Site Additions in 2021

On this page:

See also New on Our Site for current additions.

December 2021

Devember 23, 2021

NUREG/KM-0017
Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results

Devember 17, 2021

NUREG/CR-7293
The Price-Anderson Act: 2021 Report to Congress, Public Liability Insurance and Indemnity Requirements for an Evolving Commercial Nuclear Industry Office

Devember 15, 2021

NUREG-2220, Volume 5
Fiscal Year 2021 – Agency Financial Report

Devember 2, 2021

NUREG-1415, Volume 35, No. 2
Office of the Inspector General Semiannual Report to Congress: April 1, 2021 – September 30, 2021

Devember 1, 2021

NUREG-1737, Supplement 2
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Oconee Nuclear Station, Units 1, 2 & 3 - Final Report

November 2021

November 24, 2021

NUREG-1885, Revision 14
Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2020

November 24, 2021

NUREG-1437, Supplement 23, Second Renewal
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2 - Draft Report for Comment

November 22, 2021

NUREG-1434, Volume 1 & 2, Revision 5
Standard Technical Specifications – General Electric BWR/6 Plants

November 01, 2021

NUREG-1433, Volume 1 & 2, Revision 5
Standard Technical Specifications — General Electric Plants (BWR/4)

November 01, 2021

NUREG/IA-0470, Volume 2
Nuclear Regulatory Authority Experimental Program to Characterize and Understand High Energy Arcing Fault (HEAF) Phenomena: Basic Arc Test Experimental Data

October 2021

October 29, 2021

NUREG-1350, Volume 33
Information Digest, 2021–2022

October 28, 2021

NUREG/CR-2907, Volume 25
Radioactive Effluents from Nuclear Power Plants: Annual Report 2019

October 27, 2021

NUREG-1432, Volume 1 & 2, Revision 5.0
Standard Technical Specifications — Combustion Engineering Plants

October 20, 2021

NUREG-1431, Volume 2, Revision 5.0
Standard Technical Specifications – Westinghouse Plants: Bases

October 19, 2021

NUREG-0750, Volume 92
Nuclear Regulatory Commission Issuances, July 1, 2020 – December 31, 2020

October 13, 2021

NUREG-1431, Volume 1, Revision 5.0
Standard Technical Specifications Westinghouse Plants: Specifications

October 8, 2021

NUREG-1430, Volume 1 & 2, Revision 5.0
Standard Technical Specifications — Babcock and Wilcox Plants

October 6, 2021

NUREG/CR-7285
Nonradiological Health Consequences from Evacuation and Relocation

September 2021

September 28, 2021

NUREG/CR-3021
Regional Tectonics and Seismicity of Southwestern Iowa

September 27, 2021

NUREG-2159, Revision 1
Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance: Draft Report for Comment

September 27, 2021

NUREG/CR-7278
Technical Basis for the use of Probabilistic Fracture Mechanics in Regulatory Applications: Draft Report for Comment

September 23, 2021

NUREG-1614, Volume 8
Strategic Plan: Fiscal Years 2022-2026: Draft Report for Comment

September 23, 2021

NUREG/KM-0015
Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America: Final Report

September 22, 2021

NUREG-1021, Revision 12
Operator Licensing Examination Standards for Power Reactors

September 21, 2021

NUREG/IA-0527
Analysis of Main Steam Line Break Accident for 3-Loop PWR with RELAP5/MOD3.3 Code

September 21, 2021

NUREG/IA-0526
Simulation of Total Loss of Feedwater LOFT LP-FW-1 Test using RELAP5/MOD3.3

September 21, 2021

NUREG/IA-0525
TRACE VVER-1000/V-320 Model Cross-Code Validation

September 09, 2021

NUREG-2247
Extremely Low Probability of Rupture Version 2 Probabilistic Fracture Mechanics Code

August 2021

August 30, 2021

NUREG/CR-7281
Radiation Evaluation Methodology for Concrete Structures

August 30, 2021

NUREG/CR-7283
Phenomena Identification Ranking Tables for Accident Tolerant Fuel Designs Applicable to Severe Accident Conditions

August 30, 2021

NUREG/CR-7282
Review of Accident Tolerant Fuel Concepts with Implications to Severe Accident Progression and Radiological Releases

August 27, 2021

NUREG/CR-6918, Revision 4
VARSKIN+ 1.0: A Computer Code for Skin Contamination and Dosimetry Assessments

