2014-91-01 Baldor Electric Co. Written and Final Report - Baldor AC Motors with Potential Bearing End Cap Alignment Issues (Revised) 01/23/2015 ML15034A566
2014-91-00 Baldor Electric Co. Baldor AC Motors with Potential Bearing End Cap Alignment Issues 12/23/2014 ML14365A059
2014-90-02 ABB Inc. Second Update to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 11/17/2016 ML16328A313
2014-90-01 ABB Amendment to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 03/05/2015 ML15070A543
2014-90-00 ABB Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 12/17/2014 ML14357A334
2014-89-01 ASCO Valve, Inc. Final Report - Potential Part 21 Notification (Steris Isomedix) 08/19/2015 ML15243A173
2014-89-00 ASCO Valve, Inc. Interim Report - Potential Part 21 Notification (Steris Isomedix) 12/16/2014 ML14357A335
2014-88-01 WECTEC LLC (formerly CB&I Power) Closure of Interim Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects 01/15/2016 ML16034A222
2014-88-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects 12/04/2014 ML14349A376
2014-87-01 CB&I Nuclear Closure of Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project 01/08/2015 ML15022A201
2014-87-00 CB&I Nuclear Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project 11/13/2014 ML14337A115
2014-86-03 CB&I Nuclear

Closure of Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)

06/09/2015 ML15173A096
2014-86-02 CB&I Nuclear

Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)

03/20/2015 ML15180A134
2014-86-01 CB&I Nuclear Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) 01/21/2015 ML14337A114
2014-86-00 CB&I Nuclear Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) 11/20/2014 ML14337A114
2014-85-01 CB&I Nuclear Closure of Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) 06/09/2015 ML15173A096
2014-85-00 CB&I Nuclear Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) 11/13/2014 ML14335A295
2014-84-01 AREVA Inc. Defect in LOCA Analysis for B&W Plants (Written Report) 12/16/2014 ML14351A308
2014-84-00 AREVA Inc. Defect in LOCA Analysis for B&W Plants 11/25/2014 ML14337A095
2014-83-01 National Technical Systems Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Updated Interim Report) 05/21/2015 ML15152A125
2014-83-00 National Technical Systems Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Interim Report) 11/12/2014 ML14325A687
2014-82-00 Emerson Process Management Improper Dedication of Fisher Controls Type 67 AFR Regulator Diaphragm Assembly Parts 11/19/2014 ML14337A093
2014-81-02 Technology for Energy Corporation Final Notification of Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems 12/18/2014 EN 50623
2014-81-01 Technology for Energy Corporation Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems (Corrected Report) 11/24/2014 ML14337A094
2014-81-00 Technology for Energy Corporation Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems 11/18/2014 ML14329A063
2014-80-00 Flowserve Miller Air Cylinder Seal Dedication Issue 11/13/2014 ML14321A011
2014-79-02 CB&I Nuclear Closure of Interim Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 02/23/2015 ML15055A525
2014-79-01 CB&I Nuclear Updated Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 12/09/2014 ML15029A057
2014-79-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 10/23/2014 ML14310A577
2014-78-01 TVA - Browns Ferry Units 1, 2, 3 Closure of Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX 10/31/2014 ML14309A529
2014-78-00 TVA - Browns Ferry Units 1, 2, 3 Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX 09/05/2014 ML14318A196
2014-77-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 10/16/2014 ML14297A152
2014-77-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project 08/14/2014 ML14234A021
2014-76-02 CB&I Nuclear Part 21 Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects 01/13/2015 ML15027A425
2014-76-01 CB&I Nuclear Updated Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects 12/11/2014 ML15014A214
2014-76-00 CB&I Nuclear

Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects

10/15/2014 ML14296A427
2014-75-00 Ametek Solidstate Controls Insufficient Spot Weld on Wire Wound Resistor 10/17/2014 ML14294A684
2014-74-01 Waterford 3 Written Notification of Defective Allen Bradley Type 700RTC Relay 11/12/2014 ML14316A441
2014-74-00 Waterford 3 Defective Allen Bradley Type 700RTC Relay 10/26/2014 ML14294A685
2014-73-01 AREVA Inc. Notification of an Error in POWERPLEX MCPR and LHGR Limit Input for Browns Ferry Unit 2 10/27/2014 ML14303A258
2014-73-00 AREVA Inc. Defect in the Input to Calculate Thermal Limits 10/03/2014 ML14281A061
2014-72-00 Electroswitch Orientation of Series 20 Internal Wire may Allow the Side Cover Screw to Touch the Wire Insulation 10/03/2014 ML14281A062
2014-71-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) 01/08/2015 ML15022A201
2014-71-00 CB&I Nuclear Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) 08/27/2014 ML14255A017
2014-70-01 Oyster Creek Electromatic Relief Valve Excessive Wear 10/08/2014 ML14302A071
2014-70-00 Oyster Creek Electromatic Relief Valve Excessive Wear 09/25/2014 EN 50495
2014-69-00 Carboline Company Carboline SG Base Not Curing Properly 09/23/2014 EN 50486
2014-68-01 QualTech NP Close Out of Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions 12/30/2014 ML15014A107
2014-68-00 QualTech NP Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions 09/22/2014 ML14268A234
2014-67-00 Nuclear Innovation North America, LLC Response to General Electric-Hitachi Final Part 21 Report from STP Units 3 & 4 (See Part 21 No. 2014-18-00/-01/-02) 09/15/2014 ML14261A148
2014-66-02 CB&I Nuclear Closure of Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 10/16/2014 ML14297A152
2014-66-01 CB&I Nuclear Updated Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 09/16/2014 ML14274A040
2014-66-00 CB&I Nuclear Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 09/04/2014 ML14259A350
2014-65-01 The Okonite Company Final Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix 07/30/2015 ML15232A523
2014-65-00 The Okonite Company Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix 08/27/2014 ML14254A428
2014-64-01 Summer Units 2 & 3 Root Cause Analysis for Deviations Associated with the Submodule Welding Program (a 10CFR50.55(e) report) 09/29/2014 ML14272A353
2014-64-00 Summer Units 2 & 3 Welding Program Deviations During Construction (a 10CFR50.55(e) report) 09/10/2014 EN 50442
2014-63-00 Vogtle Units 3 & 4 Welding Program Deviations During Construction (a 10CFR50.55(e) report) 09/10/2014 EN 50441
2014-62-00 Cameron Measurement Systems Defective Barton Differential Pressure Switches 09/09/2014 ML14259A390
2014-61-00 Underwater Construction Corporation Failure to Meet Specified Irradiation During Testing of Coated Test Panels 09/08/2014 ML14259A389
2014-60-01 Schulz Electric Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 (Final Evaluation) 09/30/2014 ML14275A161
2014-60-00 Schulz Electric Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 09/05/2014 EN 50428
2014-59-01 CB&I Nuclear Closure of Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) 09/04/2014 ML14259A351
2014-59-00 CB&I Nuclear Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) 07/30/2014 ML14237A119
2014-58-01 ABB Inc. Amended Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 09/12/2014 ML14265A049
2014-58-00 ABB Inc. Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 08/15/2014 ML14237A121
2014-57-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project 10/16/2014 ML14297A152
2014-57-00 CB&I Nuclear Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project 08/01/2014 ML14220A025
2014-56-02 Nutherm International, Inc. Final Update on Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 02/03/2016 ML16039A269
2014-56-01 Nutherm International Updated Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 08/31/2015 ML15251A213
2014-56-00 Nutherm International Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 08/01/2014 ML14226A995
2014-55-00 Crane Nuclear, Inc. Safety - Related Valves Assembled with Non-Safety Related Levers 08/01/2014 ML14218A510
2014-54-00 United Controls International Interim Report - Temperature Switch Set Points out of Calibration 07/31/2014 ML14217A347
2014-53-01 SOR, Inc. Potentially Defective Pressure and Temperature Switches 04/02/2015 ML15099A043
2014-53-00 SOR, Inc. Potentially Defective Pressure and Temperature Switches 07/23/2014 ML14213A099
2014-52-00 Fisher Controls International Non-Conforming Solenoid Valves Sent to Progress Energy - Brunswick 07/21/2014 ML14210A009
2014-51-03 ITT Engineered Valves, LLC Second Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 04/07/2015 ML15103A485
