Release Date |
SECY
Number |
Description |
SECY Paper |
SRM |
CVR |
Trans-
cript |
12/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Jerry Lewis concerning the NRC's high-level waste program execution during the period of the Continuing Resolution |
|
|
|
|
12/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman John M. Spratt, Jr., concerning the NRC's high-level waste program execution during the period of the Continuing Resolution |
|
|
|
|
12/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Steven Chu, Secretary of Energy forwarding a letter on the Loan Guarantee Program for nuclear plants |
|
|
|
|
12/29/2010 |
|
01/11/10 Discussion of Management Issues (Closed – Ex. 2) - Full Written Explanation |
|
|
|
|
12/29/2010 |
SECY-10-0161 |
Final Rule: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements (10 CFR 50.46a) (RIN 3150‑AH29) |
|
|
|
|
12/28/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Jerry F. Costello regarding safety concerns at the Honeywell facility in Metropolis, Illinois |
|
|
|
|
12/27/2010 |
SECY-10-0140 |
Chairman Jaczko's vote on SECY-10-0140 – Options for Revising the Construction Reactor Oversight Process Assessment Program |
|
|
|
|
12/27/2010 |
SECY-10-0113 |
Closure Options for Generic Safety Isssue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance |
|
|
|
|
12/27/2010 |
SECY-10-0163 |
Weekly Information Report - Week Ending December 17, 2010 |
|
|
|
|
12/23/2010 |
SECY-10-0113 |
Staff Requirements – Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance |
|
|
|
|
12/23/2010 |
SECY-10-0159 |
U.S. Nuclear Regulatory Commission Implementation Plan for the Radiation Source Protection and Security Task Force Report |
|
|
|
|
12/21/2010 |
|
Staff Requirements Memorandum: 12/16/10 Briefing on Construction Reactor Oversight Program (cROP) |
|
|
|
|
12/21/2010 |
|
12/16/10 Commission Meeting - Briefing on Construction Reactor Oversight Program (cROP) |
|
|
|
|
12/17/2010 |
SECY-10-0162 |
Weekly Information Report - Week Ending December 10, 2010 |
|
|
|
|
12/16/2010 |
COMWCO-10-0001 |
Staff Requirements – Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/16/2010 |
SECY-10-0153 |
Cyber Security – Implementation of the Commission's Determination of Systems and Equipment Within the Scope of Title 10 of the Code of Federal Regulations, Section 73.54 |
|
|
|
|
12/16/2010 |
COMWCO-10-0001 |
Chairman Jaczko' Vote on COMWCO-10-0001 – Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/15/2010 |
SECY-10-0142 |
Proposed Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN-3150-AI84) |
|
|
|
|
12/15/2010 |
SECY-10-0142 |
Staff Requirements – Proposed Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN 3150-AI84) |
|
|
|
|
12/15/2010 |
COMWCO-10-0001 |
Commissioner Apostolakis' Vote on COMWCO-10-0001 – Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/15/2010 |
COMWCO-10-0001 |
Commissioner Svinicki's Vote on COMWCO-10-0001 – Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/14/2010 |
COMWCO-10-0001 |
Commissioner Magwood's Vote on COMWCO-10-0001 – Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/13/2010 |
COMWCO-10-0001 |
Regulation of Cyber Security at Nuclear Power Plants |
|
|
|
|
12/13/2010 |
SECY-10-0144 |
Recent Staff Outreach Regarding Specific License Requirement for Exports to Embargoed Destinations |
|
|
|
|
12/10/2010 |
SECY-10-0160 |
Weekly Information Report - Week Ending December 3, 2010 |
|
|
|
|
12/09/2010 |
|
12/16/10 Meeting Slides: Briefing on Construction Reactor Oversight Program (cROP) |
|
|
|
|
12/09/2010 |
|
12/16/10 Meeting Agenda: Briefing on Construction Reactor Oversight Program (cROP) |
|
|
|
|
12/08/2010 |
|
11/30/10 Letter from Chairman Gregory B. Jaczko to Congress submitting the NRC's semiannual report on the status of its licensing and other regulatory activities |
|
|
|
|
12/03/2010 |
SECY-10-0157 |
Weekly Information Report - Week Ending November 26, 2010 |
|
|
|
|
12/03/2010 |
SECY-10-0105 |
Final Rule: Limiting the Quantity of Byproduct Material in a Generally Licensed Device (RIN 3150-AI33) |
|
|
|
|
12/02/2010 |
SECY-10-0105 |
Staff Requirements – Final Rule: Limiting the Quantity of Byproduct Material in a Generally Licensed Device (RIN 3150-AI33) |
|
|
|
|
12/01/2010 |
SECY-09-0042 |
Revised 11/30/10 Commission Meeting - Affirmation Session |
|
|
|
|
12/01/2010 |
SECY-10-0128 |
Staff Requirements – Proposed Rule: Domestic Licensing of Source Material – Amendments/Integrated Safety Analysis (RIN 3150-AI50) |
|
|
|
|
12/01/2010 |
SECY-10-0154 |
Weekly Information Report - Week Ending November 19, 2010 |
|
|
|
|
12/01/2010 |
SECY-10-0150 |
Closing Fire Protection Issies — Semiannual Update — November 2010 |
|
|
|
|
11/30/2010 |
SECY-10-0149 |
Status of the Decommissioning Program — 2010 Annual Report |
|
|
|
|
11/30/2010 |
SECY-10-0148 |
Path Forward for Addressing the Variances Between Title 10 of the Code of Federal Regulations Section 73.21, Safeguards Information Protection Requirements and Nuclear Regulatory Commission Security Orders |
|
|
|
|
11/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey providing an initial response to a request for information to assist in the investigation of medical event reporting and notification |
|
|
|
|
11/30/2010 |
SECY-09-0042 |
11/30/10 Commission Meeting - Affirmation Session |
|
|
|
|
11/30/2010 |
CLI-10-30 |
Entergy Nuclear Operations, Inc. |
|
|
|
|
11/30/2010 |
CLI-10-29 |
Tennessee Valley Authority |
|
|
|
|
11/30/2010 |
|
12/21/10 Briefing on Security Issues (Closed – Ex. 1) - Full Written Explanation |
|
|
|
|
11/29/2010 |
SECY-10-0142 |
Chairman Jaczko's vote on SECY-10-0142 – Proposed Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN-3150-AI84) |
|
|
|
|
11/26/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Jim Matheson regarding the blending of low-level radioactive waste (LLW) |
|
|
|
|
11/24/2010 |
SECY-10-0137 |
Chairman Jaczko's vote on SECY-10-0137 – Proposed Rule: Requirement for Access Authorization and Physical Protection During Nuclear Power Plant Construction (RIN 3150-AI65) |
|
|
|
|
11/23/2010 |
SECY-10-0113 |
Chairman Jaczko's vote on SECY-10-0113 – Closure Options for Generic Safety Isssue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance |
|
|
|
|
11/23/2010 |
SECY-10-0106 |
Chairman Jaczko's vote on SECY-10-0106 – Proposed Rule – 10 CFR Parts 2, 51, and 54 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN-3150- AI43) |
|
|
|
|
11/22/2010 |
|
Letter from Chairman Gregory B. Jaczko to The President, Congress, and U.S. Government Accountability Office (GAO) providing the NRC's Fiscal Year 2010 Performance and Accountability Report |
|
|
|
|
11/19/2010 |
SECY-10-0151 |