August 25, 2021

NUREG-1437
Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 7, Second Renewal Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2: Draft Report for Comment

August 23, 2021

NUREG/CR-7280
Review of Radiation-Induced Concrete Degradation and Potential Implications for Structures Exposed to High Long-Term Radiation Levels in Nuclear Power Plants

August 20, 2021

NUREG-2245
Technical Review of the 2017 Edition of ASME Code, Section III, Division 5, “High Temperature Reactors”: Draft Report for Comment

August 19, 2021

NUREG-1933
Containing the Atom: Nuclear Regulation in a Changing Environment, 1963-1971

August 19, 2021

NUREG-1610
Controlling the Atom: The Beginnings of Nuclear Regulation 1946-1962

August 06, 2021

NUREG-2248
Environmental Impact Statement for the License Renewal of the Columbia Fuel Fabrication Facility in Richland County, South Carolina – Draft Report for Comment

August 02, 2021

NUREG-2239
Environmental Impact Statement for Interim Storage Partners LLC's License Application for a Consolidated Interim Storage Facility for Spent Nuclear Fuel in Andrews County, Texas: Final Report

July 2021

July 16, 2021

NUREG-0750, Volume 91

Nuclear Regulatory Commission Issuances, January 1, 2020 – June 30, 2020

July 01, 2021

NUREG-1100, Volume 37

Congressional Budget Justification: Fiscal Year 2022

To top of page

June 2021

June 30, 2021

NUREG-2246
Fuel Qualification for Advanced Reactors: Draft Report for Comment

June 30, 2021

NUREG-2242
Replacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030 – Final Report

June 10, 2021

Operating Reactor Analytics
This webpage provides a different view of several aspects of ROP oversight: Findings, Action Matrix, and Performance Indicators.

June 2, 2021

NUREG-0090, Volume 43
Report to Congress on Abnormal Occurrences – Fiscal Year 2020

June 1, 2021

NUREG-1415, Volume 35, No. 1
Office of the Inspector General Semiannual Report to Congress: October 1, 2020 – March 31, 2021
To top of page

May 2021

May 12, 2021

NUREG-2198
The General Methodology of An Integrated Human Event Analysis System (IDHEAS-G)

May 5, 2021

NUREG-2244
HABIT 2.2 Description of Models and Methods
To top of page

April 2021

April 07, 2021

NUREG/CR-7268, Volumes 1 & 2
User's Manual for RESRAD-OFFSITE Code Version 4

April 05, 2021

NUREG/IA-0524
TRACE VVER-440/V-213 Model Cross-Code Validation

Aril 02, 2021

NUREG/CR-7273
Developing a Technical Basis for Embedded Digital Devices and Emerging Technologies
To top of page

March 2021

March 22, 2021

NUREG/CR-7275
Jet Impingement in High-Energy Piping Systems

March 19, 2021

NUREG/KM-0016
Be riskSMART: Guidance for Integrating Risk Insights into NRC Decisions

March 11, 2021

NUREG/CR-6361
Criticality Benchmark Guide for Light-Water-Reactor Fuel in Transportation and Storage Packages
To top of page

February 2021

February 19, 2021

NUREG-1830, Volume 17
Office of Investigations - Annual Report FY 2020

February 17, 2021

NUREG/CR-7271
Application of Point Precipitation Frequency Estimates to Watersheds

February 09, 2021

NUREG/CR-7002, Revision 1
Criteria for Development of Evacuation Time Estimate Studies

February 09, 2021

NUREG/IA-0523
Evaluation for 4-Inch Cold Leg Top-Slot Break LOCA in ATLAS Facility with RELAP5 Mod3.3 Patch5

February 09, 2021

NUREG/IA-0522
RELAP5 and TRACE Constitutive Relations Comparison

February 05, 2021

NUREG-1164
Information on the Confinement Capability of the Facility Disposal Area at West Valley, New York
To top of page

January 2021

January 28, 2021

NUREG-1307, Revision 18
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities, Final Report

January 08, 2021

NUREG/KM-0001, Supplement 2
Three Mile Island Accident of 1979 Knowledge Management Digest - The Cleanup Experience: A Literature Review

January 08, 2021

NUREG/BR-0520, Revision 2
State Programs at the U.S. Nuclear Regulatory Commission, Revision 2

To top of page