2014-51-02 ITT Engineered Valves, LLC Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 09/17/2014 ML14261A150
2014-51-01 ITT Engineered Valves, LLC Written Notification - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 08/14/2014 ML14226A641
2014-51-00 ITT Engineered Valves, LLC Improper Irradiation of Samples for Ball Valve Seats and Diaphagms (Steris Isomedix Services) 07/18/2014 ML14210A053
2014-50-01 Velan Inc. Revised Notification of Defects on 2 -inch Bonnets (Corrected Part Number) 07/28/2014 ML14213A010
2014-50-00 Velan Inc. Notification of Defects on 2-inch Bonnets 07/18/2014 ML14210A008
2014-49-00 Westinghouse Electric Co. Potential Failure of Reactor Coolant Pump Turning Vane Bolts 07/14/2014 ML14197A281
2014-48-00 Nuclear Logistics, Inc. Assembly Errors During Breaker Refurbishment 07/11/2014 ML14197A380
2014-47-01 CB&I Nuclear Closure of Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) 09/04/2014 ML14259A351
2014-47-00 CB&I Nuclear Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) 07/03/2014 ML14192A041
2014-46-02 CB&I Nuclear Closure of Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 10/16/2014 ML14297A152
2014-46-01 CB&I Nuclear Updated Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 08/19/2014 ML14253A142
2014-46-00 CB&I Nuclear Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 07/03/2014 ML14192A039
2014-45-01 Preferred Metal Technologies, Inc. Final Report - Incorrect Industrial Irradiator Dose (Steris Isomedix Services) 07/30/2014 ML14216A377
2014-45-00 Preferred Metal Technologies, Inc. Incorrect Industrial Irradiator Dose (Steris Isomedix Services) 07/03/2014 ML14192A040
2014-44-00 Kinectrics Inc. Potential Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Steris) 06/27/2014 ML14184B303
2014-43-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project 09/04/2014 ML14259A351
2014-43-00 CB&I Nuclear Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/10/2014 ML14178A113
2014-42-01 Waterford 3 Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration 07/09/2014 ML14190B371
2014-42-00 Waterford 3 Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration 06/12/2014 ML14171A356
2014-41-01 CB&I Nuclear Closure of Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project 07/30/2014 ML14237A119
2014-41-00 CB&I Nuclear Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project 05/23/2014 ML14160A721
2014-40-02 CB&I Nuclear Closure of Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module 10/16/2014 ML14297A152
2014-40-01 CB&I Nuclear Updated Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication 07/21/2014 ML14212A412
2014-40-00 CB&I Nuclear Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication 05/22/2014 ML14160A718
2014-39-00 AREVA Inc. Defect Identified in Single Loop Operation Minimum Critical Power Ratio 06/04/2014 ML14160A781
2014-38-01 Watts Bar Final Report - Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) 06/19/2014 ML14174A042
2014-38-00 Watts Bar Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) 06/03/2014 ML14160A783
2014-37-01 Flowserve Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 06/02/2014 ML14364A168
2014-37-00 Flowserve Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 04/02/2014 ML14154A086
2014-36-02 Shaw AREVA MOX Services Closure of Interim Report - Nelson Deformed Bars 11/13/2014 ML14317A461
2014-36-01 Shaw AREVA MOX Services Updated Interim Report - Nelson Deformed Bars 08/26/2014 ML14238A581
2014-36-00 Shaw AREVA MOX Services Interim Report - Nelson Deformed Bars 05/28/2014 ML14148A271
2014-35-01 Pentair Valves and Controls Closure of Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met 08/27/2014 ML14241A238
2014-35-00 Pentair Valves and Controls Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met 05/23/2014 ML14147A370
2014-34-01 Browns Ferry Nuclear Plant Closure of Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing 07/07/2014 ML14189A417
2014-34-00 Browns Ferry Nuclear Plant Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing 05/09/2014 ML14135A035
2014-33-00 Pentair Interim Report - Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing 05/08/2014 ML14129A436
2014-32-00 Scientech NUS-710DU Trip Units Could Fail to Produce a Valid Trip Signal in Certain Operating Configurations 05/08/2014 ML14134A079
2014-31-00 Flowserve Size 4 Pressure Class 600 Normally Open In-Line Check Valves Missing Jam Nuts 05/02/2014 ML14125A270
2014-30-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 05/20/2014 ML14160A719
2014-30-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 Project 04/23/2014 ML14121A058
2014-29-01 North Anna 1 & 2 Retraction of Interim Report - Basler Motor Operated Control (Potentiometer) Not Functioning Properly 06/16/2014 ML14174A936