Weekly Information Report - Week Ending November 12, 2010 |
|
|
|
|
11/19/2010 |
|
11/12/10 Letter from Chairman Gregory B. Jaczko to Senator Sherrod Brown regarding maintaining appropriate security requirements at the United States Enrichment Corporation/Department of Energy site in Portsmouth, Ohio |
|
|
|
|
11/18/2010 |
SECY-10-0114 |
Staff Requirements – Recommendation to Extend the Proposed Rulemaking on Security Requirements for Facilities Storing Spent Nuclear Fuel and High-Level Radioactive Waste |
|
|
|
|
11/17/2010 |
|
Staff Requirements Memorandum: 11/5/10 Meeting with the Advisory Committee on Reactors Safeguards and Briefing on Design Acceptance Criteria |
|
|
|
|
11/15/2010 |
SECY-10-0147 |
Weekly Information Report - Week Ending November 5, 2010 |
|
|
|
|
11/15/2010 |
SECY-10-0143 |
Annual Update of the Risk-Informed and Performance-Based Plan |
|
|
|
|
11/15/2010 |
SECY-10-0142 |
Proposed Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN 3150‑AI84) |
|
|
|
|
11/12/2010 |
SECY-10-0140 |
Options for Revising the Construction Reactor Oversight Process Assessment Program |
|
|
|
|
11/12/2010 |
SECY-10-0139 |
Annual Update on the Status of Emergency Preparedness Activities |
|
|
|
|
11/10/2010 |
SECY-10-0117 |
Chairman Jaczko's vote on SECY-10-0117 – Proposed Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-A77) |
|
|
|
|
11/09/2010 |
SECY-10-0145 |
Weekly Information Report - Week Ending October 29, 2010 |
|
|
|
|
11/09/2010 |
|
11/05/10 Commission Meeting - Meeting with the ACRS and Briefing on Design Acceptance Criteria |
|
|
|
|
11/08/2010 |
|
Staff Requirements Memorandum: 11/02/10 Briefing on Equal Employment Opportunity (EEO) and Small Business Programs |
|
|
|
|
11/08/2010 |
SECY-10-0137 |
Proposed Rule: Requirements for Access Authorization and Physical Protection During Nuclear Power Plant Construction (RIN 3150-AI65) |
|
|
|
|
11/05/2010 |
|
Staff Requirements Memorandum: 11/05/10 Affirmation Session |
|
|
|
|
11/05/2010 |
|
11/05/10 Commission Meeting - Affirmation Session |
|
|
|
|
11/05/2010 |
CLI-10-28 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
|
|
|
|
11/04/2010 |
|
11/02/10 Commission Meeting: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs |
|
|
|
|
11/03/2010 |
SECY-10-0128 |
Chairman Jaczko's vote on SECY-10-0128 – Proposed Rule: Domestic Licensing of Source Material – Amendments/Integrated Safety Analysis (RIN-3150-AI50) |
|
|
|
|
11/03/2010 |
SECY-10-0121 |
Chairman Jaczko's vote on SECY-10-0121 – Modifying the Risk-Informed Regulatory Guidance for New Reactors |
|
|
|
|
11/02/2010 |
|
10/26/10 Letter from Chairman Gregory B. Jaczko to Congress and Gene L. Dodaro, U.S. Government Accountability Office (GAO), providing NRC's views of the GAO report "2010 Resubmission of the U.S.-Russia Nuclear Cooperation Agreement: Further Actions Needed by State and Other Agencies to Improve the Review of the Classified Nuclear Proliferation Assessment" (GAO-10-1039R) |
|
|
|
|
11/01/2010 |
SECY-10-0141 |
Weekly Information Report - Week Ending October 22, 2010 |
|
|
|
|
11/01/2010 |
|
11/05/10 Meeting Agenda: Meeting with the Advisory Committee on Reactor Safeguards and Briefing on Design Acceptance Criteria |
|
|
|
|
11/01/2010 |
|
11/05/10 Meeting Slides: Meeting with the Advisory Committee on Reactor Safeguards and Briefing on Design Acceptance Criteria |
|
|
|
|
10/29/2010 |
|
12/21/10 Briefing on Threat Environment Assessment (Closed – Ex. 1) - Full Written Explanation |
|
|
|
|
10/28/2010 |
|
Staff Requirements Memorandum: 10/20/10 Briefing on Medical Issues |
|
|
|
|
10/28/2010 |
|
10/20/10 Commission Meeting: Briefing on Medical Issues |
|
|
|
|
10/28/2010 |
|
10/27/10 Letter from Chairman Gregory B. Jaczko to Congress concerning reports regarding the NRC's review of the Department of Energy's license application seeking to construct a geologic repository at Yucca Mountain, Nevada |
|
|
|
|
10/27/2010 |
|
11/02/10 Meeting Slides: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs |
|
|
|
|
10/27/2010 |
|
11/02/10 Meeting Agenda: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs |
|
|
|
|
10/26/2010 |
|
Staff Requirements Memorandum: 10/18/10 NRC All Employees Meeting |
|
|
|
|
10/26/2010 |
SECY-10-0084 |
Explanation of Changes to Revision 2 to Regulatory Guide 1.159, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors" |
|
|
|
|
10/26/2010 |
|
11/30/10 Briefing on Security Issues (Closed – Ex. 1) - Full Written Explanation |
|
|
|
|
10/25/2010 |
SECY-10-0084 |
Staff Requirements – Explanation of Changes to Revision 2 to Regulatory Guide 1.159, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors" |
|
|
|
|
10/21/2010 |
SECY-10-0136 |
Weekly Information Report - Week Ending October 15, 2010 |
|
|
|
|
10/20/2010 |
SECY-10-0085 |
Staff Requirements – Proposed Rule: Enhanced Weapons, Firearms Background Checks and Security Event Notifications (RIN: 3150-AI49) |
|
|
|
|
10/20/2010 |
|
10/18/10 Commission Meeting: NRC All Employees Meeting |
|
|
|
|
10/19/2010 |
SECY-10-0134 |
Weekly Information Report - Week Ending October 8, 2010 |
|
|
|
|
10/19/2010 |
SECY-10-0128 |
Proposed Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) |
|
|
|
|
10/19/2010 |
|
Staff Requirements Memorandum: 10/14/10 Briefing on Alternative Risk Metrics for New Light Water Reactors |
|
|
|
|
10/19/2010 |
|
10/14/10 Commission Meeting: Briefing on Alternative Risk Metrics for New Light Water Reactors |
|
|
|
|
10/15/2010 |
SECY-10-0112 |
Staff Requirements – Report Regarding Encouraging States and Licensees to Complete National Source Tracking System Credentialing and to Use the System Electronically |
|
|
|
|
10/15/2010 |
SECY-10-0126 |
Annual Review of the Lessons-Learned Program |
|
|
|
|
10/15/2010 |
SECY-10-0125 |
Status of the Accident Sequence Precursor Program and the Standardized Plant Analysis Risk Models |
|
|
|
|
10/14/2010 |
SECY-10-0056 |
Final Rule: 10 CFR Part 72 License and Certificate of Compliance Terms (RIN 3150-AI09) |
|
|
|
|
10/14/2010 |
COMWCO-10-0002 |
Closeout Memo to Commissioner Ostendorff – Commission Direction on Staff Budget Guidance Under Fiscal Year (FY) 2011 Continuing Resolution |
|
|
|
|
10/14/2010 |
COMWCO-10-0002 |
Commissioner Svinicki's Vote on COMWCO-10-002 – Commission Direction on Staff Budget Guidance Under Fiscal Year (FY) 2011 Continuing Resolution |
|
|
|
|
10/14/2010 |
COMWCO-10-0002 |
Commission Direction on Staff Budget Guidance Under Fiscal Year (FY) 2011 Continuing Resolution; Plus Commissioner Ostendorff's Additional Memorandum |
|
|
|
|
10/14/2010 |
|
10/20/10 Meeting Agenda: Briefing on Medical Issues |
|
|
|
|
10/14/2010 |
|
10/20/10 Meeting Slides: Briefing on Medical Issues |
