Log No. |
Notifier |
Description |
Report Date |
Event No. / Accession No. |
2023-21-00 |
DC Cook Nuclear Plant |
Interim Report Notification Pursuant to 10 CFR Party 21.21, Regarding an issue with an Emergency Diesel Generator (EDG) Digital Reference Unit (DRU) supplied by Engine Systems Incorporated |
10/12/2023 |
EN 56789 |
2023-20-00 |
Browns Ferry Nuclear Plant |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump |
10/06/2023 |
ML23282A002 |
2023-19-00 |
Flowserve Limitorque Actuators |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding a Deviation Associated With a SMB-1 Geared Limit Switch Assembly |
09/28/2023 |
ML23276A641 |
2023-18-01 |
Paragon Energy Solutions |
Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Eaton JD and HJD Series Molded Case Circuit Breakers |
10/05/2023 |
ML23279A061 |
2023-18-00 |
Paragon Energy Solutions |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Eaton JD and HJD Series Molded Case Circuit Breakers |
09/06/2023 |
ML23254A024 |
2023-16-01 |
Cooper Nuclear Station |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Certain GE-Hitachi HGA Relays |
09/06/2023 |
ML23249A112 |
2023-14-01 |
GE Hitachi Nuclear Energy |
Part 21 Final Report Notification: Failure of the CRD Collet Retainer Tube/Outer Tube Weld |
07/27/2023 |
ML23207A198 |
2023-14-00 |
GE Hitachi Nuclear Energy |
Updated - Part 21 60-Day Interim Report Notification: Failure of the CRD Collet Retainer Tube/Outer Tube Weld |
08/31/2023 |
ML23243B004 |
2023-15-01 |
Paragon Energy Solutions |
Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors |
08/25/2023 |
ML23241A002 |
2023-13-01 |
River Bend Station |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Motor Driven Relay Failed Testing |
08/24/2023 |
ML23236A246 |
2023-17-00 |
Curtis-Wright Nuclear Division |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Tyco (Agastat) Relay Failures |
08/17/2023 |
ML23233A169 |
2023-16-00 |
Cooper Nuclear Station |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Certain GE-Hitachi HGA Relays |
08/15/2023
|
EN 56679 |
2023-15-00 |
Paragon Energy Solutions |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors |
08/03/2023 |
ML23221A370 |
2023-12-01 |
Summer |
10 CFR Part 21 Report Emergency Feedwater Check Valve Socket Head Capscrew |
07/31/2023 |
ML23212A954 |
2023-13-00 |
River Bend Station |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Motor Driven Relay Failed Testing |
07/26/2023 |
EN 56641 |
2023-10-01 |
Paragon Energy Solutions |
Retraction of Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Trane External Auto/Stop and Emergency Stop Relay Card PN: X13650728-06 |
07/14/2023 |
ML23207A076 |
2023-12-00 |
Summer |
Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding Cap Screw Improper Length |
07/07/2023 |
EN 56612 |
2023-11-00 |
Engine Systems, INC |
Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding Voltage Regulator Chassis – Bus Bar Installation |
06/30/2023 |
ML23192A062 |
2023-09-01 |
DTE Electric Company, Fermi 2 |
Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Mechanical Draft Cooling Tower Fan Brakes Design Flaw |
06/23/2023 |
ML23177A043 |
2023-10-00 |
Paragon Energy Solutions |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Potential Defect with Trane External Auto/Stop and Emergency Stop Relay Card PN: X13650728-06 |
06/05/2023 |
ML23159A005 |
2023-09-00 |
DTE Electric Company, Fermi 2 |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Mechanical Draft Cooling Tower Fan Brakes Design Flaw |
05/26/2023 |