2014-29-00 North Anna 1 & 2 Basler Motor Operated Control (Potentiometer) Not Functioning Properly 04/21/2014 ML14113A588
2014-28-06 CB&I Nuclear Closure of Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (See related 50.55(e) reports at 2014-63-00 and 2014-64-00) 06/09/2015 ML15173A096
2014-28-05 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 11/05/2014 ML14325A688
2014-28-04 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 05/02/2014 ML14129A471
2014-28-03 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 04/30/2014 ML14136A039
2014-28-02 CB&I Nuclear Interim Part 21 Report Regarding Sub-Module Coupler Welding Qualification. Nonconformance for AP1000. 04/28/2014 ML14127A098
2014-28-01 CB&I Nuclear Updated Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 04/22/2014 ML14121A057
2014-28-00 CB&I Nuclear Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 02/21/2014 ML14112A085
2014-27-00 QualTech NP QualTech NP Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911 (See Part 21 Reports 2014-12-00 and 2014-12-01) 04/09/2014 ML14107A161
2014-26-01 Cameron Measurement Systems Barton Model 288A and 289A Differential Pressure Switch Defect (Supplementary Information and Closure) 06/09/2014 ML14170A013
2014-26-00 Cameron Measurement Systems Barton Model 288A and 289A Differential Pressure Switch Defect 04/10/2014 ML14105A039
2014-25-00 Rosemount Nuclear Instruments Certain Model 1154HP Transmitters Shipped to Point Beach May Exhibit Degraded Functional Reliability 04/10/2014 ML14105A018
2014-24-01 Baldor Electric Co. Potential Defect in Motors Shipped to DTE Electric Company 04/15/2014 ML14112A481
2014-24-00 Baldor Electric Co. Potential Defect in Motors Shipped to DTE Electric Company 04/09/2014 ML14101A344
2014-23-02 QualTech NP Revision to Final Notification Related to Potential Defect in General Electric Type CR120AD Control Relays 02/05/2015 ML15040A083
2014-23-01 QualTech NP Potential Defect in General Electric Type CR120AD Control Relays (Update / Closure) 05/09/2014 ML14134A121
2014-23-00 QualTech NP Potential Defect in General Electric Type CR120AD Control Relays 04/09/2014 ML14101A343
2014-22-00 United Controls International Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SB1 Switches and HEA Relays 04/09/2014 ML14101A342
2014-21-00 Pentair Valves and Controls Interim Report – Evaluation regarding potential deficiencies in justification of use of prorate spring in PV-62 (CAR 674) 03/27/2014 ML14090A433
2014-20-00 Pentair Valves and Controls Interim Report - Evaluation regarding potential deficiencies in testing of PV-62 (CAR 675) 03/27/2014 ML14090A431
2014-19-02 Pentair Valves and Controls Closure of Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 08/27/2014 ML14241A038
2014-19-01 Pentair Valves and Controls Updated Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 06/15/2014 ML14169A030
2014-19-00 Pentair Valves and Controls Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 03/27/2014 ML14090A430
2014-18-02 GE Hitachi Nuclear Energy Closure of Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 08/29/2014 ML14241A306
2014-18-01 GE Hitachi Nuclear Energy Updated Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 06/26/2014 ML14177A498
2014-18-00 GE Hitachi Nuclear Energy Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 03/31/2014 ML14090A068
2014-17-03 C&D Technologies, Inc. Revision 1 to Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 10/27/2014 ML14310A186
2014-17-02 C&D Technologies, Inc. Updated Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries - Includes List of Affected Utilities 09/22/2014 ML14274A052
2014-17-01 C&D Technologies, Inc. Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 09/16/2014 ML14266A509
2014-17-00 C&D Technologies, Inc. Interim Report - Inability to Complete Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 03/28/2014 ML14094A012
2014-16-00 United Controls International Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SBM Switches 03/19/2014 ML14085A012
2014-15-01 ASCO Valve Incorporated Final Report - Scram Solenoid Valve Not Exhausting Properly 06/16/2014 ML14169A258
2014-15-00 ASCO Valve Incorporated Scram Solenoid Pilot Valve Not Exhausting Properly 03/11/2014 ML14079A026
2014-14-01 United Controls International Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards (Final Report) 04/17/2014 ML14113A370
2014-14-00 United Controls International Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards 03/19/2014 ML14085A013
2014-13-01 Dresser-Rand Company PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert (Final Report) 04/17/2014 ML14113A398
2014-13-00 Dresser-Rand Company PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert 03/17/2014 ML14079A353
2014-12-01 Waterford 3