|
|
|
|
10/14/2010 |
SECY-10-0043 |
Staff Requirements – Blending of Low-Level Radioactive Waste |
|
|
|
|
10/14/2010 |
SECY-10-0056 |
10/14/10 Commission Meeting - Affirmation Session |
|
|
|
|
10/12/2010 |
COMSECY-10-0010 |
Request to Solicit for the Appointment of Two New Members on The Advisory Committee on Reactor Safeguards (ACRS)
|
|
|
|
|
10/12/2010 |
|
10/4/10 Letter from Chairman Gregory B. Jaczko to Paul R. Verkuil, Chairman, Administrative Conference of the United States, regarding the initial meeting of the Council of Independent Regulatory Agencies hosted by the Administrative Conference |
|
|
|
|
10/12/2010 |
|
10/4/10 Letter from Chairman Gregory B. Jaczko to Senator Kristen E. Gillibrand regarding the Senator's request that an additional public meeting be held in Westchester County, New York, on the proposed changes to NRC/FEMA emergency preparedness guidance document NUREG-0654/FEMA-REP-1, Supplement 3 |
|
|
|
|
10/08/2010 |
SECY-10-0131 |
Weekly Information Report - Week Ending October 1, 2010 |
|
|
|
|
10/07/2010 |
SECY-09-0095 |
Staff Requirements – Proposed Rule: Advance Notification to Native American Tribes of Transport of Certain Types of Nuclear Waste (RIN 3150-AG41) |
|
|
|
|
10/07/2010 |
|
10/14/10 Meeting Slides: Briefing on Alternative Risk Metrics for New Light Water Reactors |
|
|
|
|
10/07/2010 |
|
10/14/10 Meeting Agenda: Briefing on Alternative Risk Metrics for New Light Water Reactors |
|
|
|
|
10/06/2010 |
SECY-10-0130 |
Weekly Information Report - Week Ending September 24, 2010 |
|
|
|
|
10/06/2010 |
SECY-10-0105 |
Chairman Jaczko's vote on SECY-10-0105 – Final Rule: Limiting the Quantity of Byproduct Material in a Generally Licensed Device (RIN 3150-AI33) |
|
|
|
|
10/06/2010 |
|
09/29/10 Commission Meeting: Briefing on Resolution of Generic Safety Issue (GSI) – 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
10/05/2010 |
|
09/29/10 Staff Requirements Memorandum: Briefing on Resolution of Generic Safety Issue (GSI) – 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
10/04/2010 |
SECY-10-0114 |
Chairman Jaczko's vote on SECY-10-0114 – Recommendation to Extend the Proposed Rulemaking on Security Requirements for Facilities Storing Spent Nuclear Fuel and High-Level Radioactive Waste |
|
|
|
|
10/04/2010 |
SECY-10-0112 |
Chairman Jaczko's vote on SECY-10-0112 – Report Regarding Encouraging States and Licensees to Complete National Source Tracking System Credentialing and to Use The System Electronically |
|
|
|
|
10/01/2010 |
SECY-10-0084 |
Chairman Jaczko's vote on SECY-10-0084 – Explanation of Changes to Revision 2 to Regulatory Guide 1.159, "Assuring The Availability of Funds for Decommissioning Nuclear Reactors" |
|
|
|
|
09/30/2010 |
|
09/30/10 Commission Meeting - Affirmation Session |
|
|
|
|
09/30/2010 |
CLI-10-27 |
Northern States Power Co. |
|
|
|
|
09/29/2010 |
CLI-10-26 |
Tennessee Valley Authority |
|
|
|
|
09/29/2010 |
CLI-10-25 |
Luminant Generation Company LLC |
|
|
|
|
09/29/2010 |
CLI-10-24 |
South Texas Project Nuclear Operating Company |
|
|
|
|
09/29/2010 |
|
09/29/10 Commission Meeting - Affirmation Session |
|
|
|
|
09/27/2010 |
SECY-10-0123 |
Weekly Information Report - Week Ending September 17, 2010 |
|
|
|
|
09/23/2010 |
|
09/29/10 Meeting Agenda: Briefing on Resolution of Generic Safety Issue (GSI) – 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
09/23/2010 |
|
09/29/10 Meeting Slides: Briefing on Resolution of Generic Safety Issue (GSI) – 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
09/22/2010 |
SECY-10-0122 |
Weekly Information Report - Week Ending September 10, 2010 |
|
|
|
|
09/21/2010 |
|
09/14/10 Letter from Chairman Gregory B. Jaczko to Congress, providing the Joint Report on the NRC and the DOE/NNSA Activities in Protecting Radioactive Sources |
|
|
|
|
09/20/2010 |
SECY-10-0121 |
Modifying the Risk-Informed Regulatory Guidance for New Reactors |
|
|
|
|
09/15/2010 |
SECY-09-0090 |
Final Update of the Commission's Waste Confidence Decision |
|
|
|
|
09/15/2010 |
SECY-09-0090 |
09/15/10 Commission Meeting - Affirmation Session |
|
|
|
|
09/15/2010 |
SECY-10-0117 |
Proposed Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150 AI77) |
|
|
|
|
09/14/2010 |
SECY-10-0116 |
Periodic Assessment of the Activities of the Committee to Review Generic Requirements from June 1, 2009, through May 31, 2010 |
|
|
|
|
09/13/2010 |
SECY-10-0114 |
Recommendation to Extend the Proposed Rulemaking on Security Requirements for Facilities Storing Spent Nuclear Fuel and High-Level Radioactive Waste |
|
|
|
|
09/13/2010 |
SECY-10-0112 |
Report Regarding Encouraging States and Licensees to Complete National Source Tracking System Credentialing and to Use The System Electronically |
|
|
|
|
09/13/2010 |
SECY-10-0120 |
Weekly Information Report - Week Ending September 3, 2010 |
|
|
|
|
09/09/2010 |
SECY-10-0095 |
Chairman Jaczko's vote on Proposed Rule: Advance Notification to Native American Tribes of Transport of Certain Types of Nuclear Waste (RIN 3150-AG41) |
|
|
|
|
09/08/2010 |
SECY-10-0078 |
Staff Requirements – Centralized Emergency Operations Facilities and Combined License Applications |
|
|
|
|
09/08/2010 |
SECY-10-0056 |
Chairman Jaczko's Vote on Final Rule: 10 CFR Part 72 License and Certificate of Compliance Terms (RIN 3150-AI09) |
|
|
|
|
09/07/2010 |
SECY-10-0118 |
Weekly Information Report - Week Ending August 27, 2010 |
|
|
|
|
09/03/2010 |
SECY-10-0074 |
Staff Requirements - David Geisen, NRC Staff Petition for Review of LBP-09-24 (Aug. 28, 2009) |
|
|
|
|
09/02/2010 |
|
08/26/10 Letter from Chairman Gregory B. Jaczko to Congresswoman Lois Capps and Congressman Bob Filner regarding efforts underway in California to analyze the most recent data regarding seismic issues at the Diablo Canyon Nuclear Power Plant |
|
|
|
|
09/02/2010 |
|
08/26/10 Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding the discovery of tritium in groundwater monitoring wells at Pilgrim nuclear power plant and buried piping systems at all such facilities |
|
|
|
|
09/01/2010 |
SECY-09-0123 |
Staff Requirements - Material Categorization and Future Fuel Cycle Facility Security-Related Rulemaking |
|
|
|
|
09/01/2010 |
SECY-09-0123 |
Chairman Jaczko's vote on: Material Categorization and Future Fuel Cycle Facility Security-Related Rulemaking |
|
|
|
|
09/01/2010 |
SECY-09-0123 |
Commissioner Magwood's vote on: Material Categorization and Future Fuel Cycle Facility Security-Related Rulemaking |
|
|
|
|
09/01/2010 |
SECY-10-0043 |
Chairman Jaczko's vote on: Blending of Low-Level Radioactive Waste |
|
|
|
|
09/01/2010 |
COMGEA-10-0001/
COMGBJ-10-0004 |
Use of Risk Insights to Enhance Safety Focus of Small Modular Reactor Reviews |