ML23159A004 |
2023-08-00 |
Engine Systems, INC |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Woodward EGB-35P Governor |
05/24/2023 |
ML23146A001 |
2023-07-00 |
Flowserve Limitorque Actuators |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Limitorque Actuator Motor Pinion Installation |
05/19/2023 |
ML23142A174 |
2023-01-02 |
Sequoyah Nuclear Plant |
Retraction of Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator |
05/04/2023 |
ML23124A018 |
2023-06-00 |
Tennessee Valley Authority |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a GE HFA Relay |
05/01/2023 |
ML23121A325 |
2022-23-03 |
United Controls International |
Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures |
04/14/2023 |
ML23108A083 |
2023-05-00 |
Framatome Inc. |
Initial Report Notification Pursuant to 10 CFR Part 21.21, Regarding DS-206DC/416/632/II-516 Breakers – Erroneous Change of State (Eaton Corporation Breakers) |
04/07/2023 |
ML23100A107 |
2023-03-01 |
Paragon Energy Solutions |
Final Report Notification Pursuant to 10 CFR Part 21.21 Defect identified in Automatic Transfer Switch PN: NLI-ATS480A400X1 |
03/31/2023 |
ML23094A137 |
2022-28-02 |
Velan Inc |
Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve - Model W19-0CP13-KCDN-B0001 |
03/07/2023 |
ML23066A221 |
2023-04-00 |
Trillium Flow Technologies |
Initial Report Notification Pursuant to 10 CFR Part 21.21 Regarding Inconsistent Crimping of Motor Leads to Ring Terminal Connectors - Evaluation I211003 |
03/06/2023 |
ML23082A112 |
2023-03-00 |
Paragon Energy Solutions |
Initial Report Notification Pursuant to 10 CFR Part 21.21 Defect identified in Automatic Transfer Switch PN: NLI-ATS480A400X1 |
03/06/2023 |
ML23065A196 |
2022-26-02 |
Flowserve-Limitorque |
Final Notification of Potential Part 21 on Peerless 56 frame DC Motors |
03/03/2023 |
ML23065A200 |
2022-23-02 |
United Controls International |
Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures |
03/03/2023 |
ML23065A193 |
2023-01-01 |
Sequoyah Nuclear Plant |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator |
03/01/2023 |
ML23060A041 |
2022-25-01 |
QualTech NP, Curtiss-Wright Nuclear Division |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Eaton TRM5 Timing Relays |
02/06/2023 |
ML23038A019 |
2022-26-01 |
Flowserve-Limitorque |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Peerless 56 Frame DC Motors |
01/27/2023 |
ML23030A664 |
2023-02-00 |
Sequoyah Nuclear Plant |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Siemens Medium Voltage Circuit Breakers |
01/25/2023 |
ML23025A253 |
2023-01-00 |
Sequoyah Nuclear Plant |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Deviation or Failure to Comply Associated with a Limitorque Actuator |
01/24/2023 |
ML23024A029 |
2022-28-01 |
Velan Inc |
Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve - Model W19-0CP13-KCDN-B0001 |
01/19/2023 |
ML23023A036 |
2022-27-01 |
Wolf Creek Nuclear Operating Corporation |
Interim Notification Pursuant To 10 CFR Part 21.21, Regarding Main Steam Isolation Valves (MSIVs ) (Valve Type PPS-A 700) and Main Feedwater Isolation Valves (MFIVs) (Valve Type PPS-A 300) Torque Values |
01/11/2023 |
ML23011A062 |
2022-23-01 |
United Controls International |
Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures |
01/03/2023 |
ML23004A091 |
2022-28-00 |
Velan Inc |
Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding 14NPS Class 150 Triple Offset Butterfly Valve |
12/21/2022 |
ML22356A058 |
2022-09-03 |
Curtiss-Wright Nuclear Division |
