekly Information Report - Week Ending January 4, 2002 |
|
|
|
|
01/04/2002 |
SECY-02-0001 |
Weekly Information Report - Week Ending December 28, 2001 |
|
|
|
|