|
|
|
|
09/01/2010 |
SECY-10-0113 |
Closure Options for Generic Safety Issue – 191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance |
|
|
|
|
09/01/2010 |
|
08/25/10 Letter from Chairman Gregory B. Jaczko to Congress responding to a request that the NRC conduct a nuclear nonproliferation assessment as part of the review of license applications for new nuclear technologies |
|
|
|
|
08/27/2010 |
SECY-09-0190 |
Staff Requirements – Major Revision to NRC Enforcement Policy |
|
|
|
|
08/27/2010 |
SECY-10-0085 |
Chairman Jaczko's vote on: Proposed Rule: Enhanced Weapons, Firearms Background Checks and Security Event Notifications (RIN: 3150-AI49) |
|
|
|
|
08/27/2010 |
SECY-10-0110 |
Weekly Information Report - Week Ending August 20, 2010 |
|
|
|
|
08/27/2010 |
SECY-10-0106 |
Proposed Rule—10 CFR Parts 2, 51, AND 54 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) |
|
|
|
|
08/27/2010 |
SECY-10-0105 |
Final Rule: Limiting the Quantity of Byproduct Material in a Generally Licensed Device (RIN 3150-AI33) |
|
|
|
|
08/27/2010 |
CLI-10-23 |
David Geisen |
|
|
|
|
08/27/2010 |
CLI-10-22 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
|
|
|
|
08/27/2010 |
CLI-10-21 |
South Carolina Electric and Gas Co. and South Carolina Public Service Authority (Also Referred to as Santee Cooper) |
|
|
|
|
08/27/2010 |
|
08/27/10 Commission Meeting - Affirmation Session |
|
|
|
|
08/25/2010 |
|
10/26/10 Briefing on Security Issues (Closed – Ex. 1) - Full Written Explanation |
|
|
|
|
08/23/2010 |
SECY-10-0108 |
Weekly Information Report - Week Ending August 13, 2010 |
|
|
|
|
08/23/2010 |
|
Staff Requirements Memorandum: 08/12/10 Meeting with the Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
|
08/20/2010 |
SECY-10-0100 |
Staff Progress in Resolving Issues Associated with Inspections, Tests, Analyses, and Acceptance Criteria |
|
|
|
|
08/20/2010 |
SECY-10-0099 |
Proposed Revision to Memorandum of Understanding Between the Federal Emergency Management Agency and the Nuclear Regulatory Commission |
|
|
|
|
08/20/2010 |
SECY-10-0098 |
Summary of Activities Related to Generic Issues Program |
|
|
|
|
08/19/2010 |
|
08/12/10 Letter from Chairman Gregory B. Jaczko to Senator Thomas R. Carper providing a summary of NRC's actions to regularly update data on the Office of Management and Budget Information Technology (IT) Dashboard. |
|
|
|
|
08/18/2010 |
|
08/11/10 Letter from Chairman Gregory B. Jaczko to Congressman William D. Delahunt responding to a request for an update on the status of the Pilgrim Nuclear Power Plant license renewal application. |
|
|
|
|
08/18/2010 |
|
08/11/10 Letter from Chairman Gregory B. Jaczko to The President and Congress providing a report documenting the efforts of the Radiation Source Protection and Security Task Force. |
|
|
|
|
08/18/2010 |
|
08/11/10 Letter from Chairman Gregory B. Jaczko to Paul R. Verkuil, Chairman, Administrative Conference of the United States (ACUS), responding to an invitation for the NRC to join the Council of Independent Regulatory Agencies. |
|
|
|
|
08/17/2010 |
SECY-10-0104 |
Weekly Information Report - Week Ending August 6, 2010 |
|
|
|
|
08/16/2010 |
|
08/12/10 Commission Meeting: Meeting with the Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
|
08/12/2010 |
|
08/12/10 Commission Meeting - Affirmation Session |
|
|
|
|
08/12/2010 |
CLI-10-20 |
U.S. Army Installation Command |
|
|
|
|
08/11/2010 |
SECY-10-0062 |
Staff Requirements - Reproposed Rule: Medical Use of Byproduct Material - Amendments/Medical Event Definitions (RIN 3150- AI26) |
|
|
|
|
08/09/2010 |
SECY-10-0101 |
Weekly Information Report - Week Ending July 30, 2010 |
|
|
|
|
08/06/2010 |
SECY-10-0031 |
Staff Requirements - Revising the Fuel Cycle Oversight Process |
|
|
|
|
08/06/2010 |
|
07/30/10 Letter from Chairman Gregory B. Jaczko to Congress and the Government Accountability Office (GAO) describing actions the NRC plans in response to recommendations identified in GAO-10-489, "Convention on Nuclear Safety is Viewed by Most Member Countries as Strengthening Safety Worldwide." |
|
|
|
|
08/06/2010 |
SECY-10-0095 |
Proposed Rule: Advance Notification to Native American Tribes of Transport of Certain Types of Nuclear Waste (RIN 3150-AG41) |
|
|
|
|
08/03/2010 |
|
08/12/10 Meeting Agenda: Meeting with the Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
|
08/02/2010 |
SECY-10-0097 |
Weekly Information Report - Week Ending July 23, 2010 |
|
|
|
|
07/28/2010 |
|
07/21/10 Letter from Chairman Gregory B. Jaczko to Senator John F. Kerry regarding the status of the Pilgrim Nuclear Power Plant license renewal application. |
|
|
|
|
07/26/2010 |
|
07/19/10 Letter from Chairman Gregory B. Jaczko to Senator Robert Menendez regarding protection of New Jersey water resources from tritium contamination at the Oyster Creek nuclear power plant. |
|
|
|
|
07/23/2010 |
SECY-10-0093 |
Weekly Information Report - Week Ending July 16, 2010 |
|
|
|
|
07/22/2010 |
SECY-09-0162 |
Staff Requirements - Proposed Rule: 10 CFR 73.37, Physical Protection of Irradiated Fuel in Transit (RIN 3150-AI64) |
|
|
|
|
07/21/2010 |
|
Staff Requirements Memorandum: 07/08/10 Briefing on Proposed Rule on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
|
|
|
07/19/2010 |
SECY-10-0024 |
Report to Congress on Abnormal Occurrences Fiscal Year 2009 |
|
|
|
|
07/19/2010 |
|
07/12/10 Letter from Chairman Gregory B. Jaczko to Congress forwarding the "Report to Congress on Abnormal Occurrences: Fiscal Year [FY] 2009" (NUREG-0090, Vol. 32) |
|
|
|
|
07/15/2010 |
SECY-10-0091 |
Weekly Information Report - Week Ending July 9, 2010 |
|
|
|
|
07/15/2010 |
SECY-10-0085 |
Proposed Rule: "Enhanced Weapons, Firearms Background Checks and Security Event Notifications" (RIN: 3150-AI49) |
|
|
|
|
07/14/2010 |
|
07/07/10 Letter from Chairman Gregory B. Jaczko to Robert A. Petzel, M.D., Under Secretary for Health, Department of Veterans Affairs, regarding continued interactions with the VHA concerning the safe use of radioactive materials |
|
|
|
|
07/13/2010 |
SECY-10-0084 |
Explanation of Changes to Revision 2 to Regulatory Guide 1.159, "Assuring The Availability of Funds for Decommissioning Nuclear Reactors" |
|
|
|
|
07/13/2010 |
SECY-10-0089 |
Weekly Information Report - Week Ending July 2, 2010 |
|
|
|
|
07/12/2010 |
|
07/08/10 Commission Meeting: Briefing on Proposed Rule on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
|
|
|
07/09/2010 |
SECY-10-0031 |
Chairman Jaczko's vote on: Revising the Fuel Cycle Oversight Process |
|
|
|
|
07/08/2010 |
CLI-10-19 |
Entergy Nuclear Operations, Inc. |
|
|
|
|
07/08/2010 |
CLI-10-18 |
Pa'ina Hawaii, LLC |
|
|
|
|