Updated Report Notification Pursuant To 10 CFR Part 21.21, Regarding Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies |
12/16/2022 |
ML22356A051 |
2022-27-00 |
Wolf Creek Nuclear Operating Corporation |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Inadequate Torque Values |
12/12/2022 |
EN 56269 |
2022-26-00 |
Flowserve-Limitorque |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding Peerless 56 Frame DC Motors |
12/01/2022 |
ML22342B140 |
2022-25-00 |
Curtiss-Wright Nuclear Division |
Interim Report Notification Pursuant to 10 CFR Part 21.21, Regarding QualTech NP Supplied Eaton TRM5 Timing Relays |
11/30/2022 |
ML22341A032 |
2022-17-01 |
Global Nuclear Fuel |
Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding GNF3 Raised Water Rod (SC-22-04 Revision 2) |
11/30/2022 |
ML22334A267 |
2022-24-00 |
Flowserve Corporation |
10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation #105 |
11/10/2022 |
ML22319A094 |
2022-23-00 |
United Controls International |
Notification under 10 CFR Part 21 for Schneider Electric P/N: ASP840-000 Modicon Primary/Secondary Power Supply |
11/04/2022 |
ML22314A013 |
2022-21-00 |
Nutherm International, Inc |
NRC 10 CFR Part 21 Notification, Nutherm, written notification of potential defect found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (UPS), S4K2U1000-NM 191 |
11/01/2022 |
ML22307A019 |
2022-19-00 |
Emerson Automation Solutions / Rosemount Nuclear Instruments, Inc |
Notification under 10 CFR Part 21 for Rosemount 3153N Series Pressure Transmitter with Rosemount 3159 Remote Seals with the LG1 option |
11/01/2022 |
ML22307A020 |
2022-22-00 |
Fairbanks Morse |
Basic Component Which Fails to Comply or Contains a Defect (Woodward 2301A Emergency Diesel Generator Electronic Speed Control Module |
10/31/2022 |
ML22307A060 |
2022-20-00 |
Grand Gulf |
Inadequate Lubrication of Containment Personnel Airlock Equalizing Valves |
10/31/2022 |
ML22305A515 |
2022-17-00 |
Global Nuclear Fuel |
Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod |
10/28/2022 |
ML22301A174 |
2022-18-01 |
Tioga Pipe Inc. |
Revised Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe |
09/02/2021 |
ML22303A005 |
2022-18-00 |
Tioga Pipe Inc. |
Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe |
08/31/2021 |
ML22303A004 |
2022-16-01 |
Diversified Machine Components |
Part 21 Notification - Part Number 00900490-00114N Lock Nut (see pages 3 and 4) |
09/07/2022 |
ML22286A048 |
2022-16-00 |
Diversified Machine Components |
Part 21 Initial Notification - Part Number 00900490-00114N Lock Nut (see pages 1 and 2) |
09/02/2022 |
ML22286A048 |
2022-12-01 |
Valcor Engineering Corporation |
Part 21 Final Notification – Premature Failures of Valcor Coil Shell Assemblies |
09/12/2022 |
ML22266A194 |
2022-12-00 |
Valcor Engineering Corporation |
Part 21 Interim Report Notification – Premature Failures of Valcor Coil Shell Assemblies |
07/18/2022 |
ML22266A193 |
2022-09-02 |
Curtiss-Wright Nuclear Division |
Closure Notification of the Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) |
08/26/2022 |
ML22259A173 |
2022-15-00 |
Farley, Units 1 and 2 |
Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers |
08/17/2022 |
ML22229A515 |
2022-14-00 |
NTS |
Interim Potential Part 21 on Siemens Medium Voltage Circuit Breakers with 3AF Operators Sold to Wolf Creek Nuclear Generating Station |
08/05/2022 |
ML22238A152 |
2021-29-03 |
Lake Engineering Co. |
Final Report per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 |
07/31/2022 |
ML22234A160 |
2022-10-00 |
Flowserve U S, Inc. |
Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for use on FWIV Actuator |
07/01/2022 |
ML22222A009 |
2022-13-00 |
Leonardo DRS Naval Power Systems |
16-AAT907B Power Supply 10 CFR Part 21 Notification |
08/02/2022 |
ML22220A236 |
2022-09-01 |
Curtiss-Wright Nuclear Division |
Follow Up to Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) |
07/25/2022 |
ML22215A250 |
2022-09-00 |
Curtiss-Wright Nuclear Division |
Potential Defect in Configuration of Quick Disconnect Connector Cable Assemblies (P/N: 913602-111) |
06/24/2022 |
ML22208A168 |
2022-08-00 |
Nutherm International, Inc. |
10 CFR Part 21 Notification – Arnold Magnetics Power Supply Part Number PBM-24-106 |
06/17/2022 |
ML22208A004 |
2022-11-00 |
Framatome Inc. |
Notification of 10 CFR Part 21 Defect and Failure to Comply: Relay - Failure to Change State |
07/13/2022 |
ML22201A101 |
2022-05-00 |
QualTech NP |
10 CFR Part 21 Notification for a Curtiss-Wright Supplied RCS/Dresser Actuator, P/N SURE-24-10-4 |
04/06/2022 |
ML22153A079 |
2021-29-02 |
Lake Engineering Co. |
Third Interim Notification per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 |
05/12/2022 |
ML22154A191 |
2022-04-01 |
V.C. Summer |
Updated 10 CFR 21 Report – Feedwater Isolation Valve Poppet Seal Failure |
05/26/2022 |
ML22146A396 |
2022-07-00 |
Westinghouse Electric Company |
Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 |
04/11/2022 |
ML22140A208 |
2022-06-00 |
McGuire Nuclear Station |
Interim Report of a Deviation or Failure to Comply |
04/08/2022 |
ML22098A016 |
2022-03-00 |
Engine Systems, Inc. |
EMD Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485 |
03/29/2022 |
ML22098A117 |
2022-04-00 |
V.C. Summer |
10 CFR 21 Report – Feedwater Isolation Valve Poppet Seal Failure |
03/30/2022 |
ML22089A244 |
2022-02-00 |
Ultra Energy |
Report Under 10 CFR 21 of Noncompliances to Specification for N7030 Temperature Transmitter |
03/09/2022 |
ML22087A009 |
2021-29-01 |
Lake Engineering Co. |
Second Interim Notification per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 |
03/03/2022 |
ML22067A172 |
2021-07-02 |
Ametek Solidstate Controls, Inc |
Final Notification of Potential Defect - 300V, 250A Clamp Diodes |
02/11/2022 |
ML23229A005 |
2022-01-00 |
Emerson Process Management / TopWorx |
Interim Report of a Deviation Related to Limit Switch Dual Continuity Indication |
01/28/2022 |
ML22060A124 |
2021-28-00 |
Callaway Plant |
Written Notification Regarding Paragon Energy Solutions, LLC Power Supplies |
12/01/2021 |
ML21363A151 |
2021-27-00 |
Engine Systems, Inc |
Part 21 Notification for Defective Hinge Pin Retainer Plug on Diesel Check Valve PN ESI50359 |
11/24/2021
|
ML22021A029
|
2021-29-00 |
Lake Engineering Co. |
Interim Notification per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 |
12/28/2021 |
ML22019A176 |
2019-39-02 |
Westinghouse Electric Company |
NSAL-20-1 Revision 1, "Reactor Vessel Head Control Rod Drive Mechanism Penetration Thermal Sleeve Cross-Sectional Failure" (Note: NSAL-20-1, Rev 1 is not a Part 21 report. However NSAL-20-1 does contain additional information related to the condition described in Part 21 report 2019-0039-00 and -01) |
10/13/2021 |
ML21287A184 |
2021-08-03 |
Cameron |
Nuclear Product Advisory 210316064.4, "BARTON 763/763A/764 Transmitter Heat Rise and Qualified Life." (Note: This Nuclear Product Advisory is not a Part 21 report. However the Product Advisory does contain additional information related to the condition described in Part 21 Report 2020-0008-00). |
11/23/2021 |
ML21328A005 |
