Advanced Reactors Sub-Arena

Advanced reactors comprise one of four sub-arenas that the staff of the U.S. Nuclear Regulatory Commission (NRC) identified in considering which areas of the reactor safety arena to target for greater use of risk information. This page summarizes the following aspects of this sub-arena with expanding menus:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

List of Risk-Informed and Performance-Based Activities

This list shows the ongoing licensing initiatives, projects, and activities that the staff of the U.S. Nuclear Regulatory Commission (NRC) has targeted for greater use of risk information in the Advanced Reactors Sub-Arena within the Reactor Safety Arena:

Advanced Reactor Content of Application Project

double arrow head (chevron) pointing downward FY 2022

See the Advanced Reactor Content of Application Project public webpage for an updated listing of public meeting and publicly available documents.

To top of pageReturn to list

Technical Assistance for Research on Innovative Methods and Technologies to Enhance Seismic Safety for Design and Construction of Commercial Reactors

double arrow head (chevron) pointing downward FY 2022

The staff reviewed and evaluated the Nuclear Energy Institute (NEI) 18 04, Revision 1, “Risk-Informed Performance-Based Technology Inclusive Guidance for Non-Light Water Reactor Licensing Basis Development,” issued August 2019, and RG 1.233, “Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors.” After reviewing and evaluating the American Society of Civil Engineer (ASCE) standards ASCE 1-22 (Draft), “Standard for Geotechnical Analysis, Design, Construction, Inspection and Monitoring of Nuclear Safety-Related Structures,” ASCE 4-16, “Seismic Analysis of Safety-Related Nuclear Structures,” and 43-18 (Draft), “Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities,” the NUREG/CR 7253, “Technical Considerations for Seismic Isolation of Nuclear Facilities,” NUREG/CR 7254, “Seismic Isolation of Nuclear Power Plants using Sliding Bearings,” and NUREG/CR 7255, “Seismic Isolation of Nuclear Power Plants using Elastomeric Bearings,” the staff drafted two pre-decisional regulatory guidance: “Technology-Inclusive, Risk-Informed, and Performance-Based Methodology for Seismic Design of Commercial Nuclear Plants” and “Seismically Isolated Nuclear Power Plants” as these two regulatory guidance are associated with the development of 10 CFR 53 that has not been finalized. These two drafts are publicly available now (ML22276A149 and ML22276A154) and will be finalized based on the public feedback.

To top of pageReturn to list

Risk-Informed Review of Small Modular Reactor (SMR) Designs

double arrow head (chevron) pointing downward FY 2022

No Update

To top of pageReturn to list

Non-Light Water Reactor Licensing Modernization

double arrow head (chevron) pointing downward FY 2022

Staff provided feedback on the Westinghouse eVinci microreactor white paper EVR-SAR-GL-002-NP, Revision 0 “Licensing Basis Event Identification, SSC Classification and Defense-in-Depth Adequacy”. The white paper presents the intended processes for developing the selection of Licensing Basis Events, the safety classification of structures, systems, and components, and an evaluation of defense-in-depth (DID) Adequacy.

To top of pageReturn to list

Risk-informed Emergency Planning Zone Size Evaluation

double arrow head (chevron) pointing downward FY 2022

The final rule package (SECY-22-0001) was provided to the Commission January 18, 2022.

To top of pageReturn to list

Advanced Reactor Regulatory Framework

double arrow head (chevron) pointing downward FY 2022

On September 30, 2022, the NRC staff released the draft proposed rulemaking package, including the draft proposed rule language for both Framework A and B, the preamble (e.g., statements of consideration), and five draft guidance documents supporting the draft proposed rule language. In May/June 2022, NRC staff released its second iteration of preliminary proposed rule language for Framework A (Probabilistic Risk Assessment (PRA)-led approach) and the first iteration of the preliminary proposed rule language for Framework B (Traditional Use of Risks Impacts, Principal Design Criteria, and the Alternative Evaluation of Risk Insights (AERI) approach). In November 2022, staff will present to the Commission a paper outlining options for a risk-informed regulatory framework for commercial fusion energy systems.

To top of pageReturn to list

Physical Security for Advanced Reactors

double arrow head (chevron) pointing downward FY 2022

On January 20, 2022, NRC staff provided an update on rulemaking at a public meeting

To top of pageReturn to list

Regulatory Guidance on Advanced Non-LWR PRA Acceptability

To top of pageReturn to list

Page Last Reviewed/Updated Thursday, August 31, 2023