07/08/2010 |
CLI-10-17 |
Entergy Nuclear Vermont Yankee, L.L.C. and Entergy Nuclear Operations, Inc. |
|
|
|
|
07/08/2010 |
|
07/08/10 Commission Meeting - Affirmation Session |
|
|
|
|
07/08/2010 |
|
6/30/10 Letter from Chairman Gregory B. Jaczko to Congress submitting NRC's 2009 "Report to Congress on the Security Inspection Program for Commercial Power Reactor and Category I Fuel Cycle Facilities: Results and Status Update" |
|
|
|
|
07/06/2010 |
SECY-09-0140 |
Staff Requirements - Rulemaking Related to Decoupling an Assumed Loss of Offsite Power from a Loss-of-Coolant Accident, 10 CFR Part 50, Appendix A, General Design Criterion 35 (RIN 3150-AH43) |
|
|
|
|
07/06/2010 |
SECY-10-0078 |
Centralized Emergency Operations Facilities and Combined License Applications |
|
|
|
|
07/02/2010 |
SECY-10-0086 |
Weekly Information Report - Week Ending June 25, 2010 |
|
|
|
|
07/01/2010 |
|
07/08/10 Meeting Agenda: Briefing on Proposed Rule on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
|
|
|
07/01/2010 |
|
07/08/10 Meeting Slides: Briefing on Proposed Rule on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
|
|
|
07/01/2010 |
|
06/25/10 Commission Meeting: Briefing on Office of Nuclear Material Safety and Safeguards Programs, Performance and Future Plans and Integrated Strategy on Spent Fuel Management |
|
|
|
|
07/01/2010 |
|
Staff Requirements Memorandum: 06/17/10 Briefing on Blending |
|
|
|
|
06/30/2010 |
|
Staff Requirements Memorandum: 06/25/10 Briefing on Office of Nuclear Materials Safety and Safeguards (NMSS) – Programs, Performance and Future Plans and Integrated Strategy on Spent Fuel Management (COMSECY-10-0007) |
|
|
|
|
06/28/2010 |
|
Letter from Chairman Gregory B. Jaczko to The President regarding NRC's review of the proposed Agreement with Australia for Cooperation Concerning Peaceful Uses of Nuclear Energy |
|
|
|
|
06/28/2010 |
|
Letter from Chairman Gregory B. Jaczko to The President regarding NRC's review of the revised Nuclear Proliferation Assessments for the proposed Agreement with the Russian Federation for Cooperation in the Field of Peaceful Uses of Nuclear Energy |
|
|
|
|
06/25/2010 |
SECY-10-0083 |
Weekly Information Report - Week Ending June 18, 2010 |
|
|
|
|
06/25/2010 |
|
Staff Requirements Memorandum: 06/09/10 Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
|
06/23/2010 |
SECY-10-0045 |
Proposed Rule: Requirements for Fingerprint-Based Criminal History Records Checks for Individuals Seeking Unescorted Access to Research or Test Reactors (RIN 3150-AI25) |
|
|
|
|
06/23/2010 |
SECY-10-0018 |
Proposed Rulemaking to Revise the Definition of Construction in 10 CFR Parts 30, 36, 39, 40, 51, 70, and 150 |
|
|
|
|
06/22/2010 |
SECY-10-0077 |
Weekly Information Report - Week Ending June 11, 2010 |
|
|
|
|
06/22/2010 |
|
06/17/10 Commission Meeting: Briefing on Blending |
|
|
|
|
06/21/2010 |
|
06/25/10 Meeting Agenda: Briefing on Office of Nuclear Materials Safety and Safeguards (NMSS) – Programs, Performance and Future Plans and Integrated Strategy on Spent Fuel Management |
|
|
|
|
06/21/2010 |
|
06/25/10 Meeting Slides: Briefing on Office of Nuclear Materials Safety and Safeguards (NMSS) – Programs, Performance and Future Plans and Integrated Strategy on Spent Fuel Management |
|
|
|
|
06/19/2010 |
SECY-09-0179 |
Proposed Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
|
|
|
|
06/18/2010 |
COMSECY-10-0007 |
Project Plan for the Regulatory Program Review to Support Extended Storage and Transportation of Spent Nuclear Fuel |
|
|
|
|
06/18/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman David Price providing a status of NRC's efforts in the area of fire safety, licensee compliance, and implementation of any regulatory changes that might be planned. |
|
|
|
|
06/17/2010 |
SECY-10-0044 |
Review of Final Rule Package, "Export and Import of Nuclear Equipment and Material; Updates and Clarifications (10 CFR Part 110, RIN 3150-AI16) |
|
|
|
|
06/17/2010 |
SECY-10-0044 |
Review of Final Rule Package, "Export and Import of Nuclear Equipment and Material; Updates and Clarifications (10 CFR Part 110, RIN 3150-AI16) |
|
|
|
|
06/17/2010 |
CLI-10-16 |
South Texas Project Nuclear Operating Company |
|
|
|
|
06/17/2010 |
CLI-10-15 |
Entergy Nuclear Generation Company And Entergy Nuclear Operations, Inc. |
|
|
|
|
06/17/2010 |
CLI-10-14 |
Entergy Nuclear Generation Company And Entergy Nuclear Operations, Inc. |
|
|
|
|
06/17/2010 |
|
06/17/10 Commission Meeting - Affirmation Session |
|
|
|
|
06/16/2010 |
SECY-10-0072 |
Update on Agency Communication Initiatives |
|
|
|
|
06/15/2010 |
|
06/09/10 Commission Meeting: Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
|
06/14/2010 |
|
06/17/10 Meeting Agenda: Briefing on Blending |
|
|
|
|
06/14/2010 |
|
07/13/10 Briefing on the Radiation Source Protection and Security Task Force Report (Closed - Ex. 9) - Full Written Explanation |
|
|
|
|
06/14/2010 |
|
06/17/10 Meeting Slides: Briefing on Blending |
|
|
|
|
06/14/2010 |
SECY-10-0070 |
Status Report on Power Uprates |
|
|
|
|
06/11/2010 |
SECY-10-0075 |
Weekly Information Report - Week Ending June 4, 2010 |
|
|
|
|
06/10/2010 |
SECY-10-0044 |
06/09/10 Commission Meeting - Affirmation Session |
|
|
|
|
06/08/2010 |
|
Staff Requirements Memorandum: 05/27/10 Briefing on the Results of The Agency Action Review Meeting |
|
|
|
|
06/08/2010 |
SECY-10-0022 |
Staff Requirements - Proposed Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) |
|
|
|
|
06/07/2010 |
SECY-10-0073 |
Weekly Information Report - Week Ending May 28, 2010 |
|
|
|
|
06/04/2010 |
SECY-10-0066 |
International Radioactive Source Security Efforts |
|
|
|
|
06/03/2010 |
SECY-10-0062 |
Reproposed Rule: Medical Use of Byproduct Material – Amendments/Medical Event Definitions (RIN 3150- AI26) |
|
|
|
|
06/02/2010 |
SECY-09-0183 |
Proposed Rule: Proposed Modification for Including Quality Control and Quality Verification Personnel within the Scope of Subpart I of 10 CFR Part 26 |
|
|
|
|
06/01/2010 |
SECY-09-0183 |
Staff Requirements Memorandum: Proposed Modification for Including Quality Control and Quality Verification Personnel within the Scope of Subpart I of 10 CFR Part 26 |
|
|
|
|
06/01/2010 |
|
Staff Requirements Memorandum: 05/11/10 Briefing on Federal and State Materials and Environmental Management Programs (FSME) Programs, Performance, and Future Plans |
|
|
|
|
06/01/2010 |
|
05/27/10 Commission Meeting: Briefing on the Results of the Agency Action Review Meeting (AARM) |
|
|
|
|
05/28/2010 |
SECY-10-0067 |
Weekly Information Report - Week Ending May 21, 2010 |
|
|
|
|
05/28/2010 |
SECY-10-0060 |
Closing Fire Protection Issues—Semiannual Update |
|
|
|
|