2021-26-00 |
Paragon Energy Solutions |
Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) |
10/27/2021 |
ML21322A051 |
2020-08-02 |
Cameron |
Nuclear Product Advisory 210316064.3, "BARTON 763/763A/764 Transmitter Heat Rise and Qualified Life." (Note: This Nuclear Product Advisory is not a Part 21 report. However the Product Advisory does contain additional information related to the condition described in Part 21 Report 2020-0008-00). |
06/17/2021 |
ML21172A304 |
2021-25-00 |
United Controls International |
United Controls International - 10 CFR21 Notification for York PIN: TCM-1 A Temperature Control Modules |
10/28/2021 |
ML21306A180 |
2021-16-01 |
Arkansas Nuclear One, Units 1 and 2 |
Retraction of Interim Part 21 Report Concerning Potential Defect of FlowServe/Kerotest Globe Valve |
10/29/2021
|
ML21302A072 |
2021-21-01 |
Southern Nuclear / Farley Units 1 and 2 |
Written 10 CFR 21 Notification – General Electric Hitachi Trip Unit Rivets Popping Off |
10/22/2021 |
ML21295A328 |
2021-24-00 |
Engine Systems, Inc. |
Part 21 Reportable Notification on a Pressure Regulator Valve |
10/18/2021 |
ML21295A247 |
2021-18-01 |
Flowserve Nuclear Products Operations |
Closure of Formal Evaluation - DC Cook O-Ring |
10/11/2021 |
ML21288A055 |
2021-23-00 |
Flowserve |
Part 21 Notification for Limitorque Supplied DC Motor |
10/04/2021 |
ML21294A029 |
2021-22-00 |
Paragon Energy Solutions |
Notification of a Deviation with Inverter Assembly |
09/28/2021 |
ML21294A030 |
2021-21-00 |
Farley Units 1 and 2 |
Initial 10 CFR 21 Notification – General Electric Hitachi Trip Unit Rivets Popping Off |
09/24/2021 |
ML21267A538 |
2021-11-01 |
Framatome Inc |
Long Term Solution for 10 CFR Part 21 Defect |
09/23/2021 |
ML21271A234 |
2021-20-00 |
V. C. Summer |
Condition Prohibited by Technical Specifications (involving supports for SR Chillers) (a 50.73 Report) (See related Log No. 2021-0012-01) |
08/26/2021 |
ML21238A158 |
2021-19-00 |
TE Connectivity |
Part 21 Transfer of Information – HI-POT Tester for EGP/ETR Series Relays |
09/14/2021 |
ML21264A133 |
2021-18-00 |
Flowserve Nuclear Products Operations |
Interim Report – Formal Evaluation of Deviations Reported |
09/10/2021 |
ML21258A254 |
2021-17-00 |
Ametek Solidstate Controls, Inc |
Notification of Potential Defect – 10 CFR Part 21 for Omron Timer Relay |
09/09/2021
|
ML21260A007 |
2021-16-00 |
Arkansas Nuclear One, Units 1 and 2 |
Interim Part 21 Report Concerning Potential Defect of FlowServe/Kerotest Globe Valve |
08/25/2021 |
ML21237A248 |
2020-21-06 |
Lake Engineering Co. |
Final Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 |
08/04/2021 |
ML21225A081 |
2021-15-00 |
Phi-Delta, Inc. |
Error Notification for Level 4 Bug in PD/EPD STRUDL |
06/14/2021 |
ML21215A030 |
2021-14-00 |
Engine Systems, Inc. |
Zinc Anode Installed in Emergency Diesel Generator Heat Exchanger (P/N 1335BEM2P) |
07/09/2021 |
ML21209A529 |
2021-13-00 |
Vogtle Electric Generating Plant Units 3 and 4 |
Submittal of 10 CFR 50.55(e) Report Regarding Electrical Construction and Measuring & Test Equipment Control |
06/25/2021 |
ML21176A200 |
2021-12-01 |
Paragon Energy Solutions |
Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification (Update) |
06/28/2021 |
ML21187A124 |
2021-06-04 |
Paragon Energy Solutions |
Failure of Size 1 and 2 Freedom Series FVR Starters (written notification of the identification of a defect) |
06/29/2021 |
ML21181A220 |
2020-33-00 |
Cameron Energy Services |
Nuclear Product Advisory: Barton 752, 752A, 752B, 764 Transmitter Hydrostatic Test |