Allen Bradley Type 700RTC Relay Spurious De-Energizing

04/11/2014 ML14101A467
2014-12-00 Waterford 3

Allen Bradley Type 700RTC Relay Spurious De-Energizing

03/13/2014 ML14079A028
2014-11-01 GE Hitachi Nuclear Energy Closure of Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve 07/23/2014 ML14204A706
2014-11-00 GE Hitachi Nuclear Energy Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve 03/13/2014 ML14072A324
2014-10-01 Valcor Engineering Corporation Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing (Update) 08/15/2014 ML14237A120
2014-10-00 Valcor Engineering Corporation Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing 03/12/2014 ML14079A551
2014-09-00 Nuclear Logistics, Inc. Potential Manufacturing Defect in Replacement Masterpact Cradles 02/26/2014 ML14069A467
2014-08-00 Engine Systems, Inc. Emergency Diesel Generator Staring Air Pressure Regulator Supplied to Brunswick Nuclear Plant 02/14/2014 ML14057A806
2014-07-00 ABB Inc. Instruction Leaflet for CVX & CVX-1 Relays May be Deficient 02/10/2014 ML14055A352
2014-06-00 Weir Valves & Controls USA Interim Report Regarding TRICENTRIC Triple Offset Butterfly Valves 02/07/2014 ML14055A394
2014-05-00 Hilti Notification of a Potentially Safety Relevant Non-Conformance for HSL-3 M24 Carbon Steel Expansion Anchors 01/09/2014 ML14030A179
2014-04-01 Westinghouse Electric Co. Part 21/50.55(e) Closure of Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation 09/08/2014 ML14255A018
2014-04-00 Westinghouse Electric Co. Part 21/50.55(e) Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation 01/29/2014 ML14042A215
2014-03-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly 04/09/2014 ML14112A086
2014-03-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly 01/21/2014 ML14029A197
2014-02-01 CCI Thermal Technologies, Inc. Closure of Nonconformance of an Electrical Tubular Water Heater 02/12/2016 ML16048A250
2014-02-00 CCI Thermal Technologies, Inc. Nonconformance of an Electrical Tubular Water Heater 01/21/2014 ML14034A188
2014-01-00 C&D Technologies, Inc. Loose Battery Vent Assemblies 01/21/2014 ML14034A189