05/28/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman David P. Roe regarding blending of low-level radioactive waste (LLRW) streams. |
|
|
|
|
05/26/2010 |
|
06/09/10 Meeting Agenda: Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
|
05/26/2010 |
|
06/09/10 Meeting Slides: Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
|
05/25/2010 |
COMSECY-09-0029 |
Draft Policy Statement on the Protection of Cesium-137 Chloride Sources |
|
|
|
|
05/24/2010 |
SECY-10-0064 |
Weekly Information Report - Week Ending May 14, 2010 |
|
|
|
|
05/24/2010 |
|
05/27/10 Meeting Agenda: Briefing on the Results of the Agency's Action Review Meeting (AARM) |
|
|
|
|
05/24/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress submitting the NRC's semiannual report on the status of its licensing and other regulatory activities |
|
|
|
|
05/21/2010 |
|
05/27/10 Meeting Slides: Briefing on the Results of the Agency Action Review Meeting (AARM) |
|
|
|
|
05/19/2010 |
SECY-10-0045 |
Chairman Jaczko's vote on Proposed Rule: Requirements for Fingerprint-Based Criminal History Records Checks for Individuals Seeking Unescorted Access to Research or Test Reactors |
|
|
|
|
05/18/2010 |
SECY-10-0056 |
Final Rule: 10 CFR Part 72 License and Certificate of Compliance Terms (RIN 3150-AI09) |
|
|
|
|
05/17/2010 |
SECY-09-0181 |
Proposed Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
|
|
|
|
05/17/2010 |
|
Staff Requirements Memorandum: 05/14/10 Briefing on Resolution of Generic Safety Issue (GSI) – 191, Assessment of Debris Accumulation on Pressurized Water (PWR) Sump Performance |
|
|
|
|
05/17/2010 |
SECY-10-0059 |
Weekly Information Report - Week Ending May 7, 2010 |
|
|
|
|
05/13/2010 |
SECY-09-0181 |
Staff Requirements Memorandum: Proposed Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
|
|
|
|
05/13/2010 |
|
05/11/10 Commission Meeting: Briefing on Federal and State Materials and Environmental Management Programs (FSME) Programs, Performance, and Future Plans |
|
|
|
|
05/12/2010 |
|
Staff Requirements Memorandum: 04/29/10 Briefing on the Fuel Cycle Oversight Process Revisions |
|
|
|
|
05/10/2010 |
|
Staff Requirements Memorandum: 05/04/10 Briefing on Human Capital and Equal Employment Opportunity |
|
|
|
|
05/07/2010 |
SECY-10-0058 |
Weekly Information Report - Week Ending April 30, 2010 |
|
|
|
|
05/06/2010 |
|
05/04/10 Commission Meeting: Briefing on Human Capital and Equal Employment Opportunity |
|
|
|
|
05/04/2010 |
|
05/11/10 Commission Agenda: Briefing on Federal and State Materials and Environmental Management Programs (FSME) Programs, Performance, and Future Plans |
|
|
|
|
05/04/2010 |
|
04/30/10 Discussion of Adjudicatory Issues (Closed—Ex. 10) - Full Written Explanation |
|
|
|
|
05/04/2010 |
|
05/11/10 Meeting Slides: Briefing on Federal and State Materials and Environmental Management Programs (FSME) Programs, Performance, and Future Plans |
|
|
|
|
05/04/2010 |
|
04/29/10 Commission Meeting: Briefing on the Fuel Cycle Oversight Process Revisions |
|
|
|
|
05/03/2010 |
COMSECY-10-0004 |
Delegation of Signature Authority for Section 274i Agreements |
|
|
|
|
05/03/2010 |
SECY-10-0055 |
Weekly Information Report - Week Ending April 23, 2010 |
|
|
|
|
05/03/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Patrick T. McHenry and Congressman Darrell E. Issa providing information on NRC's implementation of White House and Justice Department memoranda regarding openness and transparency through the Freedom of Information Act (FOIA) |
|
|
|
|
04/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Cass Sunstein, Administrator, Office of Information and Regulatory Affairs, Office of Management and Budget, enclosing the NRC's Fiscal Year-2010 Regulatory Plan |
|
|
|
|
04/30/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Arne Duncan, Secretary of Education, enclosing the NRC's Fiscal Year-2009 Annual Federal Performance Report on Executive Agency Actions to Assist Tribal Colleges and Universities (TCUs) |
|
|
|
|
04/27/2010 |
SECY-10-0045 |
Proposed Rule: Requirements for Fingerprint-Based Criminal History Records Checks for Individuals Seeking Unescorted Access to Research or Test Reactors (RIN 3150-A125) |
|
|
|
|
04/27/2010 |
|
05/04/10 Meeting Slides: Briefing on Human Capital and Equal Employment Opportunity |
|
|
|
|
04/27/2010 |
|
05/04/10 Commission Agenda: Briefing on Human Capital and Equal Employment Opportunity |
|
|
|
|
04/27/2010 |
|
04/29/10 Commission Agenda: Briefing on the Fuel Cycle Oversight Process Revisions |
|
|
|
|
04/26/2010 |
SECY-10-0053 |
Weekly Information Report - Week Ending April 16, 2010 |
|
|
|
|
04/26/2010 |
|
04/29/10 Meeting Slides: Briefing on the Fuel Cycle Oversight Process Revisions |
|
|
|
|
04/23/2010 |
CLI-10-13 |
U.S. Department of Energy |
|
|
|
|
04/23/2010 |
|
04/23/10 Commission Meeting - Affirmation Session |
|
|
|
|
04/22/2010 |
|
Staff Requirements Memorandum: 04/06/10 Periodic Briefing on New Reactor Issues – Design Certifications |
|
|
|
|
04/22/2010 |
SECY-10-0042 |
Reactor Oversight Process Self-Assessment for Calendar Year 2009 |
|
|
|
|
04/20/2010 |
SECY-10-0040 |
Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs Fiscal Year 2009 |
|
|
|
|
04/20/2010 |
SECY-10-0038 |
Update Status on the Development of Construction Reactor Oversight Process Options |
|
|
|
|
04/20/2010 |
|
04/15/10 Commission Meeting: Briefing on Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
04/19/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress providing a copy of an independent review by the Bipartisan Policy Center (BPC) of the NRC's licensing process for new reactors |
|
|
|
|
04/16/2010 |
|
Staff Requirements Memorandum: 04/08/10 Briefing on Regional Programs – Programs, Performance, and Future Plans |
|
|
|
|
04/16/2010 |
SECY-09-0181 |
Chairman Jaczko's vote and comments on SECY-09-0181 - Proposed Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
|
|
|
|
04/16/2010 |
SECY-10-0049 |
Weekly Information Report - Week Ending April 9, 2010 |
|
|
|
|
04/16/2010 |
SECY-10-0043 |
Blending of Low-Level Radioactive Waste |
|
|
|
|
04/14/2010 |
|
04/08/10 Commission Meeting: Briefing on Regional Programs -- Programs, Performance and Future Plans |
|
|
|
|
04/14/2010 |
SECY-10-0036 |
Update on Staff Efforts to Work with Federal Partners on Voluntary Security Initiatives for Radioactive Materials |
|
|
|
|
04/13/2010 |
|
05/04/10 Discussion of Management Issues (Closed-Ex. 2) - Full Written Explanation |
|
|
|
|
04/13/2010 |
SECY-10-0041 |
Weekly Information Report - Week Ending April 2, 2010 |
|
|
|
|
04/09/2010 |
SECY-10-0034 |
Potential Policy, Licensing, and Key Technical Issues for Small Modular Nuclear Reactor Designs |