11/09/2020 |
ML20315A535 |
2021-12-00 |
Paragon Energy Solutions |
Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification |
06/10/2021 |
ML21174A009 |
2021-09-01 |
GE Hitachi Nuclear Energy |
10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors |
06/17/2021 |
ML21168A217 |
2021-06-03 |
Paragon Energy Solutions |
Interim Report for Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters |
05/28/2021 |
ML21152A279 |
2021-11-00 |
Framatome Inc. |
10 CFR Part 21 Notification of Existence of a Defect |
06/02/2021 |
ML21161A238 |
2021-08-01 |
Meggitt Safety Solutions, Inc. |
Closure of MSSI Interim Report of a Deviation pursuant to 10 CFR 21.21(a)(2) |
06/04/2021 |
ML21161A008 |
2021-03-01 |
Crane Nuclear, Inc. |
Closure of Potential Part 21 Issue |
06/03/2021 |
ML21158A007 |
2020-21-05 |
Lake Engineering Co. |
Sixth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 |
05/07/2021 |
ML21146A246 |
2021-10-00 |
Xcel Energy / Monticello |
Initial and Final Written 10 CFR 21 Notification for GE Hitachi NUMAC Power Range Nuclear Monitoring System |
05/07/2021 |
ML21130A302 |
2021-06-02 |
Paragon Energy Solutions |
Failure of Size 1 and 2 Freedom Series FVR Starters (Updated Part Numbers and Date Codes) |
05/03/2021 |
EN 55223 |
2021-06-01 |
Paragon Energy Solutions |
Failure of Size 1 and 2 Freedom Series FVR Starters |
04/29/2021 |
ML21126A172 |
2021-02-01 |
Flowserve Limitorque |
Final Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) |
04/20/2021 |
ML21111A322 |
2021-09-00 |
GE Hitachi Nuclear Energy |
Part 21 60-Day Interim Report Notification: Side Entry Orifice Hydraulic Loss Coefficient (SC 21-04 R0) |
04/19/2021 |
ML21109A337 |
2021-07-01 |
AMETEK Solidstate Controls |
Udated Notification of Potential Defect - 300V, 250A Clamp Diodes |
04/06/2021 |
ML21096A114 |
2021-08-00 |
Meggitt Safety Solutions, Inc |
Interim Report of a Deviation pursuant to 10 CFR 21.21(a)(2) |
04/05/2021 |
ML21099A085 |
2020-06-01
|
Fluke Health Solutions |
Final Part 21 Report re: Nickel Seal Ring Heat Treatment Dedication. |
04/02/2021 |
ML21098A155
|
2021-07-00 |
AMETEK Solidstate Controls |
Notification of Potential Defect - 300V, 250A Clamp Diodes |
04/01/2021 |
ML21092A129 |
2021-06-00 |
Paragon Energy Solutions |
Failure of Size 1 and 2 Freedom Series FVR Starters |
03/30/2021 |
EN 55162 |
2021-04-00 |
Browns Ferry Nuclear Power Plant |
Interim Report of a Deviation or Failure to Comply |
03/23/2021 |
ML21082A116 |
2021-01-01 |
Arkansas Nuclear One, Unit 1 |
Retraction of an Interim Report Concerning an Evaluation of Deviation |
03/15/2021 |
ML21074A338 |
2021-03-00 |
Crane Nuclear, Inc. |
Potential Part 21 Issue |
03/05/2021 |
ML21089A050 |
2020-21-04 |
Lake Engineering Co. |
Fifth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 |
02/17/2021 |
ML21063A153 |
2021-05-01 |
Gutor Electronic LLC
|
Final Report of Notification of Potential Defect (A070 Controller Boards) |
03/19/2021 |
ML21105A359 |
2021-05-00 |
Gutor Electronic LLC |
Potential Defect of Basic Components (A070) Controller Boards |
02/12/2021 |
ML21084A114 |
2021-02-00 |
Flowserve Limitorque |
Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) |
02/04/2021 |
ML21036A187 |
2019-33-01 |
Westinghouse Electric Company |
Closure of Westinghouse Interim Report of the Evaluation of a Deviation Related to 'T cold' Measurement Uncertainty [Log No. 2019-33-00 (ML19294C507)] |
03/12/2020 |
ML20077M122 |
2021-01-00 |
Arkansas Nuclear One, Unit 1 |
Interim Report Concerning an Evaluation of Deviation |
01/18/2021 |
ML21018A005 |