Site Additions in 2023

On this page:

See also New on Our Site for current additions.

August 2023

August 31, 2023

NUREG/CR-4644, BNL-NUREG-52004 AN, RW
Geochemical Studies of Commercial Low-Level Radioactive Waste Disposal Sites - Topical Report

NUREG-1339
Resolution of Generic Safety Issue 29: Bolting Degradation or Failure in Nuclear Power Plants

August 29, 2023

NUREG/CR-7300
Radiation Accident Dose and Simulated Loss-of-Coolant Accident Test of Low Voltage Cables

August 17, 2023

NUREG-2263
Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor, Final Report

August 04, 2023

NUREG/CR-7305
Metal Fuel Qualification: Fuel Assessment Using NRC NUREG-2246, "Fuel Qualification for Advanced Reactors"

August 01, 2023

NUREG/CR-7287
Numerical Modeling of Local Intense Precipitation Processes

To top of page

July 2023

July 24, 2023

NUREG-2221, Supplement 1
Technical Bases for Changes in the Subsequent License Renewal Guidance Documents, NUREG–2191, Revision 1, Draft Report for Comment and NUREG–2192, Revision 1 - Draft Report for Comment

July 20, 2023

NUREG-2192, Revision 1
Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants– Draft Report for Comment

July 12, 2023

NUREG-2191, Volumes 1 & 2, Revision 1
Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report – Draft Report for Comment

To top of page

June 2023

June 15, 2023

NUREG/CR-2907, Volume 26
Radioactive Effluents from Nuclear Power Plants: Annual Report 2020

June 14, 2023

NUREG-0090, Volume 45
Report to Congress on Abnormal Occurrences – Fiscal Year 2022

To top of page

May 2023

May 30, 2023

NUREG-2261
Artificial Intelligence Strategic Plan: Fiscal Years 2023-2027

May 19, 2023

NUREG/CR-7302, ORNL/TM-2023/2679
Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses

May 04, 2023

NUREG/CR-7290
Convection-Permitting Modeling for Intense Precipitation Processes

May 02, 2023

NUREG-2262, EPRI 3002025942
High Energy Arcing Fault Frequency and Consequence Modeling – Final Report

To top of page

April 2023

April 24, 2023

NUREG/CR-7133
Synthesis of Extreme Storm Rainfall and Probable Maximum Precipitation in the Southeastern U.S. Pilot Region

April 18, 2023

NUREG/IA-0532
MELCOR – DAKOTA Coupling for Uncertainty Analyses, in a SNAP Environment/Architecture

April 17, 2023

NUREG/CR-7277
Primary Water Stress Corrosion Cracking of High-Chromium Nickel-Base Welds at or Near Interfaces – 2020

April 07, 2023

NUREG/CR-7276
Primary Water Stress Corrosion Cracking of High-Chromium Nickel-Base Welds – 2018

To top of page

March 2023

March 31, 2023

NUREG-0750, Volume 96
Nuclear Regulatory Commission Issuances, July 1, 2022 – December 31, 2022

March 24, 2023

NUREG/CR-7284, ORNL/TM-2017/278
SCALE 6.2 Lattice Physics Performance Assessment

March 22, 2023

NUREG-1555, Supplement 1, Revision 2
Standard Review Plans for Environmental Reviews for Nuclear Power Plants - Supplement 1: Operating License Renewal — Draft Report for Comment

NUREG-1437, Volumes 1 & 2, Revision 2
Generic Environmental Impact Statement for License Renewal of Nuclear Plants—Draft Report for Comment

March 17, 2023

NUREG-2250, Volume 2
Annual Evaluation Plan: Fiscal Year 2024

March 13, 2023

NUREG-1100, Volume 39
Congressional Budget Justification: Fiscal Year 2024

March 03, 2023

NUREG-2264, Volumes 1-4
Weapons Safety Assessment

March 02, 2023

NUREG-1830, Volume 19
Office of Investigations Annual Report Fiscal Year 2022

NUREG/IA-0538
Natural Circulation Assessment of a PWR Loss of Off-site Power with RELAP5/MOD 3.2

NUREG/IA-0537
Plant Application with TRACE Code of the PKL III G1 Test Series. Study on Heat Transfer Mechanisms in the SG in Presence of Nitrogen, Steam and Water as a Function of the Primary Coolant Inventory in Single & Double Loop Operation

NUREG/IA-0536
RELAP5 Simulation of Total Loss of Feedwater in Two-Loop PWR

To top of page

February 2023

February 24, 2023

NUREG-1350, Volume 34
Information Digest, 2022–2023

February 14, 2023

NUREG-1307, Revision 19
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities — Final Report

January 2023

January 31, 2023

NUREG-2245
Technical Review of the 2017 Edition of ASME Code, Section III, Division 5, "High Temperature Reactors"

NUREG-2183, Supplement 1
Environmental Impact Statement Supplement Related to the Operating License for the SHINE Medical Isotope Production Facility – Final Report

January 23, 2023

NUREG/CR-7301, PNNL-33732
Ultrasonic Modeling and Simulation for Nuclear Nondestructive Evaluation

January 09, 2023

NUREG/BR-0254, Revision 10
Payment Methods

January 04, 2023

NUREG-2243
Environmental Impact Statement for the Disposal of Mine Waste at the United Nuclear Corporation Mill Site in McKinley County, New Mexico – Final Report

To top of page