|
|
|
|
04/08/2010 |
|
04/06/10 Commission Meeting: Periodic Briefing on New Reactor Issues -- Design Certifications |
|
|
|
|
04/08/2010 |
|
04/15/10 Meeting Agenda: Briefing on Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
04/08/2010 |
SECY-10-0025 |
Status of NRC's Response to the Open Government Directive |
|
|
|
|
04/08/2010 |
|
04/15/10 Meeting Slides: Briefing on Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance |
|
|
|
|
04/08/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress regarding NRC's Fiscal Year 2009 purchases related to the Buy American program |
|
|
|
|
04/07/2010 |
SECY-10-0039 |
Weekly Information Report - Week Ending March 26, 2010 |
|
|
|
|
04/07/2010 |
|
Letter from Chairman Gregory B. Jaczko to Senator Patrick Leahy, Senator Bernard Sanders and Congressman Peter Welch regarding a meeting to be held in New Hampshire instead of Vermont regarding the Vermont Yankee plant |
|
|
|
|
04/05/2010 |
|
03/30/10 Commission Meeting: Briefing on Safety Culture |
|
|
|
|
04/05/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman John W. Olver regarding the Vermont Yankee Nuclear Power Station in Brattleboro, Vermont |
|
|
|
|
04/02/2010 |
|
04/08/10 Meeting Slides: Briefing on Regional Programs -- Programs, Performance and Future Plans |
|
|
|
|
04/02/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress, Department of Justice, Office of Personnel Management and Equal Employment Opportunity Commission providing NRC's FY-2009 Annual Report on the Notification and Federal Employee Antidiscrimination and Retaliation (No FEAR) Act of 2002 |
|
|
|
|
04/01/2010 |
SECY-10-0028 |
Fiscal Year 2009 Results of the Industry Trends Program for Operating Power Reactors |
|
|
|
|
03/31/2010 |
|
04/06/10 Meeting Slides: Periodic Briefing on New Reactor Issues – Design Certifications |
|
|
|
|
03/26/2010 |
CLI-10-12 |
Tennessee Valley Authority |
|
|
|
|
03/26/2010 |
CLI-10-11 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
|
|
|
|
03/26/2010 |
SECY-10-0033 |
Weekly Information Report - Week Ending March 19, 2010 |
|
|
|
|
03/26/2010 |
|
03/26/10 Commission Meeting - Affirmation Session |
|
|
|
|
03/26/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress, the Government Accountability Office (GAO), and the Office of Management and Budget (OMB) providing a summary of actions taken by the NRC in response to recommendations contained in various GAO reports that address NRC activities |
|
|
|
|
03/25/2010 |
|
Staff Requirements Memorandum: 02/23/10 Briefing on Decommissioning Funding |
|
|
|
|
03/25/2010 |
SECY-10-0031 |
Revising the Fuel Cycle Oversight Process |
|
|
|
|
03/25/2010 |
|
03/30/10 Meeting Slides: Briefing on Safety Culture |
|
|
|
|
03/19/2010 |
|
Staff Requirements Memorandum: 02/18/10 Briefing on Office of Nuclear Regulatory Research -- Programs, Performance and Future Plans |
|
|
|
|
03/19/2010 |
SECY-10-0029 |
Weekly Information Report - Week Ending March 12, 2010 |
|
|
|
|
03/19/2010 |
SECY-10-0022 |
Proposed Rule: Domestic Licensing of Source Material – Amendments/Integrated Safety Analysis (RIN 3150-A150) |
|
|
|
|
03/19/2010 |
|
03/16/10 Commission Meeting: Joint Meeting of the Federal Energy Regulatory Commission and the Nuclear Regulatory Commission on Grid Reliability |
|
|
|
|
03/18/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Peter Orszag, Director, Office of Management and Budget, regarding Presidential Executive Memorandum on the subject of tribal consultation. |
|
|
|
|
03/18/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding concerns about NRC's regulations for the treatment of patients with radioisotopes and the criteria under which these patients are released from hospital care. |
|
|
|
|
03/18/2010 |
|
Staff Requirements Memorandum: 03/02/10 Briefing on Uranium Recovery |
|
|
|
|
03/16/2010 |
SECY-10-0026 |
Weekly Information Report - Week Ending March 5, 2010 |
|
|
|
|
03/12/2010 |
SECY-09-0189 |
Final Rule: 10 CFR 51.22, "Criterion for Categorical Exclusion; Identification of Licensing and Regulatory Actions Eligible for Categorical Exclusion or Otherwise not Requireing Environmental Review" (RIN 3150-A127) |
|
|
|
|
03/11/2010 |
SECY-10-0007 |
Denial of Petition for Rulemaking Requesting an Expedited Rulemaking to Revise the 10 CFR Section 73.55 Compliance Date (PRM7314) |
|
|
|
|
03/11/2010 |
SECY-09-0189 |
03/11/10 Commission Meeting - Affirmation Session |
|
|
|
|
03/10/2010 |
CLI-10-10 |
U.S. Department of Energy |
|
|
|
|
03/10/2010 |
CLI-10-09 |
Progress Energy Carolinas, Inc. |
|
|
|
|
03/10/2010 |
|
03/16/10 Meeting Slides: Joint Meeting of the Federal Energy Regulatory Commission and the Nuclear Regulatory Commission on Grid Reliability |
|
|
|
|
03/09/2010 |
|
03/02/10 Commission Meeting: Briefing on Uranium Recovery |
|
|
|
|
03/08/2010 |
SECY-10-0023 |
Weekly Information Report - Week Ending February 26, 2010 |
|
|
|
|
03/08/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Arne Duncan, Secretary of Education, submitting NRC's fiscal year 2010 Annual Federal Plan on Executive Agency Actions to Assist Historically Black Colleges and Universities (HBCUs)
|
|
|
|
|
03/08/2010 |
|
Letter from Chairman Gregory B. Jaczko to Mr. Arne Duncan, Secretary of Education, submitting the NRC's fiscal year 2009 Annual Federal Performance Report on Executive Agency Action to Assist Historically Black Colleges and Universities (HBCUs)
|
|
|
|
|
03/02/2010 |
|
02/23/10 Commission Meeting: Briefing on Decommissioning Funding |
|
|
|
|
03/01/2010 |
SECY-10-0018 |
Proposed Rulemaking to Revise the Definition of Construction in 10 CFR Parts 30, 36, 39, 40, 51, 70, and 150 (M081211 - Staff Requirements). |
|
|
|
|
02/26/2010 |
SECY-10-0021 |
Weekly Information Report - Week Ending February 19, 2010 |
|
|
|
|
02/26/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress enclosing the NRC's Annual Report on the Administration of the Government in the Sunshine Act for Calendar Year 2009
|
|
|
|
|
02/26/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congress and the Government Accountability Office (GAO) providing NRC actions taken regarding the GAO Report, "Managing Sensitive Information: Actions Needed to Prevent Unintended Public Disclosures of U.S. Nuclear Sites and Activities" (GAO-10-251) |
|
|
|
|
02/24/2010 |
|
03/02/10 Meeting Slides: Briefing on Uranium Recovery |
|
|
|
|
02/23/2010 |
COMSECY-10-0002 |
Renewal of Advisory Committee on Medical Isotopes (ACMUI) Charter |
|
|
|
|
02/23/2010 |
|
02/18/10 Commission Meeting: Briefing on Office of Nuclear Regulatory Research -- Programs, Performance and Future Plans |
|
|
|
|
02/23/2010 |
|
02/23/10 Commission Meeting - Affirmation Session |
|
|
|
|
02/23/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Jim Matheson regarding concerns about the blending of low-level radioactive waste streams |
|
|
|
|
02/22/2010 |
SECY-10-0020 |
Weekly Information Report - Week Ending February 12, 2010 |
|
|
|
|
02/19/2010 |
COMDEK-09-0001 |
Revisiting the Paradigm for Spent Fuel Storage and Transportation Regulatory Programs |
|
|
|
|
02/18/2010 |
|
02/23/10 Meeting Slides: Briefing on Decommissioning Funding |
|
|
|
|
02/18/2010 |
|
Staff Requirements Memorandum: 01/19/10 Briefing on the NRC Enforcement and Allegations Programs |
|
|
|
|
02/18/2010 |
SECY-10-0016 |
Redelegation of Authority by the Executive Director for Operations to the Director, Office of Nuclear Reactor Regulation, to Approve Title 10 of the Code of Federal Regulations 50.55a Rulemakings |
|
|
|
|
02/18/2010 |
SECY-10-0015 |
Second Annual Status of Reactivation of Construction and Licensing for the Watts Bar Nuclear Plant, Unit 2 |
|
|
|
|
02/17/2010 |
SECY-10-0019 |
Weekly Information Report - Week Ending February 5, 2010 |
|
|
|
|
02/17/2010 |
SECY-10-0003 |
2009 Annual Report on Commission Adjudication |
|
|
|
|
02/16/2010 |
SECY-09-0179 |
Chairman Jaczko's Vote on SECY-09-0179 - Proposed Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
|
|
|
|
02/16/2010 |
SECY-10-0009 |
Internal Safety Culture Update |
|
|
|
|
02/16/2010 |
|
02/18/10 Meeting Slides: Briefing on Office of Nuclear Regulatory Research -- Programs, Performance and Future Plans |
|
|
|
|
02/12/2010 |
|
Staff Requirements Memorandum: 01/12/10 Briefing on Office of Nuclear Security and Incident Response – Programs, Performance, and Future Plans |
|
|
|
|
02/12/2010 |
SECY-10-0017 |
Weekly Information Report - Week Ending January 29, 2010 |
|
|
|
|
02/12/2010 |
SECY-10-0012 |
Annual Report on Court Litigation (Calendar Year 2009) |
|
|
|
|
02/12/2010 |
SECY-10-0008 |
Status Report Regarding Staff Efforts to Work with Stakeholders to Catalogue Important Research That Has Been Affected by the Lack of Disposal Options for Radioactive Sources |
|
|
|
|
02/09/2010 |
|
Letter from Chairman Gregory B. Jaczko to Senator Bernard Sanders regarding the Vermont Yankee Nuclear Power Station and Entergy actions to identify and remediate the source of tritiated water |
|
|
|
|
02/05/2010 |
SECY-09-0035 |
Proposed Rule: Requirements for Distribution of Byproduct Material, Parts 30, 31, 32, 40, And 70 (RIN 3150-AH91) |
|
|
|
|
02/03/2010 |
COMSECY-09-0030 |
Request to Use Different Communication Tool to Remind Licensees of Responsibilities Regarding Disposal of Sources |
|
|
|
|
02/03/2010 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding the openness of NRC decision-making processes |
|
|
|
|
02/02/2010 |
|
02/09/10 Meeting Slides: Briefing on Regional Programs -- Programs, Performance and Future Plans |
|
|
|
|
02/01/2010 |
SECY-09-0136 |
Denial of Petition for Rulemaking Requesting a Ban on the Use and Export of High Enriched Uranium (PRM-50-90) |
|
|
|
|
02/01/2010 |
SECY-09-0162 |
Chairman Jaczko's Vote on SECY-09-0162 - Proposed Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN-3150-AI64) |
|
|
|
|
02/01/2010 |
SECY-10-0011 |
Weekly Information Report - Week Ending January 22, 2010 |
|
|
|
|
01/29/2010 |
SECY-09-0189 |
Chairman Jaczko's Vote on SECY-09-0189 - Final Rule: 10 CFR 51.22, "Criterion for Categorical Exclusion; Identification of Licensing and Regulatory Actions Eligible for Categorical Exclusion or Otherwise not Requiring Environmental Review" (RIN 3150-A127) |
|
|
|
|
01/28/2010 |
|
01/26/10 Commission Meeting: Briefing on Office of Nuclear Reactor Regulation -- Programs, Performance and Future Plans |
|
|
|
|
01/25/2010 |
|
Letter from Chairman Gregory B. Jaczko to Senator Arlen Specter regarding concerns about issues raised in a November 15, 2009, article published in the Philadelphia Inquirer |
|
|
|
|
01/25/2010 |
|
Letter from Chairman Gregory B. Jaczko to Peter Orszag, Director, Office of Management and Budget, designating NRC's Senior Sustainability Officer (SSO) |
|
|
|
|
01/22/2010 |
SECY-10-0006 |
Weekly Information Report - Week Ending January 15, 2010 |
|
|
|
|
01/21/2010 |
|
01/19/10 Commission Meeting: Briefing on the NRC Enforcement and Allegations Programs |
|
|
|
|
01/20/2010 |
SECY-09-0189 |
Final Rule: 10 CFR 51.22, "Criterion for Categorical Exclusion; Identification of Licensing and Regulatory Actions Eligible for Categorical Exclusion or Otherwise Not Requiring Environmental Review" (RIN 3150-AI27) |
|
|
|
|
01/20/2010 |
|
01/26/10 Meeting Slides: Briefing on Office of Nuclear Reactor Regulation -- Programs, Performance and Future Plans |
|
|
|
|
01/20/2010 |
SECY-09-0188 |
Annual Review of the Need for Rulemaking and/or Regulatory Guidance on Low-Level Radioactive Waste Storage |
|
|
|
|
01/19/2010 |
|
01/12/10 Commission Meeting: Briefing on Office of Nuclear Security and Incident Response (NSIR) -- Programs, Performance and Future Plans |
|
|
|
|
01/15/2010 |
SECY-10-0004 |
Weekly Information Report - Week Ending January 8, 2010 |
|
|
|
|
01/13/2010 |
|
Staff Requirements Memorandum: 12/08/09 Briefing on the Proposed Rule: Enhancements to Emergency Preparedness Regulations |
|
|
|
|
01/13/2010 |
|
01/19/10 Meeting Slides: Briefing on the NRC Enforcement and Allegations Programs |
|
|
|
|
01/08/2010 |
SECY-10-0001 |
Weekly Information Report - Week Ending January 1, 2010 |
|
|
|
|
01/08/2010 |
SECY-09-0190 |
Major Revision to NRC Enforcement Policy |
|
|
|
|
01/07/2010 |
CLI-10-08 |
Shieldalloy Metallurgical Corp. |
|
|
|
|
01/07/2010 |
CLI-10-07 |
PPL Bell Bend, LLC |
|
|
|
|
01/07/2010 |
CLI-10-06 |
Tennessee Valley Authority |
|
|
|
|
01/07/2010 |
CLI-10-05 |
Southern Nuclear Operationg Co. |
|
|
|
|
01/07/2010 |
CLI-10-04 |
GE-Hitachi Global Laser Enrichment LLC |
|
|
|
|
01/07/2010 |
CLI-10-03 |
Detroit Edison Co. |
|
|
|
|
01/07/2010 |
CLI-10-02 |
Progress Energy Florida, Inc |
|
|
|
|
01/07/2010 |
CLI-10-01 |
South Carolina Electric and Gas Co. and South Carolina Public Service Authority |
|
|
|
|
01/07/2010 |
|
01/07/10 Commission Meeting - Affirmation Session |
|
|
|
|
01/07/2010 |
SECY-10-0002 |
Weekly Information Report - Week Ending December 25, 2009 |
|
|
|
|
01/06/2010 |
SECY-09-0183 |
Proposed Modification for Including Quality Control and Quality Verification Personnel within the Scope of Subpart I of 10 CFR Part 26 |
|
|
|
|
01/06/2010 |
|
01/12/10 Meeting Slides: Briefing On Office Of Nuclear Security And Incident Response (NSIR) Programs, Performance, And Future Plans |
|
|
|
|
01/05/2010 |
|
01/05/10 Briefing on Threat Environment Assessment (Closed - Ex. 1) - Full Written Explanation |
|
|
|
|